Cargando…

Ecological Service Value Tradeoffs: An Ecological Water Replenishment Model for the Jilin Momoge National Nature Reserve, China

Wetlands as an important ecosystem type have been damaged in recent years and restoration of wetland ecosystem functions through ecological water replenishment is one of the important ways. The present study involved the construction of a novel ecological water replenishment model for Jilin Momoge N...

Descripción completa

Detalles Bibliográficos
Autores principales: Huang, Jin, Yang, Hao, He, Wei, Li, Yu
Formato: Online Artículo Texto
Lenguaje:English
Publicado: MDPI 2022
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8954108/
https://www.ncbi.nlm.nih.gov/pubmed/35328949
http://dx.doi.org/10.3390/ijerph19063263
_version_ 1784676013551124480
author Huang, Jin
Yang, Hao
He, Wei
Li, Yu
author_facet Huang, Jin
Yang, Hao
He, Wei
Li, Yu
author_sort Huang, Jin
collection PubMed
description Wetlands as an important ecosystem type have been damaged in recent years and restoration of wetland ecosystem functions through ecological water replenishment is one of the important ways. The present study involved the construction of a novel ecological water replenishment model for Jilin Momoge National Nature Reserve (JMNNR) using the interval two-stage stochastic programming (ITSP) method. Breaking down traditional economic models that often sacrifice environmental benefits, the model aims to replenish the ecological water in JMNNR, allocate the ecological water resources scientifically, restore the wetland function of the reserve, improve the functional area of the reserve, enhance the net carbon sequestration capacity of the reserve, and complete the reconstruction of the ecosystem, while considering the ecological service value (ESV) of the reserve to achieve a joint increase in the ecological and economic benefits. The ITSP model constructed in the present study overcame the limitation that the original project recommendation was a single recommended value, and the results are presented in the form of intervals to improve flexibility in decision making to allow the individuals responsible for under-taking decisions to bring focused adjustments according to the actual decision-making conditions and increase the selectivity of the decision-making scheme. The present report discusses the construction of an ITSP model for the ecological water replenishment of JMNNR in an attempt to effectively improve both economic benefits and ecosystem restoration of the reserve, achieve the reconstruction of the JMNNR ecosystem, and provide a selective decision space for the key decision-makers to formulate and optimize the project operation and the management plan. The use of the ITSP model as a pre-procedural basis for the implementation of the project and the simulation of the effects of the implementation of the project can effectively avoid the decision limitations that exist when carrying out the project directly. The ITSP model constructed in this paper can also be used as a theoretical guide for water replenishment projects in different areas of the world, and the model parameters can be reasonably adjusted to achieve better results when used according to the actual local conditions.
format Online
Article
Text
id pubmed-8954108
institution National Center for Biotechnology Information
language English
publishDate 2022
publisher MDPI
record_format MEDLINE/PubMed
spelling pubmed-89541082022-03-26 Ecological Service Value Tradeoffs: An Ecological Water Replenishment Model for the Jilin Momoge National Nature Reserve, China Huang, Jin Yang, Hao He, Wei Li, Yu Int J Environ Res Public Health Article Wetlands as an important ecosystem type have been damaged in recent years and restoration of wetland ecosystem functions through ecological water replenishment is one of the important ways. The present study involved the construction of a novel ecological water replenishment model for Jilin Momoge National Nature Reserve (JMNNR) using the interval two-stage stochastic programming (ITSP) method. Breaking down traditional economic models that often sacrifice environmental benefits, the model aims to replenish the ecological water in JMNNR, allocate the ecological water resources scientifically, restore the wetland function of the reserve, improve the functional area of the reserve, enhance the net carbon sequestration capacity of the reserve, and complete the reconstruction of the ecosystem, while considering the ecological service value (ESV) of the reserve to achieve a joint increase in the ecological and economic benefits. The ITSP model constructed in the present study overcame the limitation that the original project recommendation was a single recommended value, and the results are presented in the form of intervals to improve flexibility in decision making to allow the individuals responsible for under-taking decisions to bring focused adjustments according to the actual decision-making conditions and increase the selectivity of the decision-making scheme. The present report discusses the construction of an ITSP model for the ecological water replenishment of JMNNR in an attempt to effectively improve both economic benefits and ecosystem restoration of the reserve, achieve the reconstruction of the JMNNR ecosystem, and provide a selective decision space for the key decision-makers to formulate and optimize the project operation and the management plan. The use of the ITSP model as a pre-procedural basis for the implementation of the project and the simulation of the effects of the implementation of the project can effectively avoid the decision limitations that exist when carrying out the project directly. The ITSP model constructed in this paper can also be used as a theoretical guide for water replenishment projects in different areas of the world, and the model parameters can be reasonably adjusted to achieve better results when used according to the actual local conditions. MDPI 2022-03-10 /pmc/articles/PMC8954108/ /pubmed/35328949 http://dx.doi.org/10.3390/ijerph19063263 Text en © 2022 by the authors. https://creativecommons.org/licenses/by/4.0/Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/).
spellingShingle Article
Huang, Jin
Yang, Hao
He, Wei
Li, Yu
Ecological Service Value Tradeoffs: An Ecological Water Replenishment Model for the Jilin Momoge National Nature Reserve, China
title Ecological Service Value Tradeoffs: An Ecological Water Replenishment Model for the Jilin Momoge National Nature Reserve, China
title_full Ecological Service Value Tradeoffs: An Ecological Water Replenishment Model for the Jilin Momoge National Nature Reserve, China
title_fullStr Ecological Service Value Tradeoffs: An Ecological Water Replenishment Model for the Jilin Momoge National Nature Reserve, China
title_full_unstemmed Ecological Service Value Tradeoffs: An Ecological Water Replenishment Model for the Jilin Momoge National Nature Reserve, China
title_short Ecological Service Value Tradeoffs: An Ecological Water Replenishment Model for the Jilin Momoge National Nature Reserve, China
title_sort ecological service value tradeoffs: an ecological water replenishment model for the jilin momoge national nature reserve, china
topic Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8954108/
https://www.ncbi.nlm.nih.gov/pubmed/35328949
http://dx.doi.org/10.3390/ijerph19063263
work_keys_str_mv AT huangjin ecologicalservicevaluetradeoffsanecologicalwaterreplenishmentmodelforthejilinmomogenationalnaturereservechina
AT yanghao ecologicalservicevaluetradeoffsanecologicalwaterreplenishmentmodelforthejilinmomogenationalnaturereservechina
AT hewei ecologicalservicevaluetradeoffsanecologicalwaterreplenishmentmodelforthejilinmomogenationalnaturereservechina
AT liyu ecologicalservicevaluetradeoffsanecologicalwaterreplenishmentmodelforthejilinmomogenationalnaturereservechina