Cargando…

Prediction of Material Failure Time for a Bucket Wheel Excavator Boom Using Computer Simulation

Breakdown of stackers and excavators in opencast mines is possible because of operating, manufacturing and structural causes, and it produces high financial losses. These can be prevented by using various measures, including analyses and strength tests, with computerized modeling and simulation usin...

Descripción completa

Detalles Bibliográficos
Autores principales: Andraș, Andrei, Radu, Sorin Mihai, Brînaș, Ildiko, Popescu, Florin Dumitru, Budilică, Daniela Ioana, Korozsi, Eva Biro
Formato: Online Artículo Texto
Lenguaje:English
Publicado: MDPI 2021
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8708533/
https://www.ncbi.nlm.nih.gov/pubmed/34947492
http://dx.doi.org/10.3390/ma14247897
_version_ 1784622708995129344
author Andraș, Andrei
Radu, Sorin Mihai
Brînaș, Ildiko
Popescu, Florin Dumitru
Budilică, Daniela Ioana
Korozsi, Eva Biro
author_facet Andraș, Andrei
Radu, Sorin Mihai
Brînaș, Ildiko
Popescu, Florin Dumitru
Budilică, Daniela Ioana
Korozsi, Eva Biro
author_sort Andraș, Andrei
collection PubMed
description Breakdown of stackers and excavators in opencast mines is possible because of operating, manufacturing and structural causes, and it produces high financial losses. These can be prevented by using various measures, including analyses and strength tests, with computerized modeling and simulation using FEA or other techniques being implemented in the recent years. In this paper a fatigue study is conducted on the boom of a BWE. Based on a computer model of the boom previously developed in SOLIDWORKS by our author team, first the modal analysis is conducted for three positions of the boom by studying the frequency response during the excavation process. This is followed by the time response determination corresponding to the maximum displacement frequency, in order to assess the stress during the excavation process, which causes the material fatigue in the boom structure. It was found that the maximum displacements appear when the BWE boom operates in a horizontal position. The aim was to estimate the period of time to failure in order to prevent unwanted accidents, and to develop a method that is applicable to any surface mining or industrial machine with similar structure.
format Online
Article
Text
id pubmed-8708533
institution National Center for Biotechnology Information
language English
publishDate 2021
publisher MDPI
record_format MEDLINE/PubMed
spelling pubmed-87085332021-12-25 Prediction of Material Failure Time for a Bucket Wheel Excavator Boom Using Computer Simulation Andraș, Andrei Radu, Sorin Mihai Brînaș, Ildiko Popescu, Florin Dumitru Budilică, Daniela Ioana Korozsi, Eva Biro Materials (Basel) Article Breakdown of stackers and excavators in opencast mines is possible because of operating, manufacturing and structural causes, and it produces high financial losses. These can be prevented by using various measures, including analyses and strength tests, with computerized modeling and simulation using FEA or other techniques being implemented in the recent years. In this paper a fatigue study is conducted on the boom of a BWE. Based on a computer model of the boom previously developed in SOLIDWORKS by our author team, first the modal analysis is conducted for three positions of the boom by studying the frequency response during the excavation process. This is followed by the time response determination corresponding to the maximum displacement frequency, in order to assess the stress during the excavation process, which causes the material fatigue in the boom structure. It was found that the maximum displacements appear when the BWE boom operates in a horizontal position. The aim was to estimate the period of time to failure in order to prevent unwanted accidents, and to develop a method that is applicable to any surface mining or industrial machine with similar structure. MDPI 2021-12-20 /pmc/articles/PMC8708533/ /pubmed/34947492 http://dx.doi.org/10.3390/ma14247897 Text en © 2021 by the authors. https://creativecommons.org/licenses/by/4.0/Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/).
spellingShingle Article
Andraș, Andrei
Radu, Sorin Mihai
Brînaș, Ildiko
Popescu, Florin Dumitru
Budilică, Daniela Ioana
Korozsi, Eva Biro
Prediction of Material Failure Time for a Bucket Wheel Excavator Boom Using Computer Simulation
title Prediction of Material Failure Time for a Bucket Wheel Excavator Boom Using Computer Simulation
title_full Prediction of Material Failure Time for a Bucket Wheel Excavator Boom Using Computer Simulation
title_fullStr Prediction of Material Failure Time for a Bucket Wheel Excavator Boom Using Computer Simulation
title_full_unstemmed Prediction of Material Failure Time for a Bucket Wheel Excavator Boom Using Computer Simulation
title_short Prediction of Material Failure Time for a Bucket Wheel Excavator Boom Using Computer Simulation
title_sort prediction of material failure time for a bucket wheel excavator boom using computer simulation
topic Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8708533/
https://www.ncbi.nlm.nih.gov/pubmed/34947492
http://dx.doi.org/10.3390/ma14247897
work_keys_str_mv AT andrasandrei predictionofmaterialfailuretimeforabucketwheelexcavatorboomusingcomputersimulation
AT radusorinmihai predictionofmaterialfailuretimeforabucketwheelexcavatorboomusingcomputersimulation
AT brinasildiko predictionofmaterialfailuretimeforabucketwheelexcavatorboomusingcomputersimulation
AT popescuflorindumitru predictionofmaterialfailuretimeforabucketwheelexcavatorboomusingcomputersimulation
AT budilicadanielaioana predictionofmaterialfailuretimeforabucketwheelexcavatorboomusingcomputersimulation
AT korozsievabiro predictionofmaterialfailuretimeforabucketwheelexcavatorboomusingcomputersimulation