Cargando…
Site Investigations of the Lacustrine Clay in Taihu Lake, China, Using Self-Boring Pressuremeter Test
Site investigations of the soils are considered very important for evaluation of the site conditions, as well as the design and construction for the project built in it. Taihu tunnel is thus far the longest tunnel constructed in the lake in China, with an entire length of over 10 km. However, due to...
Autores principales: | Wang, Bin, Liu, Kang, Wang, Yong, Jiang, Quan |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
MDPI
2021
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8472554/ https://www.ncbi.nlm.nih.gov/pubmed/34577233 http://dx.doi.org/10.3390/s21186026 |
Ejemplares similares
-
Occurrence and Distribution of Microcystins in Lake Taihu, China
por: Sakai, Hiroshi, et al.
Publicado: (2013) -
Characteristics of petroleum contaminants and their distribution in Lake Taihu, China
por: Guo, Jixiang, et al.
Publicado: (2012) -
Precipitation Complexity and its Spatial Difference in the Taihu Lake Basin, China
por: Hu, Jian, et al.
Publicado: (2019) -
Characterizing spatiotemporal variations of polycyclic aromatic hydrocarbons in Taihu Lake, China
por: Li, Aili, et al.
Publicado: (2022) -
Insight Into the Molecular Mechanisms for Microcystin Biodegradation in Lake Erie and Lake Taihu
por: Krausfeldt, Lauren E., et al.
Publicado: (2019)