Cargando…

Management des risques biologiques et infectieux au Laboratoire de bactériologie médicale du CHU Ibn Sina à Rabat

Introduction: The laboratory of bacteriology is a place with a potential risk and permanent exhibition to biological and infectious hazards caused by the handling of potentially contaminated biological products. Aims: to evaluate biological and infectious, analyze the circumstances of incidents and...

Descripción completa

Detalles Bibliográficos
Autores principales: Jnah, Abdelhak, Hamamouchi, Jamila, El Hamzaoui, Sakina, Seffar, Myriam, yagoubi, Maâmar, Zouhdi, Mimoun
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Tunisian Society of Medical Sciences 2021
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8734475/
https://www.ncbi.nlm.nih.gov/pubmed/35244927
Descripción
Sumario:Introduction: The laboratory of bacteriology is a place with a potential risk and permanent exhibition to biological and infectious hazards caused by the handling of potentially contaminated biological products. Aims: to evaluate biological and infectious, analyze the circumstances of incidents and accidents and propose a professional risk assessment process (EvRP) to the laboratory with an action plan that can be carried out immediately. Methods: A descriptive epidemiological cross-sectional study carried out in the medical bacteriology laboratory of the Ibn Sina University Hospital in Rabat over a period of twelve months. It is based on self-questionnaires, observations and interviews with staff. Results: The evaluation showed that the staff of this service is highly exposed. AES constitutes the most important biological risk with 28.6% of the staff but without any declaration. The absence of a referent in health risk management to communicate knowledge of biological and infectious risk to staff. Only 14.3% of staff would be up to date for the vaccination. The absence of a post-exposure biological risk action plan and the design of the tuberculosis laboratory does not comply with risk level 3. Conclusion: an action plan and prevention strategies must be implemented and their application is based on numerous national and international regulatory texts.