Cost Early-Warning Model System of Large-Scale Construction Project
China's construction industry has been suffering from high cost, high efficiency, and maladjustment of management. The traditional management mode makes the construction project face the risk of cost overruns and delays, which cannot achieve the effect of cost control. Therefore, by summarizing...
Autores principales: | , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Hindawi
2022
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9113915/ https://www.ncbi.nlm.nih.gov/pubmed/35592710 http://dx.doi.org/10.1155/2022/3541803 |
_version_ | 1784709667425878016 |
---|---|
author | Dai, Jingyi Ke, Dandan |
author_facet | Dai, Jingyi Ke, Dandan |
author_sort | Dai, Jingyi |
collection | PubMed |
description | China's construction industry has been suffering from high cost, high efficiency, and maladjustment of management. The traditional management mode makes the construction project face the risk of cost overruns and delays, which cannot achieve the effect of cost control. Therefore, by summarizing the characteristics of construction projects and the classification of costs, this paper analyzes the foundation of earned value management method in construction and combines it with cost management; in addition, the actual development of Company A is taken as an example, where a cost early-warning system suitable for construction projects is constructed, including the design of the organizational structure, operation platform, and early-warning model of this system, which can improve the cost management level of construction enterprises to a certain extent. |
format | Online Article Text |
id | pubmed-9113915 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2022 |
publisher | Hindawi |
record_format | MEDLINE/PubMed |
spelling | pubmed-91139152022-05-18 Cost Early-Warning Model System of Large-Scale Construction Project Dai, Jingyi Ke, Dandan Comput Intell Neurosci Research Article China's construction industry has been suffering from high cost, high efficiency, and maladjustment of management. The traditional management mode makes the construction project face the risk of cost overruns and delays, which cannot achieve the effect of cost control. Therefore, by summarizing the characteristics of construction projects and the classification of costs, this paper analyzes the foundation of earned value management method in construction and combines it with cost management; in addition, the actual development of Company A is taken as an example, where a cost early-warning system suitable for construction projects is constructed, including the design of the organizational structure, operation platform, and early-warning model of this system, which can improve the cost management level of construction enterprises to a certain extent. Hindawi 2022-05-10 /pmc/articles/PMC9113915/ /pubmed/35592710 http://dx.doi.org/10.1155/2022/3541803 Text en Copyright © 2022 Jingyi Dai and Dandan Ke. https://creativecommons.org/licenses/by/4.0/This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. |
spellingShingle | Research Article Dai, Jingyi Ke, Dandan Cost Early-Warning Model System of Large-Scale Construction Project |
title | Cost Early-Warning Model System of Large-Scale Construction Project |
title_full | Cost Early-Warning Model System of Large-Scale Construction Project |
title_fullStr | Cost Early-Warning Model System of Large-Scale Construction Project |
title_full_unstemmed | Cost Early-Warning Model System of Large-Scale Construction Project |
title_short | Cost Early-Warning Model System of Large-Scale Construction Project |
title_sort | cost early-warning model system of large-scale construction project |
topic | Research Article |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9113915/ https://www.ncbi.nlm.nih.gov/pubmed/35592710 http://dx.doi.org/10.1155/2022/3541803 |
work_keys_str_mv | AT daijingyi costearlywarningmodelsystemoflargescaleconstructionproject AT kedandan costearlywarningmodelsystemoflargescaleconstructionproject |