Cargando…
Human resource risk control through COVID-19 risk assessment in Indonesian manufacturing
The COVID-19 outbreak that began at the end of 2019 brought a crisis impact on the health sector and other sectors such as the economy, social and politics. Human resource problems that emerged as a result of the pandemic made every company strive to protect employee safety. The food and beverage se...
Autores principales: | , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Elsevier Ltd.
2022
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8545779/ https://www.ncbi.nlm.nih.gov/pubmed/34720455 http://dx.doi.org/10.1016/j.jlp.2021.104665 |
_version_ | 1784590066206638080 |
---|---|
author | Ambarwati, Rita Yuliastri, Diah Sulistiyowati, Wiwik |
author_facet | Ambarwati, Rita Yuliastri, Diah Sulistiyowati, Wiwik |
author_sort | Ambarwati, Rita |
collection | PubMed |
description | The COVID-19 outbreak that began at the end of 2019 brought a crisis impact on the health sector and other sectors such as the economy, social and politics. Human resource problems that emerged as a result of the pandemic made every company strive to protect employee safety. The food and beverage sector is one of the industries maintained to continue operating despite the large-scale social restrictions imposed in several regions, including an instant food company in East Java. This study aims to identify and determine human resource risk control to support employee productivity during the COVID-19 pandemic. This research used qualitative data based obtained through interviews, observation, and documentation. The method in this study used a combination of Failure Mode Effect Analysis (FMEA) and Bow Tie to identify, measure, and anticipate the risk of COVID-19 transmission in the company. The output result of the Failure Mode Effect Analysis (FMEA) method is the Risk Priority Number (RPN) score. The three activities with the highest RPN value were health services at the polyclinic, employee meal activities in the canteen, and activities inside and outside the factory. This analysis's results were continued by using the Bow Tie method to identify the causes, prevention, impact, and recovery of these risks. Bow Tie analysis results formed the basis for the preparation of Corrective Action and Preventive Action (CAPA). The risk control of human resources is focused on increasing employee productivity by reducing days lost due to labor shortages. In the end, the study results are expected to become recommendations in the evaluation of risk control and preventive measures for COVID-19 in manufacturing companies. |
format | Online Article Text |
id | pubmed-8545779 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2022 |
publisher | Elsevier Ltd. |
record_format | MEDLINE/PubMed |
spelling | pubmed-85457792021-10-26 Human resource risk control through COVID-19 risk assessment in Indonesian manufacturing Ambarwati, Rita Yuliastri, Diah Sulistiyowati, Wiwik J Loss Prev Process Ind Article The COVID-19 outbreak that began at the end of 2019 brought a crisis impact on the health sector and other sectors such as the economy, social and politics. Human resource problems that emerged as a result of the pandemic made every company strive to protect employee safety. The food and beverage sector is one of the industries maintained to continue operating despite the large-scale social restrictions imposed in several regions, including an instant food company in East Java. This study aims to identify and determine human resource risk control to support employee productivity during the COVID-19 pandemic. This research used qualitative data based obtained through interviews, observation, and documentation. The method in this study used a combination of Failure Mode Effect Analysis (FMEA) and Bow Tie to identify, measure, and anticipate the risk of COVID-19 transmission in the company. The output result of the Failure Mode Effect Analysis (FMEA) method is the Risk Priority Number (RPN) score. The three activities with the highest RPN value were health services at the polyclinic, employee meal activities in the canteen, and activities inside and outside the factory. This analysis's results were continued by using the Bow Tie method to identify the causes, prevention, impact, and recovery of these risks. Bow Tie analysis results formed the basis for the preparation of Corrective Action and Preventive Action (CAPA). The risk control of human resources is focused on increasing employee productivity by reducing days lost due to labor shortages. In the end, the study results are expected to become recommendations in the evaluation of risk control and preventive measures for COVID-19 in manufacturing companies. Elsevier Ltd. 2022-01 2021-10-25 /pmc/articles/PMC8545779/ /pubmed/34720455 http://dx.doi.org/10.1016/j.jlp.2021.104665 Text en © 2021 Elsevier Ltd. All rights reserved. Since January 2020 Elsevier has created a COVID-19 resource centre with free information in English and Mandarin on the novel coronavirus COVID-19. The COVID-19 resource centre is hosted on Elsevier Connect, the company's public news and information website. Elsevier hereby grants permission to make all its COVID-19-related research that is available on the COVID-19 resource centre - including this research content - immediately available in PubMed Central and other publicly funded repositories, such as the WHO COVID database with rights for unrestricted research re-use and analyses in any form or by any means with acknowledgement of the original source. These permissions are granted for free by Elsevier for as long as the COVID-19 resource centre remains active. |
spellingShingle | Article Ambarwati, Rita Yuliastri, Diah Sulistiyowati, Wiwik Human resource risk control through COVID-19 risk assessment in Indonesian manufacturing |
title | Human resource risk control through COVID-19 risk assessment in Indonesian manufacturing |
title_full | Human resource risk control through COVID-19 risk assessment in Indonesian manufacturing |
title_fullStr | Human resource risk control through COVID-19 risk assessment in Indonesian manufacturing |
title_full_unstemmed | Human resource risk control through COVID-19 risk assessment in Indonesian manufacturing |
title_short | Human resource risk control through COVID-19 risk assessment in Indonesian manufacturing |
title_sort | human resource risk control through covid-19 risk assessment in indonesian manufacturing |
topic | Article |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8545779/ https://www.ncbi.nlm.nih.gov/pubmed/34720455 http://dx.doi.org/10.1016/j.jlp.2021.104665 |
work_keys_str_mv | AT ambarwatirita humanresourceriskcontrolthroughcovid19riskassessmentinindonesianmanufacturing AT yuliastridiah humanresourceriskcontrolthroughcovid19riskassessmentinindonesianmanufacturing AT sulistiyowatiwiwik humanresourceriskcontrolthroughcovid19riskassessmentinindonesianmanufacturing |