Cost Early-Warning Model System of Large-Scale Construction Project

China's construction industry has been suffering from high cost, high efficiency, and maladjustment of management. The traditional management mode makes the construction project face the risk of cost overruns and delays, which cannot achieve the effect of cost control. Therefore, by summarizing...

Descripción completa

Detalles Bibliográficos
Autores principales: Dai, Jingyi, Ke, Dandan
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Hindawi 2022
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9113915/
https://www.ncbi.nlm.nih.gov/pubmed/35592710
http://dx.doi.org/10.1155/2022/3541803
Descripción
Sumario:China's construction industry has been suffering from high cost, high efficiency, and maladjustment of management. The traditional management mode makes the construction project face the risk of cost overruns and delays, which cannot achieve the effect of cost control. Therefore, by summarizing the characteristics of construction projects and the classification of costs, this paper analyzes the foundation of earned value management method in construction and combines it with cost management; in addition, the actual development of Company A is taken as an example, where a cost early-warning system suitable for construction projects is constructed, including the design of the organizational structure, operation platform, and early-warning model of this system, which can improve the cost management level of construction enterprises to a certain extent.