Cargando…
Study on Filling Support Design and Ground Pressure Monitoring Scheme for Gob-Side Entry Retention by Roof Cutting and Pressure Relief in High-Gas Thin Coal Seam
To ensure the successful application of roof cutting and pressure relief in the gob, to retain the roadway in a high-gas thin coal seam, by taking the 2109 working face of the Mingxin coal mine as the engineering background, this paper comprehensively analyzes and studies the key parameters of high-...
Autores principales: | Li, Hui, Zu, Haodong, Zhang, Kanglin, Qian, Jifa |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
MDPI
2022
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC8997444/ https://www.ncbi.nlm.nih.gov/pubmed/35409595 http://dx.doi.org/10.3390/ijerph19073913 |
Ejemplares similares
-
Study on the failure law of surrounding rock in inclined coal seam with gob side entry
por: Wu, Hao, et al.
Publicado: (2023) -
A Field Study Implementing New Monitoring Technology for Roof Caving and Systematic Monitoring for Gob-Side Entry Retaining via Roof Cutting in Underground Coal Mining
por: Chen, Ying, et al.
Publicado: (2023) -
Piezoelectric Effect and Ignition Characteristics
of Coal Mine Gob Roof Collapse
por: Wang, Ya-nan, et al.
Publicado: (2021) -
Analysis of the top coal stability of the large section open-off cut under the gob in thick seams slicing mining
por: Chai, Jing, et al.
Publicado: (2022) -
Air Flow Movement
Law in Working Face and Gob with
Roof-Cutting and Pressure-Releasing Mining: A Numerical Simulation
and Engineering Verification
por: Feng, Shuailong, et al.
Publicado: (2023)