Cargando…

A method for failures grouping and priority ranking case study: Operating gas compression plant

The gas compression plant is a core and major unit in oil and gas industries that have high gas oil ratio or considerable gas production. Compressed gas is needed as fuel, support processing handling, increase reservoir builds up pressure by gas injection as well as a useful product. Gas plants are...

Descripción completa

Detalles Bibliográficos
Autores principales: Faris, Mohamed Hussein M., Elhussein, Elamin, Ali, Hassan Osman
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Elsevier 2021
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8374281/
https://www.ncbi.nlm.nih.gov/pubmed/34434790
http://dx.doi.org/10.1016/j.mex.2021.101268
_version_ 1783740082158567424
author Faris, Mohamed Hussein M.
Elhussein, Elamin
Ali, Hassan Osman
author_facet Faris, Mohamed Hussein M.
Elhussein, Elamin
Ali, Hassan Osman
author_sort Faris, Mohamed Hussein M.
collection PubMed
description The gas compression plant is a core and major unit in oil and gas industries that have high gas oil ratio or considerable gas production. Compressed gas is needed as fuel, support processing handling, increase reservoir builds up pressure by gas injection as well as a useful product. Gas plants are critical and dangerous working location and it is classified as a critical zone due to circumstance parameters like high pressure, high temperature, gas specifications and the potential to impact to human health, safety, environment and possibility to impact invested revenues in case of incidents. Therefore, all recorded compression plant operational failures shall be assessed and reviewed in order to decrease the unit down time and increase plant safety and efficiency. In general, limited studies were conducted in gas plant maintenance management. This paper studied a working gas compression unit in an operating oil and gas field in order to present the followings: • A model of failures raking and sorting in gas compression plants based on total down time importance (TDTI) grouping. • A model of failures ranking by using the risk priority number (RPN). RPN is giving priorities based on associated risk and TDTI as a new method is providing rankings based on maximum contribution to the total occurred down time. Therefore, the study is elaborating to demonstrate these two methods and highlighted the areas of difference which need attention of the owner and the site working team.
format Online
Article
Text
id pubmed-8374281
institution National Center for Biotechnology Information
language English
publishDate 2021
publisher Elsevier
record_format MEDLINE/PubMed
spelling pubmed-83742812021-08-24 A method for failures grouping and priority ranking case study: Operating gas compression plant Faris, Mohamed Hussein M. Elhussein, Elamin Ali, Hassan Osman MethodsX Method Article The gas compression plant is a core and major unit in oil and gas industries that have high gas oil ratio or considerable gas production. Compressed gas is needed as fuel, support processing handling, increase reservoir builds up pressure by gas injection as well as a useful product. Gas plants are critical and dangerous working location and it is classified as a critical zone due to circumstance parameters like high pressure, high temperature, gas specifications and the potential to impact to human health, safety, environment and possibility to impact invested revenues in case of incidents. Therefore, all recorded compression plant operational failures shall be assessed and reviewed in order to decrease the unit down time and increase plant safety and efficiency. In general, limited studies were conducted in gas plant maintenance management. This paper studied a working gas compression unit in an operating oil and gas field in order to present the followings: • A model of failures raking and sorting in gas compression plants based on total down time importance (TDTI) grouping. • A model of failures ranking by using the risk priority number (RPN). RPN is giving priorities based on associated risk and TDTI as a new method is providing rankings based on maximum contribution to the total occurred down time. Therefore, the study is elaborating to demonstrate these two methods and highlighted the areas of difference which need attention of the owner and the site working team. Elsevier 2021-02-11 /pmc/articles/PMC8374281/ /pubmed/34434790 http://dx.doi.org/10.1016/j.mex.2021.101268 Text en © 2021 The Author(s). Published by Elsevier B.V. https://creativecommons.org/licenses/by/4.0/This is an open access article under the CC BY license (http://creativecommons.org/licenses/by/4.0/).
spellingShingle Method Article
Faris, Mohamed Hussein M.
Elhussein, Elamin
Ali, Hassan Osman
A method for failures grouping and priority ranking case study: Operating gas compression plant
title A method for failures grouping and priority ranking case study: Operating gas compression plant
title_full A method for failures grouping and priority ranking case study: Operating gas compression plant
title_fullStr A method for failures grouping and priority ranking case study: Operating gas compression plant
title_full_unstemmed A method for failures grouping and priority ranking case study: Operating gas compression plant
title_short A method for failures grouping and priority ranking case study: Operating gas compression plant
title_sort method for failures grouping and priority ranking case study: operating gas compression plant
topic Method Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8374281/
https://www.ncbi.nlm.nih.gov/pubmed/34434790
http://dx.doi.org/10.1016/j.mex.2021.101268
work_keys_str_mv AT farismohamedhusseinm amethodforfailuresgroupingandpriorityrankingcasestudyoperatinggascompressionplant
AT elhusseinelamin amethodforfailuresgroupingandpriorityrankingcasestudyoperatinggascompressionplant
AT alihassanosman amethodforfailuresgroupingandpriorityrankingcasestudyoperatinggascompressionplant
AT farismohamedhusseinm methodforfailuresgroupingandpriorityrankingcasestudyoperatinggascompressionplant
AT elhusseinelamin methodforfailuresgroupingandpriorityrankingcasestudyoperatinggascompressionplant
AT alihassanosman methodforfailuresgroupingandpriorityrankingcasestudyoperatinggascompressionplant