The Feasibility of Maintaining Biological Phosphorus Removal in A-Stage via the Short Sludge Retention Time Approach: System Performance, Functional Genus Abundance, and Methanogenic Potential
The increasing concerns on resource and energy recovery call for the modification of the current wastewater treatment strategy. This study synthetically evaluates the feasibility of the short sludge retention time approach to improve the energy recovery potential, but keeping steady biological phosp...
Autores principales: | , , , , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
MDPI
2022
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9099736/ https://www.ncbi.nlm.nih.gov/pubmed/35564888 http://dx.doi.org/10.3390/ijerph19095494 |
Sumario: | The increasing concerns on resource and energy recovery call for the modification of the current wastewater treatment strategy. This study synthetically evaluates the feasibility of the short sludge retention time approach to improve the energy recovery potential, but keeping steady biological phosphorus removal and system stability simultaneously. SBR(S-SRT) and SBR(control) that simulated the short sludge retention time and conventional biological phosphorus removal processes, respectively, were set up to treat real domestic sewage for 120 d. SBR(S-SRT) achieved an efficient COD (91.5 ± 3.5%), [Formula: see text]-P (95.4 ± 3.8%), and TP (93.5 ± 3.7%) removal and maintained the settling volume index around 50 mL/gSS when the sludge retention time was 3 d, indicating steady operational stability. The poor ammonia removal performance (15.7 ± 7.7%) and a few sequences detected in samples collected in SBR(S-SRT) indicated the washout of nitrifiers. The dominant phosphorus accumulating organisms Tetrasphaera and Hydrogenophaga, which were enriched with the shortened sludge retention time, was in line with the excellent phosphorus performance of SBR(S-SRT). The calculated methanogenic efficiency of SBR(S-SRT) increased significantly, which was in line with the higher sludge yield. This study proved that the short sludge retention time is a promising and practical approach to integrate biological phosphorus removal in A-stage when re-engineering a biological nutrient removal process. |
---|