Cargando…

Review of the existing maximum residue levels for cyflumetofen according to Article 12 of Regulation (EC) No 396/2005

According to Article 12 of Regulation (EC) No 396/2005, EFSA has reviewed the maximum residue levels (MRLs) currently established at European level for the pesticide active substance cyflumetofen. To assess the occurrence of cyflumetofen residues in plants, processed commodities, rotational crops an...

Descripción completa

Detalles Bibliográficos
Autores principales: Bellisai, Giulia, Bernasconi, Giovanni, Brancato, Alba, Carrasco Cabrera, Luis, Ferreira, Lucien, Giner, German, Greco, Luna, Jarrah, Samira, Kazocina, Aija, Leuschner, Renata, Magrans, Jose Oriol, Miron, Ileana, Nave, Stefanie, Pedersen, Ragnor, Reich, Hermine, Ruocco, Silvia, Santos, Miguel, Scarlato, Alessia Pia, Theobald, Anne, Vagenende, Benedicte, Verani, Alessia
Formato: Online Artículo Texto
Lenguaje:English
Publicado: John Wiley and Sons Inc. 2021
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8392007/
https://www.ncbi.nlm.nih.gov/pubmed/34484447
http://dx.doi.org/10.2903/j.efsa.2021.6812
Descripción
Sumario:According to Article 12 of Regulation (EC) No 396/2005, EFSA has reviewed the maximum residue levels (MRLs) currently established at European level for the pesticide active substance cyflumetofen. To assess the occurrence of cyflumetofen residues in plants, processed commodities, rotational crops and livestock, EFSA considered the conclusions derived in the framework of Commission Regulation (EU) No 188/2011 and the MRLs established by the Codex Alimentarius Commission as well as European authorisations reported by Member States and the UK. Based on the assessment of the available data, MRL proposals were derived and a consumer risk assessment was carried out. Although no apparent risk to consumers was identified, some information required by the regulatory framework was missing. Hence, the consumer risk assessment is considered indicative only and some MRL proposals derived by EFSA still require further consideration by risk managers.