Cargando…

Real-Time Structural Monitoring of the Multi-Point Hoisting of a Long-Span Converter Station Steel Structure

In the process of using a long-span converter station steel structure, engineering disasters can easily occur. Structural monitoring is an important method to reduce hoisting risk. In previous engineering cases, the structural monitoring of long-span converter station steel structure hoisting is rar...

Descripción completa

Detalles Bibliográficos
Autores principales: Zhu, Yunfeng, Gao, Yi, Zeng, Qinghe, Liao, Jin, Liu, Zhen, Zhou, Cuiying
Formato: Online Artículo Texto
Lenguaje:English
Publicado: MDPI 2021
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8309508/
https://www.ncbi.nlm.nih.gov/pubmed/34300477
http://dx.doi.org/10.3390/s21144737
_version_ 1783728538021527552
author Zhu, Yunfeng
Gao, Yi
Zeng, Qinghe
Liao, Jin
Liu, Zhen
Zhou, Cuiying
author_facet Zhu, Yunfeng
Gao, Yi
Zeng, Qinghe
Liao, Jin
Liu, Zhen
Zhou, Cuiying
author_sort Zhu, Yunfeng
collection PubMed
description In the process of using a long-span converter station steel structure, engineering disasters can easily occur. Structural monitoring is an important method to reduce hoisting risk. In previous engineering cases, the structural monitoring of long-span converter station steel structure hoisting is rare. Thus, no relevant hoisting experience can be referenced. Traditional monitoring methods have a small scope of application, making it difficult to coordinate monitoring and construction control. In the monitoring process, many problems arise, such as complicated installation processes, large-scale data processing, and large-scale installation errors. With a real-time structural monitoring system, the mechanical changes in the long-span converter station steel structure during the hoisting process can be monitored in real-time in order to achieve real-time warning of engineering disasters, timely identification of engineering issues, and allow for rapid decision-making, thus avoiding the occurrence of engineering disasters. Based on this concept, automatic monitoring and manual measurement of the mechanical changes in the longest long-span converter station steel structure in the world is carried out, and the monitoring results were compared with the corresponding numerical simulation results in order to develop a real-time structural monitoring system for the whole long-span converter station steel structure’s multi-point lifting process. This approach collects the monitoring data and outputs the deflection, stress, strain, wind force, and temperature of the long-span converter station steel structure in real-time, enabling real-time monitoring to ensure the safety of the lifting process. This research offers a new method and basis for the structural monitoring of the multi-point hoisting of a long-span converter station steel structure.
format Online
Article
Text
id pubmed-8309508
institution National Center for Biotechnology Information
language English
publishDate 2021
publisher MDPI
record_format MEDLINE/PubMed
spelling pubmed-83095082021-07-25 Real-Time Structural Monitoring of the Multi-Point Hoisting of a Long-Span Converter Station Steel Structure Zhu, Yunfeng Gao, Yi Zeng, Qinghe Liao, Jin Liu, Zhen Zhou, Cuiying Sensors (Basel) Technical Note In the process of using a long-span converter station steel structure, engineering disasters can easily occur. Structural monitoring is an important method to reduce hoisting risk. In previous engineering cases, the structural monitoring of long-span converter station steel structure hoisting is rare. Thus, no relevant hoisting experience can be referenced. Traditional monitoring methods have a small scope of application, making it difficult to coordinate monitoring and construction control. In the monitoring process, many problems arise, such as complicated installation processes, large-scale data processing, and large-scale installation errors. With a real-time structural monitoring system, the mechanical changes in the long-span converter station steel structure during the hoisting process can be monitored in real-time in order to achieve real-time warning of engineering disasters, timely identification of engineering issues, and allow for rapid decision-making, thus avoiding the occurrence of engineering disasters. Based on this concept, automatic monitoring and manual measurement of the mechanical changes in the longest long-span converter station steel structure in the world is carried out, and the monitoring results were compared with the corresponding numerical simulation results in order to develop a real-time structural monitoring system for the whole long-span converter station steel structure’s multi-point lifting process. This approach collects the monitoring data and outputs the deflection, stress, strain, wind force, and temperature of the long-span converter station steel structure in real-time, enabling real-time monitoring to ensure the safety of the lifting process. This research offers a new method and basis for the structural monitoring of the multi-point hoisting of a long-span converter station steel structure. MDPI 2021-07-11 /pmc/articles/PMC8309508/ /pubmed/34300477 http://dx.doi.org/10.3390/s21144737 Text en © 2021 by the authors. https://creativecommons.org/licenses/by/4.0/Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/).
spellingShingle Technical Note
Zhu, Yunfeng
Gao, Yi
Zeng, Qinghe
Liao, Jin
Liu, Zhen
Zhou, Cuiying
Real-Time Structural Monitoring of the Multi-Point Hoisting of a Long-Span Converter Station Steel Structure
title Real-Time Structural Monitoring of the Multi-Point Hoisting of a Long-Span Converter Station Steel Structure
title_full Real-Time Structural Monitoring of the Multi-Point Hoisting of a Long-Span Converter Station Steel Structure
title_fullStr Real-Time Structural Monitoring of the Multi-Point Hoisting of a Long-Span Converter Station Steel Structure
title_full_unstemmed Real-Time Structural Monitoring of the Multi-Point Hoisting of a Long-Span Converter Station Steel Structure
title_short Real-Time Structural Monitoring of the Multi-Point Hoisting of a Long-Span Converter Station Steel Structure
title_sort real-time structural monitoring of the multi-point hoisting of a long-span converter station steel structure
topic Technical Note
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8309508/
https://www.ncbi.nlm.nih.gov/pubmed/34300477
http://dx.doi.org/10.3390/s21144737
work_keys_str_mv AT zhuyunfeng realtimestructuralmonitoringofthemultipointhoistingofalongspanconverterstationsteelstructure
AT gaoyi realtimestructuralmonitoringofthemultipointhoistingofalongspanconverterstationsteelstructure
AT zengqinghe realtimestructuralmonitoringofthemultipointhoistingofalongspanconverterstationsteelstructure
AT liaojin realtimestructuralmonitoringofthemultipointhoistingofalongspanconverterstationsteelstructure
AT liuzhen realtimestructuralmonitoringofthemultipointhoistingofalongspanconverterstationsteelstructure
AT zhoucuiying realtimestructuralmonitoringofthemultipointhoistingofalongspanconverterstationsteelstructure