Cargando…
Optimal Periods of Conducting Preventive Maintenance to Reduce Expected Downtime and Its Impact on Improving Reliability
The present research mainly aims to use a mathematical formula to determine the optimal intervals for conducting preventive maintenance operations for machines to reduce the expected failure time when the malfunction data follow the Weibull distribution. The reliability function, failure rate, and t...
Autores principales: | , , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Hindawi
2022
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8913151/ https://www.ncbi.nlm.nih.gov/pubmed/35281192 http://dx.doi.org/10.1155/2022/7105526 |
_version_ | 1784667360547831808 |
---|---|
author | Al-Duais, Fuad S. Mohamed, A.-B. A. Jawa, Taghreed M. Sayed-Ahmed, Neveen |
author_facet | Al-Duais, Fuad S. Mohamed, A.-B. A. Jawa, Taghreed M. Sayed-Ahmed, Neveen |
author_sort | Al-Duais, Fuad S. |
collection | PubMed |
description | The present research mainly aims to use a mathematical formula to determine the optimal intervals for conducting preventive maintenance operations for machines to reduce the expected failure time when the malfunction data follow the Weibull distribution. The reliability function, failure rate, and the average time between machine failures were derived after performing preventive maintenance operations and before conducting preventive maintenance operations to state the amelioration that happens to machines. These rely on real data of performing preventive maintenance operations and the downtime required to repair machine or device faults that occur between preventive maintenance periods and the downtime necessary to perform preventive maintenance operations on the machine or device. Thus, the study concluded that preventive maintenance operations are working to increase the reliability of the machine and improve it, as well as to increase the average period of time for the machine to operate between faults. |
format | Online Article Text |
id | pubmed-8913151 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2022 |
publisher | Hindawi |
record_format | MEDLINE/PubMed |
spelling | pubmed-89131512022-03-11 Optimal Periods of Conducting Preventive Maintenance to Reduce Expected Downtime and Its Impact on Improving Reliability Al-Duais, Fuad S. Mohamed, A.-B. A. Jawa, Taghreed M. Sayed-Ahmed, Neveen Comput Intell Neurosci Research Article The present research mainly aims to use a mathematical formula to determine the optimal intervals for conducting preventive maintenance operations for machines to reduce the expected failure time when the malfunction data follow the Weibull distribution. The reliability function, failure rate, and the average time between machine failures were derived after performing preventive maintenance operations and before conducting preventive maintenance operations to state the amelioration that happens to machines. These rely on real data of performing preventive maintenance operations and the downtime required to repair machine or device faults that occur between preventive maintenance periods and the downtime necessary to perform preventive maintenance operations on the machine or device. Thus, the study concluded that preventive maintenance operations are working to increase the reliability of the machine and improve it, as well as to increase the average period of time for the machine to operate between faults. Hindawi 2022-03-03 /pmc/articles/PMC8913151/ /pubmed/35281192 http://dx.doi.org/10.1155/2022/7105526 Text en Copyright © 2022 Fuad S. Al-Duais et al. https://creativecommons.org/licenses/by/4.0/This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. |
spellingShingle | Research Article Al-Duais, Fuad S. Mohamed, A.-B. A. Jawa, Taghreed M. Sayed-Ahmed, Neveen Optimal Periods of Conducting Preventive Maintenance to Reduce Expected Downtime and Its Impact on Improving Reliability |
title | Optimal Periods of Conducting Preventive Maintenance to Reduce Expected Downtime and Its Impact on Improving Reliability |
title_full | Optimal Periods of Conducting Preventive Maintenance to Reduce Expected Downtime and Its Impact on Improving Reliability |
title_fullStr | Optimal Periods of Conducting Preventive Maintenance to Reduce Expected Downtime and Its Impact on Improving Reliability |
title_full_unstemmed | Optimal Periods of Conducting Preventive Maintenance to Reduce Expected Downtime and Its Impact on Improving Reliability |
title_short | Optimal Periods of Conducting Preventive Maintenance to Reduce Expected Downtime and Its Impact on Improving Reliability |
title_sort | optimal periods of conducting preventive maintenance to reduce expected downtime and its impact on improving reliability |
topic | Research Article |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8913151/ https://www.ncbi.nlm.nih.gov/pubmed/35281192 http://dx.doi.org/10.1155/2022/7105526 |
work_keys_str_mv | AT alduaisfuads optimalperiodsofconductingpreventivemaintenancetoreduceexpecteddowntimeanditsimpactonimprovingreliability AT mohamedaba optimalperiodsofconductingpreventivemaintenancetoreduceexpecteddowntimeanditsimpactonimprovingreliability AT jawataghreedm optimalperiodsofconductingpreventivemaintenancetoreduceexpecteddowntimeanditsimpactonimprovingreliability AT sayedahmedneveen optimalperiodsofconductingpreventivemaintenancetoreduceexpecteddowntimeanditsimpactonimprovingreliability |