Cargando…
Basic clinical equipment for physical health assessment in mid Essex inpatient units
AIMS: It is trust policy that the Basic Clinical Equipment for Physical Health Assessment should be available on each unit. The standard for this audit is therefore 100% completion. BACKGROUND: This was a cross-sectional study of six mental health units across Mid Essex. We audited equipment and con...
Autor principal: | Abdelkhalek, Hesham |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Cambridge University Press
2021
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8771358/ http://dx.doi.org/10.1192/bjo.2021.806 |
Ejemplares similares
-
Audit cycle - VTE risk assessment in inpatient wards in mid Essex
por: Abdelkhalek, Hesham
Publicado: (2021) -
Response to Perinatal Psychosis in West Essex During COVID-19 Pandemic
por: Abdelkhalek, Hesham, et al.
Publicado: (2022) -
Reviewing suitability of Essex Partnership University Foundation NHS Trust out of area locked rehab placements
por: Ali, Shereen, et al.
Publicado: (2021) -
Audit of physical health monitoring on admission to Mill Lodge (CAMHS Inpatient Unit, York)
por: Steiu, Andreea, et al.
Publicado: (2021) -
Audit on venous thromboembolism risk assessment in mental health inpatient wards
por: Malhotra, Rahul
Publicado: (2021)