Causes of delays in construction projects in the Province of Aceh, Indonesia

Implementations of construction projects in Indonesia, especially in Aceh Province, are often delayed. Time, quality, and cost are three important components of planning a construction project. The benchmark for a successful construction project is the project completion time being in accordance wit...

Descripción completa

Detalles Bibliográficos
Autores principales: Rauzana, Anita, Dharma, Wira
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Public Library of Science 2022
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8797244/
https://www.ncbi.nlm.nih.gov/pubmed/35089971
http://dx.doi.org/10.1371/journal.pone.0263337
_version_ 1784641504615071744
author Rauzana, Anita
Dharma, Wira
author_facet Rauzana, Anita
Dharma, Wira
author_sort Rauzana, Anita
collection PubMed
description Implementations of construction projects in Indonesia, especially in Aceh Province, are often delayed. Time, quality, and cost are three important components of planning a construction project. The benchmark for a successful construction project is the project completion time being in accordance with the time period specified in the contract. In project implementation, there is often a risk of delays in completing construction projects that can cause losses and fines; therefore, it is necessary to know the risk factors potentially causing project delays. The purpose of this study was to identify the risk factors causing delays greatly affecting construction projects in Aceh Province. The data used in this study were questionnaire data distributed to 68 respondents. The data processing methods included validity tests, reliability tests, and the construction of descriptive statistics. Ultimately, 60 delay factors were obtained; of these, 30 risk indicators were included in the very influential category with a mode value of (= 5), 29 delay risk indicators were in the high influence category with a mode value of (= 4), and one indicator was included in the category of medium influence (= 3).
format Online
Article
Text
id pubmed-8797244
institution National Center for Biotechnology Information
language English
publishDate 2022
publisher Public Library of Science
record_format MEDLINE/PubMed
spelling pubmed-87972442022-01-29 Causes of delays in construction projects in the Province of Aceh, Indonesia Rauzana, Anita Dharma, Wira PLoS One Research Article Implementations of construction projects in Indonesia, especially in Aceh Province, are often delayed. Time, quality, and cost are three important components of planning a construction project. The benchmark for a successful construction project is the project completion time being in accordance with the time period specified in the contract. In project implementation, there is often a risk of delays in completing construction projects that can cause losses and fines; therefore, it is necessary to know the risk factors potentially causing project delays. The purpose of this study was to identify the risk factors causing delays greatly affecting construction projects in Aceh Province. The data used in this study were questionnaire data distributed to 68 respondents. The data processing methods included validity tests, reliability tests, and the construction of descriptive statistics. Ultimately, 60 delay factors were obtained; of these, 30 risk indicators were included in the very influential category with a mode value of (= 5), 29 delay risk indicators were in the high influence category with a mode value of (= 4), and one indicator was included in the category of medium influence (= 3). Public Library of Science 2022-01-28 /pmc/articles/PMC8797244/ /pubmed/35089971 http://dx.doi.org/10.1371/journal.pone.0263337 Text en © 2022 Rauzana, Dharma https://creativecommons.org/licenses/by/4.0/This is an open access article distributed under the terms of the Creative Commons Attribution License (https://creativecommons.org/licenses/by/4.0/) , which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.
spellingShingle Research Article
Rauzana, Anita
Dharma, Wira
Causes of delays in construction projects in the Province of Aceh, Indonesia
title Causes of delays in construction projects in the Province of Aceh, Indonesia
title_full Causes of delays in construction projects in the Province of Aceh, Indonesia
title_fullStr Causes of delays in construction projects in the Province of Aceh, Indonesia
title_full_unstemmed Causes of delays in construction projects in the Province of Aceh, Indonesia
title_short Causes of delays in construction projects in the Province of Aceh, Indonesia
title_sort causes of delays in construction projects in the province of aceh, indonesia
topic Research Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8797244/
https://www.ncbi.nlm.nih.gov/pubmed/35089971
http://dx.doi.org/10.1371/journal.pone.0263337
work_keys_str_mv AT rauzanaanita causesofdelaysinconstructionprojectsintheprovinceofacehindonesia
AT dharmawira causesofdelaysinconstructionprojectsintheprovinceofacehindonesia