Cargando…

Modified Meyerhof approach for forecasting reliable ultimate capacity of the large diameter bored piles

The static loading test is undoubtedly the most reliable method for forecasting the ultimate capacity of the large diameter bored piles (LDBP). However, in-situ loading of this class of piles until reaching failure is practically seldom due to the large amount of settlement required for shaft and ba...

Descripción completa

Detalles Bibliográficos
Autores principales: Al-Atroush, M. E., Hefny, A. M., Sorour, T. M.
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Nature Publishing Group UK 2022
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9122945/
https://www.ncbi.nlm.nih.gov/pubmed/35595734
http://dx.doi.org/10.1038/s41598-022-12238-w
_version_ 1784711455079137280
author Al-Atroush, M. E.
Hefny, A. M.
Sorour, T. M.
author_facet Al-Atroush, M. E.
Hefny, A. M.
Sorour, T. M.
author_sort Al-Atroush, M. E.
collection PubMed
description The static loading test is undoubtedly the most reliable method for forecasting the ultimate capacity of the large diameter bored piles (LDBP). However, in-situ loading of this class of piles until reaching failure is practically seldom due to the large amount of settlement required for shaft and base mobilization. Therefore, many international design standards recommend either capacity-based or settlement-based methods to estimate the LDBP ultimate capacity in case of the impossibility of performing loading tests during the design phase. However, those methods are invariably associated with various degrees of uncertainty resulting from several factors, as evidenced in several comparative analyses available in the literature. For instance, the settlement-based method of the Egyptian code of practice (ECP 202/4) usually underestimates the ultimate capacity of LDBP. In contrast, Meyerhof's capacity-based method often overestimates the LDBP’s ultimate capacity. In this paper, a modified approach has been proposed to forecast the ultimate capacity of the LDBP. This approach was modified from Meyerhof’s classical formula (1976) through three fundamental stages. First, an assessment study was performed to evaluate the reliability of the estimated LDBP ultimate capacity using Meyerhof’s classical method. For this purpose, results of full scale loaded to failure loading LDBP test and related twenty-eight parametric numerical models with various pile geometrical and soil geotechnical parameters have been used. Based on the assessment study findings, the essential modifications were suggested in the second stage to adapt Meyerhof’s classic method. In the third stage, the results of several numerical models and in-situ loading tests were employed to assess the accuracy of the developed modified method. This study showed that Meyerhof's classical method overestimated the ultimate capacity of LDBP with an error percentage ranging from 14 to 46%. On the other side, the proposed modified approach has succeeded in estimating the ultimate capacity of loaded to failure in-situ LDBP test and twenty numerical LDBP models with error percentages ranging from 0.267 to 7.75%.
format Online
Article
Text
id pubmed-9122945
institution National Center for Biotechnology Information
language English
publishDate 2022
publisher Nature Publishing Group UK
record_format MEDLINE/PubMed
spelling pubmed-91229452022-05-22 Modified Meyerhof approach for forecasting reliable ultimate capacity of the large diameter bored piles Al-Atroush, M. E. Hefny, A. M. Sorour, T. M. Sci Rep Article The static loading test is undoubtedly the most reliable method for forecasting the ultimate capacity of the large diameter bored piles (LDBP). However, in-situ loading of this class of piles until reaching failure is practically seldom due to the large amount of settlement required for shaft and base mobilization. Therefore, many international design standards recommend either capacity-based or settlement-based methods to estimate the LDBP ultimate capacity in case of the impossibility of performing loading tests during the design phase. However, those methods are invariably associated with various degrees of uncertainty resulting from several factors, as evidenced in several comparative analyses available in the literature. For instance, the settlement-based method of the Egyptian code of practice (ECP 202/4) usually underestimates the ultimate capacity of LDBP. In contrast, Meyerhof's capacity-based method often overestimates the LDBP’s ultimate capacity. In this paper, a modified approach has been proposed to forecast the ultimate capacity of the LDBP. This approach was modified from Meyerhof’s classical formula (1976) through three fundamental stages. First, an assessment study was performed to evaluate the reliability of the estimated LDBP ultimate capacity using Meyerhof’s classical method. For this purpose, results of full scale loaded to failure loading LDBP test and related twenty-eight parametric numerical models with various pile geometrical and soil geotechnical parameters have been used. Based on the assessment study findings, the essential modifications were suggested in the second stage to adapt Meyerhof’s classic method. In the third stage, the results of several numerical models and in-situ loading tests were employed to assess the accuracy of the developed modified method. This study showed that Meyerhof's classical method overestimated the ultimate capacity of LDBP with an error percentage ranging from 14 to 46%. On the other side, the proposed modified approach has succeeded in estimating the ultimate capacity of loaded to failure in-situ LDBP test and twenty numerical LDBP models with error percentages ranging from 0.267 to 7.75%. Nature Publishing Group UK 2022-05-20 /pmc/articles/PMC9122945/ /pubmed/35595734 http://dx.doi.org/10.1038/s41598-022-12238-w Text en © The Author(s) 2022 https://creativecommons.org/licenses/by/4.0/Open Access This article is licensed under a Creative Commons Attribution 4.0 International License, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons licence, and indicate if changes were made. The images or other third party material in this article are included in the article's Creative Commons licence, unless indicated otherwise in a credit line to the material. If material is not included in the article's Creative Commons licence and your intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain permission directly from the copyright holder. To view a copy of this licence, visit http://creativecommons.org/licenses/by/4.0/ (https://creativecommons.org/licenses/by/4.0/) .
spellingShingle Article
Al-Atroush, M. E.
Hefny, A. M.
Sorour, T. M.
Modified Meyerhof approach for forecasting reliable ultimate capacity of the large diameter bored piles
title Modified Meyerhof approach for forecasting reliable ultimate capacity of the large diameter bored piles
title_full Modified Meyerhof approach for forecasting reliable ultimate capacity of the large diameter bored piles
title_fullStr Modified Meyerhof approach for forecasting reliable ultimate capacity of the large diameter bored piles
title_full_unstemmed Modified Meyerhof approach for forecasting reliable ultimate capacity of the large diameter bored piles
title_short Modified Meyerhof approach for forecasting reliable ultimate capacity of the large diameter bored piles
title_sort modified meyerhof approach for forecasting reliable ultimate capacity of the large diameter bored piles
topic Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9122945/
https://www.ncbi.nlm.nih.gov/pubmed/35595734
http://dx.doi.org/10.1038/s41598-022-12238-w
work_keys_str_mv AT alatroushme modifiedmeyerhofapproachforforecastingreliableultimatecapacityofthelargediameterboredpiles
AT hefnyam modifiedmeyerhofapproachforforecastingreliableultimatecapacityofthelargediameterboredpiles
AT sorourtm modifiedmeyerhofapproachforforecastingreliableultimatecapacityofthelargediameterboredpiles