Cargando…
Research on the factors of extremely short construction period under the sufficient resources based on Grey-DEMATEL-ISM
Under the condition of sufficient resources, there are many factors affecting the realization of extremely short construction period of engineering construction projects. Based on literature review and questionnaire survey, this paper firstly selected 17 influencing factors from the five dimensions...
Autores principales: | Peng, Junlong, Peng, Chao, Wang, Mengyao, Hu, Ke, Wu, Dubin |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Public Library of Science
2022
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8912191/ https://www.ncbi.nlm.nih.gov/pubmed/35271675 http://dx.doi.org/10.1371/journal.pone.0265087 |
Ejemplares similares
-
Research on extremely short construction period of engineering project based on labor balance under resource tolerance
por: Peng, Junlong, et al.
Publicado: (2022) -
Improved DEMATEL-ISM integration approach for complex systems
por: Chen, Jih-Kuang
Publicado: (2021) -
Dematel-ISM-Based Study of the Impact of Safety Factors on Urban Rail Tunnel Construction Projects
por: Ou, Liang, et al.
Publicado: (2022) -
Evolving MCDM Applications Using Hybrid Expert-Based ISM and DEMATEL Models: An Example of Sustainable Ecotourism
por: Chuang, Huan-Ming, et al.
Publicado: (2013) -
Factors Influencing Escalator-Related Incidents in China: A Systematic Analysis Using ISM-DEMATEL Method
por: Xie, Kefan, et al.
Publicado: (2019)