How to alter path dependency and promote the use of EPC model in public projects of China?
The key to promoting the EPC (Engineering, Procurement, Construction) model in China’s public construction projects is to alter the path dependence of a project owner’s choice of project delivery model (PDM). This study uses evolutionary game theory to discuss the mechanism of government incentives...
Autores principales: | Wang, Shaowen, Liu, Xiaojun, Liu, Na |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Public Library of Science
2022
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9017937/ https://www.ncbi.nlm.nih.gov/pubmed/35439263 http://dx.doi.org/10.1371/journal.pone.0266957 |
Ejemplares similares
-
Conditions of contract for EPC turnkey projects
por: Fédération internationale des ingénieurs-conseils. Lausanne
Publicado: (1998) -
Introducing EPCS
por: Daneels, A
Publicado: (1990) -
Genome-wide epigenetic and proteomic analysis reveals altered Notch signaling in EPC dysfunction
por: Karcher, Jamie R, et al.
Publicado: (2015) -
EPCs enhance angiogenesis in renal regeneration
por: Wang, Xin, et al.
Publicado: (2016) -
National law relating to the EPC
por: European Patent Office. Munich
Publicado: (2017)