Cargando…
Electrifying New York City Ride-Hailing fleets: An examination of the need for public fast charging
This report assesses the scale of public fast charging needed to electrify approximately 20,000 vehicles across the yellow cab and for-hire segments in New York City. The analysis considers real-world trip data in conjunction with driver home locations, overnight charging access rates, driver schedu...
Autores principales: | , , , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Elsevier
2022
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9010761/ https://www.ncbi.nlm.nih.gov/pubmed/35434544 http://dx.doi.org/10.1016/j.isci.2022.104171 |
_version_ | 1784687552816480256 |
---|---|
author | Moniot, Matthew Borlaug, Brennan Ge, Yanbo Wood, Eric Zimbler, Jason |
author_facet | Moniot, Matthew Borlaug, Brennan Ge, Yanbo Wood, Eric Zimbler, Jason |
author_sort | Moniot, Matthew |
collection | PubMed |
description | This report assesses the scale of public fast charging needed to electrify approximately 20,000 vehicles across the yellow cab and for-hire segments in New York City. The analysis considers real-world trip data in conjunction with driver home locations, overnight charging access rates, driver schedules, and more. Outcomes indicate that the existing charging network in New York City is not adequate even in the most optimistic scenario; 1,054 150-kW ports are required when 15% of drivers have access to overnight charging, whereas 367 150-kW ports are needed when 100% of drivers have access. Results also indicate that although charging is demanded in areas nearby high trip demand, fast charging ports are also demanded in areas near driver residences as a supplement for home charging in scenarios with limited overnight charging access. These findings motivate investment into both overnight charging and public fast charging to meet the charging demands of ride-hailing fleets. |
format | Online Article Text |
id | pubmed-9010761 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2022 |
publisher | Elsevier |
record_format | MEDLINE/PubMed |
spelling | pubmed-90107612022-04-16 Electrifying New York City Ride-Hailing fleets: An examination of the need for public fast charging Moniot, Matthew Borlaug, Brennan Ge, Yanbo Wood, Eric Zimbler, Jason iScience Article This report assesses the scale of public fast charging needed to electrify approximately 20,000 vehicles across the yellow cab and for-hire segments in New York City. The analysis considers real-world trip data in conjunction with driver home locations, overnight charging access rates, driver schedules, and more. Outcomes indicate that the existing charging network in New York City is not adequate even in the most optimistic scenario; 1,054 150-kW ports are required when 15% of drivers have access to overnight charging, whereas 367 150-kW ports are needed when 100% of drivers have access. Results also indicate that although charging is demanded in areas nearby high trip demand, fast charging ports are also demanded in areas near driver residences as a supplement for home charging in scenarios with limited overnight charging access. These findings motivate investment into both overnight charging and public fast charging to meet the charging demands of ride-hailing fleets. Elsevier 2022-03-28 /pmc/articles/PMC9010761/ /pubmed/35434544 http://dx.doi.org/10.1016/j.isci.2022.104171 Text en https://creativecommons.org/licenses/by-nc-nd/4.0/This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/). |
spellingShingle | Article Moniot, Matthew Borlaug, Brennan Ge, Yanbo Wood, Eric Zimbler, Jason Electrifying New York City Ride-Hailing fleets: An examination of the need for public fast charging |
title | Electrifying New York City Ride-Hailing fleets: An examination of the need for public fast charging |
title_full | Electrifying New York City Ride-Hailing fleets: An examination of the need for public fast charging |
title_fullStr | Electrifying New York City Ride-Hailing fleets: An examination of the need for public fast charging |
title_full_unstemmed | Electrifying New York City Ride-Hailing fleets: An examination of the need for public fast charging |
title_short | Electrifying New York City Ride-Hailing fleets: An examination of the need for public fast charging |
title_sort | electrifying new york city ride-hailing fleets: an examination of the need for public fast charging |
topic | Article |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9010761/ https://www.ncbi.nlm.nih.gov/pubmed/35434544 http://dx.doi.org/10.1016/j.isci.2022.104171 |
work_keys_str_mv | AT moniotmatthew electrifyingnewyorkcityridehailingfleetsanexaminationoftheneedforpublicfastcharging AT borlaugbrennan electrifyingnewyorkcityridehailingfleetsanexaminationoftheneedforpublicfastcharging AT geyanbo electrifyingnewyorkcityridehailingfleetsanexaminationoftheneedforpublicfastcharging AT wooderic electrifyingnewyorkcityridehailingfleetsanexaminationoftheneedforpublicfastcharging AT zimblerjason electrifyingnewyorkcityridehailingfleetsanexaminationoftheneedforpublicfastcharging |