Cost Early-Warning Model System of Large-Scale Construction Project

China's construction industry has been suffering from high cost, high efficiency, and maladjustment of management. The traditional management mode makes the construction project face the risk of cost overruns and delays, which cannot achieve the effect of cost control. Therefore, by summarizing...

Descripción completa

Detalles Bibliográficos
Autores principales: Dai, Jingyi, Ke, Dandan
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Hindawi 2022
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9113915/
https://www.ncbi.nlm.nih.gov/pubmed/35592710
http://dx.doi.org/10.1155/2022/3541803
_version_ 1784709667425878016
author Dai, Jingyi
Ke, Dandan
author_facet Dai, Jingyi
Ke, Dandan
author_sort Dai, Jingyi
collection PubMed
description China's construction industry has been suffering from high cost, high efficiency, and maladjustment of management. The traditional management mode makes the construction project face the risk of cost overruns and delays, which cannot achieve the effect of cost control. Therefore, by summarizing the characteristics of construction projects and the classification of costs, this paper analyzes the foundation of earned value management method in construction and combines it with cost management; in addition, the actual development of Company A is taken as an example, where a cost early-warning system suitable for construction projects is constructed, including the design of the organizational structure, operation platform, and early-warning model of this system, which can improve the cost management level of construction enterprises to a certain extent.
format Online
Article
Text
id pubmed-9113915
institution National Center for Biotechnology Information
language English
publishDate 2022
publisher Hindawi
record_format MEDLINE/PubMed
spelling pubmed-91139152022-05-18 Cost Early-Warning Model System of Large-Scale Construction Project Dai, Jingyi Ke, Dandan Comput Intell Neurosci Research Article China's construction industry has been suffering from high cost, high efficiency, and maladjustment of management. The traditional management mode makes the construction project face the risk of cost overruns and delays, which cannot achieve the effect of cost control. Therefore, by summarizing the characteristics of construction projects and the classification of costs, this paper analyzes the foundation of earned value management method in construction and combines it with cost management; in addition, the actual development of Company A is taken as an example, where a cost early-warning system suitable for construction projects is constructed, including the design of the organizational structure, operation platform, and early-warning model of this system, which can improve the cost management level of construction enterprises to a certain extent. Hindawi 2022-05-10 /pmc/articles/PMC9113915/ /pubmed/35592710 http://dx.doi.org/10.1155/2022/3541803 Text en Copyright © 2022 Jingyi Dai and Dandan Ke. https://creativecommons.org/licenses/by/4.0/This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.
spellingShingle Research Article
Dai, Jingyi
Ke, Dandan
Cost Early-Warning Model System of Large-Scale Construction Project
title Cost Early-Warning Model System of Large-Scale Construction Project
title_full Cost Early-Warning Model System of Large-Scale Construction Project
title_fullStr Cost Early-Warning Model System of Large-Scale Construction Project
title_full_unstemmed Cost Early-Warning Model System of Large-Scale Construction Project
title_short Cost Early-Warning Model System of Large-Scale Construction Project
title_sort cost early-warning model system of large-scale construction project
topic Research Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9113915/
https://www.ncbi.nlm.nih.gov/pubmed/35592710
http://dx.doi.org/10.1155/2022/3541803
work_keys_str_mv AT daijingyi costearlywarningmodelsystemoflargescaleconstructionproject
AT kedandan costearlywarningmodelsystemoflargescaleconstructionproject