Cargando…

Modular composite building in urgent emergency engineering projects: A case study of accelerated design and construction of Wuhan Thunder God Mountain/Leishenshan hospital to COVID-19 pandemic

Wuhan Leishenshan/Leishenshan (“Leishenshan” for short) hospital is a makeshift emergency hospital for treating patients diagnosed with the novel coronavirus-infected pneumonia (NCIP). Engineering construction uses modular composite building finished products to the greatest extent, which reduces th...

Descripción completa

Detalles Bibliográficos
Autores principales: Chen, Ling-Kun, Yuan, Rui-Peng, Ji, Xing-Jun, Lu, Xing-Yu, Xiao, Jiang, Tao, Jun-Bo, Kang, Xin, Li, Xin, He, Zhen-Hua, Quan, Shu, Jiang, Li-Zhong
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Elsevier B.V. 2021
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8589358/
https://www.ncbi.nlm.nih.gov/pubmed/34803228
http://dx.doi.org/10.1016/j.autcon.2021.103555
_version_ 1784598694756089856
author Chen, Ling-Kun
Yuan, Rui-Peng
Ji, Xing-Jun
Lu, Xing-Yu
Xiao, Jiang
Tao, Jun-Bo
Kang, Xin
Li, Xin
He, Zhen-Hua
Quan, Shu
Jiang, Li-Zhong
author_facet Chen, Ling-Kun
Yuan, Rui-Peng
Ji, Xing-Jun
Lu, Xing-Yu
Xiao, Jiang
Tao, Jun-Bo
Kang, Xin
Li, Xin
He, Zhen-Hua
Quan, Shu
Jiang, Li-Zhong
author_sort Chen, Ling-Kun
collection PubMed
description Wuhan Leishenshan/Leishenshan (“Leishenshan” for short) hospital is a makeshift emergency hospital for treating patients diagnosed with the novel coronavirus-infected pneumonia (NCIP). Engineering construction uses modular composite building finished products to the greatest extent, which reduces the workload of field operations and saves a lot of time. The building information model (BIM) technology assists in design and construction work to meet rapid construction requirements. Besides, based on the unmanned aerial vehicles (UAVs) data analysis and application platform, digitization and intelligence in engineering construction are improved. Simultaneously, on-site construction and overall hoisting were carried out to achieve maximum efficiency. This article aims to take the construction of Leishenshan Hospital as an example to illustrate how to adopt BIM technology and other high-tech technology such as big data, artificial intelligence, drones, and 5G for the fast construction of the fabricated steel structure systems in emergency engineering projects.
format Online
Article
Text
id pubmed-8589358
institution National Center for Biotechnology Information
language English
publishDate 2021
publisher Elsevier B.V.
record_format MEDLINE/PubMed
spelling pubmed-85893582021-11-15 Modular composite building in urgent emergency engineering projects: A case study of accelerated design and construction of Wuhan Thunder God Mountain/Leishenshan hospital to COVID-19 pandemic Chen, Ling-Kun Yuan, Rui-Peng Ji, Xing-Jun Lu, Xing-Yu Xiao, Jiang Tao, Jun-Bo Kang, Xin Li, Xin He, Zhen-Hua Quan, Shu Jiang, Li-Zhong Autom Constr Article Wuhan Leishenshan/Leishenshan (“Leishenshan” for short) hospital is a makeshift emergency hospital for treating patients diagnosed with the novel coronavirus-infected pneumonia (NCIP). Engineering construction uses modular composite building finished products to the greatest extent, which reduces the workload of field operations and saves a lot of time. The building information model (BIM) technology assists in design and construction work to meet rapid construction requirements. Besides, based on the unmanned aerial vehicles (UAVs) data analysis and application platform, digitization and intelligence in engineering construction are improved. Simultaneously, on-site construction and overall hoisting were carried out to achieve maximum efficiency. This article aims to take the construction of Leishenshan Hospital as an example to illustrate how to adopt BIM technology and other high-tech technology such as big data, artificial intelligence, drones, and 5G for the fast construction of the fabricated steel structure systems in emergency engineering projects. Elsevier B.V. 2021-04 2021-01-22 /pmc/articles/PMC8589358/ /pubmed/34803228 http://dx.doi.org/10.1016/j.autcon.2021.103555 Text en © 2021 Elsevier B.V. All rights reserved. Since January 2020 Elsevier has created a COVID-19 resource centre with free information in English and Mandarin on the novel coronavirus COVID-19. The COVID-19 resource centre is hosted on Elsevier Connect, the company's public news and information website. Elsevier hereby grants permission to make all its COVID-19-related research that is available on the COVID-19 resource centre - including this research content - immediately available in PubMed Central and other publicly funded repositories, such as the WHO COVID database with rights for unrestricted research re-use and analyses in any form or by any means with acknowledgement of the original source. These permissions are granted for free by Elsevier for as long as the COVID-19 resource centre remains active.
spellingShingle Article
Chen, Ling-Kun
Yuan, Rui-Peng
Ji, Xing-Jun
Lu, Xing-Yu
Xiao, Jiang
Tao, Jun-Bo
Kang, Xin
Li, Xin
He, Zhen-Hua
Quan, Shu
Jiang, Li-Zhong
Modular composite building in urgent emergency engineering projects: A case study of accelerated design and construction of Wuhan Thunder God Mountain/Leishenshan hospital to COVID-19 pandemic
title Modular composite building in urgent emergency engineering projects: A case study of accelerated design and construction of Wuhan Thunder God Mountain/Leishenshan hospital to COVID-19 pandemic
title_full Modular composite building in urgent emergency engineering projects: A case study of accelerated design and construction of Wuhan Thunder God Mountain/Leishenshan hospital to COVID-19 pandemic
title_fullStr Modular composite building in urgent emergency engineering projects: A case study of accelerated design and construction of Wuhan Thunder God Mountain/Leishenshan hospital to COVID-19 pandemic
title_full_unstemmed Modular composite building in urgent emergency engineering projects: A case study of accelerated design and construction of Wuhan Thunder God Mountain/Leishenshan hospital to COVID-19 pandemic
title_short Modular composite building in urgent emergency engineering projects: A case study of accelerated design and construction of Wuhan Thunder God Mountain/Leishenshan hospital to COVID-19 pandemic
title_sort modular composite building in urgent emergency engineering projects: a case study of accelerated design and construction of wuhan thunder god mountain/leishenshan hospital to covid-19 pandemic
topic Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8589358/
https://www.ncbi.nlm.nih.gov/pubmed/34803228
http://dx.doi.org/10.1016/j.autcon.2021.103555
work_keys_str_mv AT chenlingkun modularcompositebuildinginurgentemergencyengineeringprojectsacasestudyofaccelerateddesignandconstructionofwuhanthundergodmountainleishenshanhospitaltocovid19pandemic
AT yuanruipeng modularcompositebuildinginurgentemergencyengineeringprojectsacasestudyofaccelerateddesignandconstructionofwuhanthundergodmountainleishenshanhospitaltocovid19pandemic
AT jixingjun modularcompositebuildinginurgentemergencyengineeringprojectsacasestudyofaccelerateddesignandconstructionofwuhanthundergodmountainleishenshanhospitaltocovid19pandemic
AT luxingyu modularcompositebuildinginurgentemergencyengineeringprojectsacasestudyofaccelerateddesignandconstructionofwuhanthundergodmountainleishenshanhospitaltocovid19pandemic
AT xiaojiang modularcompositebuildinginurgentemergencyengineeringprojectsacasestudyofaccelerateddesignandconstructionofwuhanthundergodmountainleishenshanhospitaltocovid19pandemic
AT taojunbo modularcompositebuildinginurgentemergencyengineeringprojectsacasestudyofaccelerateddesignandconstructionofwuhanthundergodmountainleishenshanhospitaltocovid19pandemic
AT kangxin modularcompositebuildinginurgentemergencyengineeringprojectsacasestudyofaccelerateddesignandconstructionofwuhanthundergodmountainleishenshanhospitaltocovid19pandemic
AT lixin modularcompositebuildinginurgentemergencyengineeringprojectsacasestudyofaccelerateddesignandconstructionofwuhanthundergodmountainleishenshanhospitaltocovid19pandemic
AT hezhenhua modularcompositebuildinginurgentemergencyengineeringprojectsacasestudyofaccelerateddesignandconstructionofwuhanthundergodmountainleishenshanhospitaltocovid19pandemic
AT quanshu modularcompositebuildinginurgentemergencyengineeringprojectsacasestudyofaccelerateddesignandconstructionofwuhanthundergodmountainleishenshanhospitaltocovid19pandemic
AT jianglizhong modularcompositebuildinginurgentemergencyengineeringprojectsacasestudyofaccelerateddesignandconstructionofwuhanthundergodmountainleishenshanhospitaltocovid19pandemic