Cargando…

Comprehensive Evaluation of BIM Calculation Quantity in Domestic Construction Engineering Based on Fuzzy Comprehensive Evaluation

Nowadays, with the leap-forward development of computer technology and the transformation of information technology management concepts, China's construction industry is quietly entering the era of refined management. Accurate estimation and cost control have become among the key considerations...

Descripción completa

Detalles Bibliográficos
Autores principales: Deng, Yi, Rao, Ziyuan, Cai, Ling
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Hindawi 2021
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8741375/
https://www.ncbi.nlm.nih.gov/pubmed/35003240
http://dx.doi.org/10.1155/2021/3292376
_version_ 1784629475265216512
author Deng, Yi
Rao, Ziyuan
Cai, Ling
author_facet Deng, Yi
Rao, Ziyuan
Cai, Ling
author_sort Deng, Yi
collection PubMed
description Nowadays, with the leap-forward development of computer technology and the transformation of information technology management concepts, China's construction industry is quietly entering the era of refined management. Accurate estimation and cost control have become among the key considerations of the construction industry. For the calculation of engineering quantity, there are already many software devices that can be used for the calculation of engineering structure quantity, which means that the incorrect operation of personnel has been reduced to some extent, improving the work efficiency and measurement accuracy. The purpose of this paper is to solve the problems of computational missing, computational errors, inefficiency, data loss, and repetitive system in traditional computing based on the advantages of BIM computing system, which provide a reliable basis for cost forecasting and control. At the same time, using BMI calculation system to solve the problem of steel reinforcement in construction engineering, as well as the use of personnel, the existing calculation software still needs a lot of time and energy. We proposed a comprehensive evaluation study of reinforcement calculation in domestic construction engineering BIM calculation system based on a fuzzy comprehensive evaluation. This paper first summarizes the BIM calculation system of construction engineering, uses fuzzy comprehensive evaluation system as an important evaluation index system in domestic construction engineering BIM calculation system, through the judgment of various factors affecting the actual effect of the calculation system, and uses the fuzzy evaluation system combined with a case to demonstrate the superiority of the proposed research. Therefore, through the above research and experiments, it is concluded that the research method of this paper solves many problems in the process of engineering structure reinforcement calculation and provides a good reference method for the establishment of comprehensive evaluation system of reinforcement calculation, as well as providing an effective validation for the widespread use of BIM technology in the construction industry. Finally, it is also beneficial for users to comprehensively evaluate the BIM calculation system of the construction industry and provide a basic reference condition for different industries to use and choose BIM calculation systems.
format Online
Article
Text
id pubmed-8741375
institution National Center for Biotechnology Information
language English
publishDate 2021
publisher Hindawi
record_format MEDLINE/PubMed
spelling pubmed-87413752022-01-08 Comprehensive Evaluation of BIM Calculation Quantity in Domestic Construction Engineering Based on Fuzzy Comprehensive Evaluation Deng, Yi Rao, Ziyuan Cai, Ling Comput Intell Neurosci Research Article Nowadays, with the leap-forward development of computer technology and the transformation of information technology management concepts, China's construction industry is quietly entering the era of refined management. Accurate estimation and cost control have become among the key considerations of the construction industry. For the calculation of engineering quantity, there are already many software devices that can be used for the calculation of engineering structure quantity, which means that the incorrect operation of personnel has been reduced to some extent, improving the work efficiency and measurement accuracy. The purpose of this paper is to solve the problems of computational missing, computational errors, inefficiency, data loss, and repetitive system in traditional computing based on the advantages of BIM computing system, which provide a reliable basis for cost forecasting and control. At the same time, using BMI calculation system to solve the problem of steel reinforcement in construction engineering, as well as the use of personnel, the existing calculation software still needs a lot of time and energy. We proposed a comprehensive evaluation study of reinforcement calculation in domestic construction engineering BIM calculation system based on a fuzzy comprehensive evaluation. This paper first summarizes the BIM calculation system of construction engineering, uses fuzzy comprehensive evaluation system as an important evaluation index system in domestic construction engineering BIM calculation system, through the judgment of various factors affecting the actual effect of the calculation system, and uses the fuzzy evaluation system combined with a case to demonstrate the superiority of the proposed research. Therefore, through the above research and experiments, it is concluded that the research method of this paper solves many problems in the process of engineering structure reinforcement calculation and provides a good reference method for the establishment of comprehensive evaluation system of reinforcement calculation, as well as providing an effective validation for the widespread use of BIM technology in the construction industry. Finally, it is also beneficial for users to comprehensively evaluate the BIM calculation system of the construction industry and provide a basic reference condition for different industries to use and choose BIM calculation systems. Hindawi 2021-12-31 /pmc/articles/PMC8741375/ /pubmed/35003240 http://dx.doi.org/10.1155/2021/3292376 Text en Copyright © 2021 Yi Deng et al. https://creativecommons.org/licenses/by/4.0/This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
spellingShingle Research Article
Deng, Yi
Rao, Ziyuan
Cai, Ling
Comprehensive Evaluation of BIM Calculation Quantity in Domestic Construction Engineering Based on Fuzzy Comprehensive Evaluation
title Comprehensive Evaluation of BIM Calculation Quantity in Domestic Construction Engineering Based on Fuzzy Comprehensive Evaluation
title_full Comprehensive Evaluation of BIM Calculation Quantity in Domestic Construction Engineering Based on Fuzzy Comprehensive Evaluation
title_fullStr Comprehensive Evaluation of BIM Calculation Quantity in Domestic Construction Engineering Based on Fuzzy Comprehensive Evaluation
title_full_unstemmed Comprehensive Evaluation of BIM Calculation Quantity in Domestic Construction Engineering Based on Fuzzy Comprehensive Evaluation
title_short Comprehensive Evaluation of BIM Calculation Quantity in Domestic Construction Engineering Based on Fuzzy Comprehensive Evaluation
title_sort comprehensive evaluation of bim calculation quantity in domestic construction engineering based on fuzzy comprehensive evaluation
topic Research Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8741375/
https://www.ncbi.nlm.nih.gov/pubmed/35003240
http://dx.doi.org/10.1155/2021/3292376
work_keys_str_mv AT dengyi comprehensiveevaluationofbimcalculationquantityindomesticconstructionengineeringbasedonfuzzycomprehensiveevaluation
AT raoziyuan comprehensiveevaluationofbimcalculationquantityindomesticconstructionengineeringbasedonfuzzycomprehensiveevaluation
AT cailing comprehensiveevaluationofbimcalculationquantityindomesticconstructionengineeringbasedonfuzzycomprehensiveevaluation