Cargando…

Evaluation and optimization of a new microbial enhancement plug-flow ditch system for the pretreatment of acid mine drainage: semi-pilot test

Acid mine drainage (AMD) is typically characterized by low pH, a high concentration of sulfate and dissolved heavy metals. Therefore, it is of practical significance to promote the transformation of soluble Fe and SO(4)(2−) into iron hydroxysulfate minerals by biomineralization of Acidithiobacillus...

Descripción completa

Detalles Bibliográficos
Autores principales: Song, Yongwei, Wang, Heru, Yang, Jun, Zhou, Lixiang, Zhou, Jingcheng, Cao, Yanxiao
Formato: Online Artículo Texto
Lenguaje:English
Publicado: The Royal Society of Chemistry 2018
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9076946/
https://www.ncbi.nlm.nih.gov/pubmed/35538942
http://dx.doi.org/10.1039/c7ra10765j
_version_ 1784702037673377792
author Song, Yongwei
Wang, Heru
Yang, Jun
Zhou, Lixiang
Zhou, Jingcheng
Cao, Yanxiao
author_facet Song, Yongwei
Wang, Heru
Yang, Jun
Zhou, Lixiang
Zhou, Jingcheng
Cao, Yanxiao
author_sort Song, Yongwei
collection PubMed
description Acid mine drainage (AMD) is typically characterized by low pH, a high concentration of sulfate and dissolved heavy metals. Therefore, it is of practical significance to promote the transformation of soluble Fe and SO(4)(2−) into iron hydroxysulfate minerals by biomineralization of Acidithiobacillus ferrooxidans. This enhances the lime neutralization efficiency of AMD by reducing the production of ferric hydroxide and waste gypsum. In this study, a new microbial enhanced plug-flow ditch reaction system was developed for the pretreatment of AMD on a semi-pilot scale. System stability under different hydraulic retention times (HRTs) was examined and the effects of microbe enhancement-lime neutralization technology and direct lime neutralization technology were compared. The bio-oxidation efficiency of Fe(2+) (5 g L(−1)) reached 100% in some parts of the system when HRT was 3 and 2 days, and the time taken to reach steady state was 6 and 4 days, respectively. When the HRT was 1 day, the reaction system had operated for 4 days before the equilibrium was lost. At the optimum HRT (2 days) and after the system was stable, the average precipitation rate of total Fe was 53.62% and the average removal rate of As(iii) was 17.27%. Following microbial enhanced pretreatment, the amount of lime required and waste residues generated for AMD neutralization decreased by 75.00% and 85.25%, respectively. This result supports the application of microbial enhancement-lime neutralization passive treatment technology for AMD.
format Online
Article
Text
id pubmed-9076946
institution National Center for Biotechnology Information
language English
publishDate 2018
publisher The Royal Society of Chemistry
record_format MEDLINE/PubMed
spelling pubmed-90769462022-05-09 Evaluation and optimization of a new microbial enhancement plug-flow ditch system for the pretreatment of acid mine drainage: semi-pilot test Song, Yongwei Wang, Heru Yang, Jun Zhou, Lixiang Zhou, Jingcheng Cao, Yanxiao RSC Adv Chemistry Acid mine drainage (AMD) is typically characterized by low pH, a high concentration of sulfate and dissolved heavy metals. Therefore, it is of practical significance to promote the transformation of soluble Fe and SO(4)(2−) into iron hydroxysulfate minerals by biomineralization of Acidithiobacillus ferrooxidans. This enhances the lime neutralization efficiency of AMD by reducing the production of ferric hydroxide and waste gypsum. In this study, a new microbial enhanced plug-flow ditch reaction system was developed for the pretreatment of AMD on a semi-pilot scale. System stability under different hydraulic retention times (HRTs) was examined and the effects of microbe enhancement-lime neutralization technology and direct lime neutralization technology were compared. The bio-oxidation efficiency of Fe(2+) (5 g L(−1)) reached 100% in some parts of the system when HRT was 3 and 2 days, and the time taken to reach steady state was 6 and 4 days, respectively. When the HRT was 1 day, the reaction system had operated for 4 days before the equilibrium was lost. At the optimum HRT (2 days) and after the system was stable, the average precipitation rate of total Fe was 53.62% and the average removal rate of As(iii) was 17.27%. Following microbial enhanced pretreatment, the amount of lime required and waste residues generated for AMD neutralization decreased by 75.00% and 85.25%, respectively. This result supports the application of microbial enhancement-lime neutralization passive treatment technology for AMD. The Royal Society of Chemistry 2018-01-03 /pmc/articles/PMC9076946/ /pubmed/35538942 http://dx.doi.org/10.1039/c7ra10765j Text en This journal is © The Royal Society of Chemistry https://creativecommons.org/licenses/by-nc/3.0/
spellingShingle Chemistry
Song, Yongwei
Wang, Heru
Yang, Jun
Zhou, Lixiang
Zhou, Jingcheng
Cao, Yanxiao
Evaluation and optimization of a new microbial enhancement plug-flow ditch system for the pretreatment of acid mine drainage: semi-pilot test
title Evaluation and optimization of a new microbial enhancement plug-flow ditch system for the pretreatment of acid mine drainage: semi-pilot test
title_full Evaluation and optimization of a new microbial enhancement plug-flow ditch system for the pretreatment of acid mine drainage: semi-pilot test
title_fullStr Evaluation and optimization of a new microbial enhancement plug-flow ditch system for the pretreatment of acid mine drainage: semi-pilot test
title_full_unstemmed Evaluation and optimization of a new microbial enhancement plug-flow ditch system for the pretreatment of acid mine drainage: semi-pilot test
title_short Evaluation and optimization of a new microbial enhancement plug-flow ditch system for the pretreatment of acid mine drainage: semi-pilot test
title_sort evaluation and optimization of a new microbial enhancement plug-flow ditch system for the pretreatment of acid mine drainage: semi-pilot test
topic Chemistry
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9076946/
https://www.ncbi.nlm.nih.gov/pubmed/35538942
http://dx.doi.org/10.1039/c7ra10765j
work_keys_str_mv AT songyongwei evaluationandoptimizationofanewmicrobialenhancementplugflowditchsystemforthepretreatmentofacidminedrainagesemipilottest
AT wangheru evaluationandoptimizationofanewmicrobialenhancementplugflowditchsystemforthepretreatmentofacidminedrainagesemipilottest
AT yangjun evaluationandoptimizationofanewmicrobialenhancementplugflowditchsystemforthepretreatmentofacidminedrainagesemipilottest
AT zhoulixiang evaluationandoptimizationofanewmicrobialenhancementplugflowditchsystemforthepretreatmentofacidminedrainagesemipilottest
AT zhoujingcheng evaluationandoptimizationofanewmicrobialenhancementplugflowditchsystemforthepretreatmentofacidminedrainagesemipilottest
AT caoyanxiao evaluationandoptimizationofanewmicrobialenhancementplugflowditchsystemforthepretreatmentofacidminedrainagesemipilottest