Cargando…
Causes of delays in construction projects in the Province of Aceh, Indonesia
Implementations of construction projects in Indonesia, especially in Aceh Province, are often delayed. Time, quality, and cost are three important components of planning a construction project. The benchmark for a successful construction project is the project completion time being in accordance wit...
Autores principales: | , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Public Library of Science
2022
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8797244/ https://www.ncbi.nlm.nih.gov/pubmed/35089971 http://dx.doi.org/10.1371/journal.pone.0263337 |
_version_ | 1784641504615071744 |
---|---|
author | Rauzana, Anita Dharma, Wira |
author_facet | Rauzana, Anita Dharma, Wira |
author_sort | Rauzana, Anita |
collection | PubMed |
description | Implementations of construction projects in Indonesia, especially in Aceh Province, are often delayed. Time, quality, and cost are three important components of planning a construction project. The benchmark for a successful construction project is the project completion time being in accordance with the time period specified in the contract. In project implementation, there is often a risk of delays in completing construction projects that can cause losses and fines; therefore, it is necessary to know the risk factors potentially causing project delays. The purpose of this study was to identify the risk factors causing delays greatly affecting construction projects in Aceh Province. The data used in this study were questionnaire data distributed to 68 respondents. The data processing methods included validity tests, reliability tests, and the construction of descriptive statistics. Ultimately, 60 delay factors were obtained; of these, 30 risk indicators were included in the very influential category with a mode value of (= 5), 29 delay risk indicators were in the high influence category with a mode value of (= 4), and one indicator was included in the category of medium influence (= 3). |
format | Online Article Text |
id | pubmed-8797244 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2022 |
publisher | Public Library of Science |
record_format | MEDLINE/PubMed |
spelling | pubmed-87972442022-01-29 Causes of delays in construction projects in the Province of Aceh, Indonesia Rauzana, Anita Dharma, Wira PLoS One Research Article Implementations of construction projects in Indonesia, especially in Aceh Province, are often delayed. Time, quality, and cost are three important components of planning a construction project. The benchmark for a successful construction project is the project completion time being in accordance with the time period specified in the contract. In project implementation, there is often a risk of delays in completing construction projects that can cause losses and fines; therefore, it is necessary to know the risk factors potentially causing project delays. The purpose of this study was to identify the risk factors causing delays greatly affecting construction projects in Aceh Province. The data used in this study were questionnaire data distributed to 68 respondents. The data processing methods included validity tests, reliability tests, and the construction of descriptive statistics. Ultimately, 60 delay factors were obtained; of these, 30 risk indicators were included in the very influential category with a mode value of (= 5), 29 delay risk indicators were in the high influence category with a mode value of (= 4), and one indicator was included in the category of medium influence (= 3). Public Library of Science 2022-01-28 /pmc/articles/PMC8797244/ /pubmed/35089971 http://dx.doi.org/10.1371/journal.pone.0263337 Text en © 2022 Rauzana, Dharma https://creativecommons.org/licenses/by/4.0/This is an open access article distributed under the terms of the Creative Commons Attribution License (https://creativecommons.org/licenses/by/4.0/) , which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited. |
spellingShingle | Research Article Rauzana, Anita Dharma, Wira Causes of delays in construction projects in the Province of Aceh, Indonesia |
title | Causes of delays in construction projects in the Province of Aceh, Indonesia |
title_full | Causes of delays in construction projects in the Province of Aceh, Indonesia |
title_fullStr | Causes of delays in construction projects in the Province of Aceh, Indonesia |
title_full_unstemmed | Causes of delays in construction projects in the Province of Aceh, Indonesia |
title_short | Causes of delays in construction projects in the Province of Aceh, Indonesia |
title_sort | causes of delays in construction projects in the province of aceh, indonesia |
topic | Research Article |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8797244/ https://www.ncbi.nlm.nih.gov/pubmed/35089971 http://dx.doi.org/10.1371/journal.pone.0263337 |
work_keys_str_mv | AT rauzanaanita causesofdelaysinconstructionprojectsintheprovinceofacehindonesia AT dharmawira causesofdelaysinconstructionprojectsintheprovinceofacehindonesia |