Cargando…
Management of the “building-base system” action, using a life cycle model
This research aims to highlight the problem of creating various models that reflect the life cycle of the “building-base” system, and link the reliability of this system with its technical condition. Based on the proposed model of the life cycle “reconstructed building-base”, it is possible to regul...
Autores principales: | , , , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Nature Publishing Group UK
2021
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8458470/ https://www.ncbi.nlm.nih.gov/pubmed/34552184 http://dx.doi.org/10.1038/s41598-021-98367-0 |
_version_ | 1784571310115913728 |
---|---|
author | Sobczak-Piąstka, Justyna Kichaeva, Oksana Firsov, Pavlo Zolotov, Sergey Famulyak, Yuriy |
author_facet | Sobczak-Piąstka, Justyna Kichaeva, Oksana Firsov, Pavlo Zolotov, Sergey Famulyak, Yuriy |
author_sort | Sobczak-Piąstka, Justyna |
collection | PubMed |
description | This research aims to highlight the problem of creating various models that reflect the life cycle of the “building-base” system, and link the reliability of this system with its technical condition. Based on the proposed model of the life cycle “reconstructed building-base”, it is possible to regulate the condition of the building towards its restoration, changing the category of technical condition to higher and obtain new, adequate to the current state, reliability indicators. During the operation of this model, it is possible to control the system management on the basis of the obtained quantitative values of reliability. The result of the reliability calculation is the determination of such a technical solution of strengthening the “building-base” system, which will provide a given level of reliability. The research provides an example of the calculation of an operable monumental building before and after its restoration. |
format | Online Article Text |
id | pubmed-8458470 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2021 |
publisher | Nature Publishing Group UK |
record_format | MEDLINE/PubMed |
spelling | pubmed-84584702021-09-24 Management of the “building-base system” action, using a life cycle model Sobczak-Piąstka, Justyna Kichaeva, Oksana Firsov, Pavlo Zolotov, Sergey Famulyak, Yuriy Sci Rep Article This research aims to highlight the problem of creating various models that reflect the life cycle of the “building-base” system, and link the reliability of this system with its technical condition. Based on the proposed model of the life cycle “reconstructed building-base”, it is possible to regulate the condition of the building towards its restoration, changing the category of technical condition to higher and obtain new, adequate to the current state, reliability indicators. During the operation of this model, it is possible to control the system management on the basis of the obtained quantitative values of reliability. The result of the reliability calculation is the determination of such a technical solution of strengthening the “building-base” system, which will provide a given level of reliability. The research provides an example of the calculation of an operable monumental building before and after its restoration. Nature Publishing Group UK 2021-09-22 /pmc/articles/PMC8458470/ /pubmed/34552184 http://dx.doi.org/10.1038/s41598-021-98367-0 Text en © The Author(s) 2021 https://creativecommons.org/licenses/by/4.0/Open Access This article is licensed under a Creative Commons Attribution 4.0 International License, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons licence, and indicate if changes were made. The images or other third party material in this article are included in the article's Creative Commons licence, unless indicated otherwise in a credit line to the material. If material is not included in the article's Creative Commons licence and your intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain permission directly from the copyright holder. To view a copy of this licence, visit http://creativecommons.org/licenses/by/4.0/ (https://creativecommons.org/licenses/by/4.0/) . |
spellingShingle | Article Sobczak-Piąstka, Justyna Kichaeva, Oksana Firsov, Pavlo Zolotov, Sergey Famulyak, Yuriy Management of the “building-base system” action, using a life cycle model |
title | Management of the “building-base system” action, using a life cycle model |
title_full | Management of the “building-base system” action, using a life cycle model |
title_fullStr | Management of the “building-base system” action, using a life cycle model |
title_full_unstemmed | Management of the “building-base system” action, using a life cycle model |
title_short | Management of the “building-base system” action, using a life cycle model |
title_sort | management of the “building-base system” action, using a life cycle model |
topic | Article |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8458470/ https://www.ncbi.nlm.nih.gov/pubmed/34552184 http://dx.doi.org/10.1038/s41598-021-98367-0 |
work_keys_str_mv | AT sobczakpiastkajustyna managementofthebuildingbasesystemactionusingalifecyclemodel AT kichaevaoksana managementofthebuildingbasesystemactionusingalifecyclemodel AT firsovpavlo managementofthebuildingbasesystemactionusingalifecyclemodel AT zolotovsergey managementofthebuildingbasesystemactionusingalifecyclemodel AT famulyakyuriy managementofthebuildingbasesystemactionusingalifecyclemodel |