Optimal placement of Phasor Measurement Unit considering System Observability Redundancy Index: case study of the Kenya power transmission network

Modern power systems require advanced monitoring and control, a capability made possible by Phasor Measurement Units (PMUs) aided by synchrophasor technology. Because PMUs have significant costs, it is necessary to optimally place them in an electrical power network. This paper proposes the Optimal...

Descripción completa

Detalles Bibliográficos
Autores principales: Okendo, Edwin Otieno, Wekesa, Cyrus Wabuge, Saulo, Michael Juma
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Elsevier 2021
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8342912/
https://www.ncbi.nlm.nih.gov/pubmed/34386630
http://dx.doi.org/10.1016/j.heliyon.2021.e07670
_version_ 1783734163620233216
author Okendo, Edwin Otieno
Wekesa, Cyrus Wabuge
Saulo, Michael Juma
author_facet Okendo, Edwin Otieno
Wekesa, Cyrus Wabuge
Saulo, Michael Juma
author_sort Okendo, Edwin Otieno
collection PubMed
description Modern power systems require advanced monitoring and control, a capability made possible by Phasor Measurement Units (PMUs) aided by synchrophasor technology. Because PMUs have significant costs, it is necessary to optimally place them in an electrical power network. This paper proposes the Optimal PMU Placement (OPP) on the Kenya Power Transmission Network (Nairobi Region 30-bus system) using the existing methods; The Depth-First method, the Mixed Integer Linear Programming (MILP) using intlinprog solver, and the Artificial Bee Colony (ABC) algorithm. The algorithms are first implemented on the IEEE-14 and 30 bus test systems for verification before implementing the Kenya Power Transmission Network (Nairobi Region 30-bus system). Finally, the results for the three methods are compared. A key consideration is the System Observability Redundancy Index (SORI) under normal baseload conditions, with and without the inclusion of Zero Injection Buses (ZIBs). A higher value of SORI increases the measurement redundancy of the PMUs installed at a given bus. This paper further proposes the modelling of ZIB with adjacent buses by considering their Observability Index (OI). The case studies are modelled in Power System Analysis Toolbox (PSAT), and the simulations are carried out in MATLAB. From the simulation results, the ABC algorithm gives the optimal solution with the highest SORI compared to the Depth-First method and MILP, with the exclusion of the ZIB. The Nairobi region 30-bus system require 12 PMUs located at buses; 2, 5, 8, 9, 11, 13, 14, 16, 21, 24, 27 and 29 for complete power system observability with a SORI of 43.
format Online
Article
Text
id pubmed-8342912
institution National Center for Biotechnology Information
language English
publishDate 2021
publisher Elsevier
record_format MEDLINE/PubMed
spelling pubmed-83429122021-08-11 Optimal placement of Phasor Measurement Unit considering System Observability Redundancy Index: case study of the Kenya power transmission network Okendo, Edwin Otieno Wekesa, Cyrus Wabuge Saulo, Michael Juma Heliyon Research Article Modern power systems require advanced monitoring and control, a capability made possible by Phasor Measurement Units (PMUs) aided by synchrophasor technology. Because PMUs have significant costs, it is necessary to optimally place them in an electrical power network. This paper proposes the Optimal PMU Placement (OPP) on the Kenya Power Transmission Network (Nairobi Region 30-bus system) using the existing methods; The Depth-First method, the Mixed Integer Linear Programming (MILP) using intlinprog solver, and the Artificial Bee Colony (ABC) algorithm. The algorithms are first implemented on the IEEE-14 and 30 bus test systems for verification before implementing the Kenya Power Transmission Network (Nairobi Region 30-bus system). Finally, the results for the three methods are compared. A key consideration is the System Observability Redundancy Index (SORI) under normal baseload conditions, with and without the inclusion of Zero Injection Buses (ZIBs). A higher value of SORI increases the measurement redundancy of the PMUs installed at a given bus. This paper further proposes the modelling of ZIB with adjacent buses by considering their Observability Index (OI). The case studies are modelled in Power System Analysis Toolbox (PSAT), and the simulations are carried out in MATLAB. From the simulation results, the ABC algorithm gives the optimal solution with the highest SORI compared to the Depth-First method and MILP, with the exclusion of the ZIB. The Nairobi region 30-bus system require 12 PMUs located at buses; 2, 5, 8, 9, 11, 13, 14, 16, 21, 24, 27 and 29 for complete power system observability with a SORI of 43. Elsevier 2021-07-27 /pmc/articles/PMC8342912/ /pubmed/34386630 http://dx.doi.org/10.1016/j.heliyon.2021.e07670 Text en © 2021 The Author(s) https://creativecommons.org/licenses/by-nc-nd/4.0/This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/).
spellingShingle Research Article
Okendo, Edwin Otieno
Wekesa, Cyrus Wabuge
Saulo, Michael Juma
Optimal placement of Phasor Measurement Unit considering System Observability Redundancy Index: case study of the Kenya power transmission network
title Optimal placement of Phasor Measurement Unit considering System Observability Redundancy Index: case study of the Kenya power transmission network
title_full Optimal placement of Phasor Measurement Unit considering System Observability Redundancy Index: case study of the Kenya power transmission network
title_fullStr Optimal placement of Phasor Measurement Unit considering System Observability Redundancy Index: case study of the Kenya power transmission network
title_full_unstemmed Optimal placement of Phasor Measurement Unit considering System Observability Redundancy Index: case study of the Kenya power transmission network
title_short Optimal placement of Phasor Measurement Unit considering System Observability Redundancy Index: case study of the Kenya power transmission network
title_sort optimal placement of phasor measurement unit considering system observability redundancy index: case study of the kenya power transmission network
topic Research Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8342912/
https://www.ncbi.nlm.nih.gov/pubmed/34386630
http://dx.doi.org/10.1016/j.heliyon.2021.e07670
work_keys_str_mv AT okendoedwinotieno optimalplacementofphasormeasurementunitconsideringsystemobservabilityredundancyindexcasestudyofthekenyapowertransmissionnetwork
AT wekesacyruswabuge optimalplacementofphasormeasurementunitconsideringsystemobservabilityredundancyindexcasestudyofthekenyapowertransmissionnetwork
AT saulomichaeljuma optimalplacementofphasormeasurementunitconsideringsystemobservabilityredundancyindexcasestudyofthekenyapowertransmissionnetwork