Cargando…

Decisions on train rescheduling and locomotive assignment during the COVID-19 outbreak: A case of the Beijing-Tianjin intercity railway

Travel restriction measures have been widely implemented to curb the continued spread of COVID-19 during the Chinese Lunar New Year celebrations. Many operation lines and train schedules of China's railway were either heavily adjusted or canceled. In this study, a mixed-integer linear programmi...

Descripción completa

Detalles Bibliográficos
Autores principales: Kang, Liujiang, Xiao, Yue, Sun, Huijun, Wu, Jianjun, Luo, Sida, Buhigiro, Nsabimana
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Elsevier B.V. 2022
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8123518/
https://www.ncbi.nlm.nih.gov/pubmed/34024966
http://dx.doi.org/10.1016/j.dss.2021.113600
_version_ 1783692929911488512
author Kang, Liujiang
Xiao, Yue
Sun, Huijun
Wu, Jianjun
Luo, Sida
Buhigiro, Nsabimana
author_facet Kang, Liujiang
Xiao, Yue
Sun, Huijun
Wu, Jianjun
Luo, Sida
Buhigiro, Nsabimana
author_sort Kang, Liujiang
collection PubMed
description Travel restriction measures have been widely implemented to curb the continued spread of COVID-19 during the Chinese Lunar New Year celebrations. Many operation lines and train schedules of China's railway were either heavily adjusted or canceled. In this study, a mixed-integer linear programming model and a two-step solution algorithm were developed to handle such large-scale adjustments. The formulation considers a flexible time window for each operation line and locomotive traction operations, and minimizes the number of locomotives utilized with their total idle time for train rescheduling and locomotive assignment, respectively. The solution algorithm determines the minimum locomotive fleet size based on the optimal train rescheduling results; it then reduces the traction idle time of locomotives. In response to the uncertainty of COVID-19, two tailored approaches were also designed to recover and remove operation lines, which can insert and cut operation lines based on the results of locomotive assignment. Finally, we conducted a case study of the Beijing-Tianjin intercity railway from the start of the COVID-19 outbreak to the recovery of operations.
format Online
Article
Text
id pubmed-8123518
institution National Center for Biotechnology Information
language English
publishDate 2022
publisher Elsevier B.V.
record_format MEDLINE/PubMed
spelling pubmed-81235182021-05-17 Decisions on train rescheduling and locomotive assignment during the COVID-19 outbreak: A case of the Beijing-Tianjin intercity railway Kang, Liujiang Xiao, Yue Sun, Huijun Wu, Jianjun Luo, Sida Buhigiro, Nsabimana Decis Support Syst Article Travel restriction measures have been widely implemented to curb the continued spread of COVID-19 during the Chinese Lunar New Year celebrations. Many operation lines and train schedules of China's railway were either heavily adjusted or canceled. In this study, a mixed-integer linear programming model and a two-step solution algorithm were developed to handle such large-scale adjustments. The formulation considers a flexible time window for each operation line and locomotive traction operations, and minimizes the number of locomotives utilized with their total idle time for train rescheduling and locomotive assignment, respectively. The solution algorithm determines the minimum locomotive fleet size based on the optimal train rescheduling results; it then reduces the traction idle time of locomotives. In response to the uncertainty of COVID-19, two tailored approaches were also designed to recover and remove operation lines, which can insert and cut operation lines based on the results of locomotive assignment. Finally, we conducted a case study of the Beijing-Tianjin intercity railway from the start of the COVID-19 outbreak to the recovery of operations. Elsevier B.V. 2022-10 2021-05-15 /pmc/articles/PMC8123518/ /pubmed/34024966 http://dx.doi.org/10.1016/j.dss.2021.113600 Text en © 2021 Elsevier B.V. All rights reserved. Since January 2020 Elsevier has created a COVID-19 resource centre with free information in English and Mandarin on the novel coronavirus COVID-19. The COVID-19 resource centre is hosted on Elsevier Connect, the company's public news and information website. Elsevier hereby grants permission to make all its COVID-19-related research that is available on the COVID-19 resource centre - including this research content - immediately available in PubMed Central and other publicly funded repositories, such as the WHO COVID database with rights for unrestricted research re-use and analyses in any form or by any means with acknowledgement of the original source. These permissions are granted for free by Elsevier for as long as the COVID-19 resource centre remains active.
spellingShingle Article
Kang, Liujiang
Xiao, Yue
Sun, Huijun
Wu, Jianjun
Luo, Sida
Buhigiro, Nsabimana
Decisions on train rescheduling and locomotive assignment during the COVID-19 outbreak: A case of the Beijing-Tianjin intercity railway
title Decisions on train rescheduling and locomotive assignment during the COVID-19 outbreak: A case of the Beijing-Tianjin intercity railway
title_full Decisions on train rescheduling and locomotive assignment during the COVID-19 outbreak: A case of the Beijing-Tianjin intercity railway
title_fullStr Decisions on train rescheduling and locomotive assignment during the COVID-19 outbreak: A case of the Beijing-Tianjin intercity railway
title_full_unstemmed Decisions on train rescheduling and locomotive assignment during the COVID-19 outbreak: A case of the Beijing-Tianjin intercity railway
title_short Decisions on train rescheduling and locomotive assignment during the COVID-19 outbreak: A case of the Beijing-Tianjin intercity railway
title_sort decisions on train rescheduling and locomotive assignment during the covid-19 outbreak: a case of the beijing-tianjin intercity railway
topic Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8123518/
https://www.ncbi.nlm.nih.gov/pubmed/34024966
http://dx.doi.org/10.1016/j.dss.2021.113600
work_keys_str_mv AT kangliujiang decisionsontrainreschedulingandlocomotiveassignmentduringthecovid19outbreakacaseofthebeijingtianjinintercityrailway
AT xiaoyue decisionsontrainreschedulingandlocomotiveassignmentduringthecovid19outbreakacaseofthebeijingtianjinintercityrailway
AT sunhuijun decisionsontrainreschedulingandlocomotiveassignmentduringthecovid19outbreakacaseofthebeijingtianjinintercityrailway
AT wujianjun decisionsontrainreschedulingandlocomotiveassignmentduringthecovid19outbreakacaseofthebeijingtianjinintercityrailway
AT luosida decisionsontrainreschedulingandlocomotiveassignmentduringthecovid19outbreakacaseofthebeijingtianjinintercityrailway
AT buhigironsabimana decisionsontrainreschedulingandlocomotiveassignmentduringthecovid19outbreakacaseofthebeijingtianjinintercityrailway