A Risk-Based Approach in Rehabilitation of Water Distribution Networks
A risk-based approach to support water utilities in terms of defining pipe rehabilitation priorities is presented. In a risk analysis in the risk management process, the probability that a given event will happen and the consequences if it does happen have to be estimated and combined. In the quanti...
Autores principales: | , , , , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
MDPI
2022
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8835183/ https://www.ncbi.nlm.nih.gov/pubmed/35162616 http://dx.doi.org/10.3390/ijerph19031594 |
_version_ | 1784649366691119104 |
---|---|
author | Raspati, Gema Sakti Bruaset, Stian Bosco, Camillo Mushom, Lars Johannessen, Birgitte Ugarelli, Rita |
author_facet | Raspati, Gema Sakti Bruaset, Stian Bosco, Camillo Mushom, Lars Johannessen, Birgitte Ugarelli, Rita |
author_sort | Raspati, Gema Sakti |
collection | PubMed |
description | A risk-based approach to support water utilities in terms of defining pipe rehabilitation priorities is presented. In a risk analysis in the risk management process, the probability that a given event will happen and the consequences if it does happen have to be estimated and combined. In the quantitative risk analysis, numerical values are assigned to both consequence and probability. In this study, the risk event addressed was the inability to supply water due to pipe breaks. Therefore, on the probability side, the probability of pipes breaking was assessed, and on the consequence side, the reduced ability to satisfy the water demand (hydraulic reliability) due to pipe breakage was computed. Random Forest analysis was implemented for the probability side, while the Asset Vulnerability Analysis Toolkit was used to analyse the network’s hydraulic reliability. Pipes could then be ranked based on the corresponding risk magnitude, thereby feeding a risk evaluation step; at this step, decisions are made concerning which risks need treatment, and also concerning the treatment priorities, i.e., rehabilitation priorities. The water distribution network of Trondheim, Norway, was used as a case study area, and this study illustrates how the developed method aids the development of a risk-based rehabilitation plan. |
format | Online Article Text |
id | pubmed-8835183 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2022 |
publisher | MDPI |
record_format | MEDLINE/PubMed |
spelling | pubmed-88351832022-02-12 A Risk-Based Approach in Rehabilitation of Water Distribution Networks Raspati, Gema Sakti Bruaset, Stian Bosco, Camillo Mushom, Lars Johannessen, Birgitte Ugarelli, Rita Int J Environ Res Public Health Article A risk-based approach to support water utilities in terms of defining pipe rehabilitation priorities is presented. In a risk analysis in the risk management process, the probability that a given event will happen and the consequences if it does happen have to be estimated and combined. In the quantitative risk analysis, numerical values are assigned to both consequence and probability. In this study, the risk event addressed was the inability to supply water due to pipe breaks. Therefore, on the probability side, the probability of pipes breaking was assessed, and on the consequence side, the reduced ability to satisfy the water demand (hydraulic reliability) due to pipe breakage was computed. Random Forest analysis was implemented for the probability side, while the Asset Vulnerability Analysis Toolkit was used to analyse the network’s hydraulic reliability. Pipes could then be ranked based on the corresponding risk magnitude, thereby feeding a risk evaluation step; at this step, decisions are made concerning which risks need treatment, and also concerning the treatment priorities, i.e., rehabilitation priorities. The water distribution network of Trondheim, Norway, was used as a case study area, and this study illustrates how the developed method aids the development of a risk-based rehabilitation plan. MDPI 2022-01-30 /pmc/articles/PMC8835183/ /pubmed/35162616 http://dx.doi.org/10.3390/ijerph19031594 Text en © 2022 by the authors. https://creativecommons.org/licenses/by/4.0/Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). |
spellingShingle | Article Raspati, Gema Sakti Bruaset, Stian Bosco, Camillo Mushom, Lars Johannessen, Birgitte Ugarelli, Rita A Risk-Based Approach in Rehabilitation of Water Distribution Networks |
title | A Risk-Based Approach in Rehabilitation of Water Distribution Networks |
title_full | A Risk-Based Approach in Rehabilitation of Water Distribution Networks |
title_fullStr | A Risk-Based Approach in Rehabilitation of Water Distribution Networks |
title_full_unstemmed | A Risk-Based Approach in Rehabilitation of Water Distribution Networks |
title_short | A Risk-Based Approach in Rehabilitation of Water Distribution Networks |
title_sort | risk-based approach in rehabilitation of water distribution networks |
topic | Article |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8835183/ https://www.ncbi.nlm.nih.gov/pubmed/35162616 http://dx.doi.org/10.3390/ijerph19031594 |
work_keys_str_mv | AT raspatigemasakti ariskbasedapproachinrehabilitationofwaterdistributionnetworks AT bruasetstian ariskbasedapproachinrehabilitationofwaterdistributionnetworks AT boscocamillo ariskbasedapproachinrehabilitationofwaterdistributionnetworks AT mushomlars ariskbasedapproachinrehabilitationofwaterdistributionnetworks AT johannessenbirgitte ariskbasedapproachinrehabilitationofwaterdistributionnetworks AT ugarellirita ariskbasedapproachinrehabilitationofwaterdistributionnetworks AT raspatigemasakti riskbasedapproachinrehabilitationofwaterdistributionnetworks AT bruasetstian riskbasedapproachinrehabilitationofwaterdistributionnetworks AT boscocamillo riskbasedapproachinrehabilitationofwaterdistributionnetworks AT mushomlars riskbasedapproachinrehabilitationofwaterdistributionnetworks AT johannessenbirgitte riskbasedapproachinrehabilitationofwaterdistributionnetworks AT ugarellirita riskbasedapproachinrehabilitationofwaterdistributionnetworks |