Cargando…
A case study on TBM cutterhead temperature monitoring and mud cake formation discrimination method
The mud cake is easily formed during the tunnel boring machine (TBM) excavation in clay soils or rocks containing clay minerals. Mud cake will lead to soil disturbance of tunnel face, clogging cutterhead and even affect the construction efficiency and personnel safety. In this study, a discriminatio...
Autores principales: | Fu, Jie, Xia, Yimin, Lan, Hao, Wu, Dun, Lin, Laikuang |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Nature Publishing Group UK
2021
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8497619/ https://www.ncbi.nlm.nih.gov/pubmed/34620980 http://dx.doi.org/10.1038/s41598-021-99439-x |
Ejemplares similares
-
Numerical Failure Analysis and Fatigue Life Prediction of Shield Machine Cutterhead
por: Li, Jie, et al.
Publicado: (2021) -
Disturbance observer-based adaptive position control for a cutterhead anti-torque system
por: Zhang, Hangjun, et al.
Publicado: (2022) -
Utilization of metakaolin-based geopolymer as a mud-cake solidification agent to enhance the bonding strength of oil well cement–formation interface
por: Bu, Yuhuan, et al.
Publicado: (2020) -
Acute development of syringomyelia following TBM in a pediatric case
por: Wen, Ningyuan, et al.
Publicado: (2021) -
Study on correlation between TBM tailings gradation and granitic gneiss surrounding rock stability
por: Liu, Yuancheng, et al.
Publicado: (2023)