A Robust Bi-objective Optimization Model for Resource Levelling Project Scheduling Problem with Discounted Cash Flows
Due to limited financial resources and high costs of infrastructure projects, project stakeholders seek to gain maximum profits with optimal resource utilization as well as cost and time minimization. Therefore, this study presents a multi-mode resource-constrained project scheduling model consideri...
Autores principales: | Banihashemi, Sayyid Ali, Khalilzadeh, Mohammad |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Korean Society of Civil Engineers
2022
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8970061/ http://dx.doi.org/10.1007/s12205-022-0679-z |
Ejemplares similares
-
Stochastic Project Scheduling Optimization for Multi-stage Prefabricated Building Construction with Reliability Application
por: Wang, Jingjing, et al.
Publicado: (2023) -
Project Coordinators’ Perceptions according to the Organization Structure to Reduce Communication Risks in Multinational Project
por: Lee, Kyung-Tae, et al.
Publicado: (2023) -
Buffer Monitoring of Critical Chain Projects Based on Support Vector Machine Prediction
por: Zhang, Junguang, et al.
Publicado: (2023) -
Development of Knowledge Graph Based on Risk Register to Support Risk Management of Construction Projects
por: Isah, Muritala Adebayo, et al.
Publicado: (2023) -
A Novel Approach Based on Fluid Dynamics for On-Site Safety Assessment
por: Liu, Mei, et al.
Publicado: (2021)