Cargando…

State of Prestressing Analysis of 62-Year-Old Bridge

Ageing infrastructure leads to the need for a proper assessment and final decisions considering its state. In the case of prestressed concrete structures, knowledge of the residual state of prestressing is the crucial factor. Therefore, reliable diagnostic techniques for determining the residual val...

Descripción completa

Detalles Bibliográficos
Autores principales: Kralovanec, Jakub, Bahleda, Frantisek, Moravcik, Martin
Formato: Online Artículo Texto
Lenguaje:English
Publicado: MDPI 2022
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9146291/
https://www.ncbi.nlm.nih.gov/pubmed/35629609
http://dx.doi.org/10.3390/ma15103583
_version_ 1784716527211118592
author Kralovanec, Jakub
Bahleda, Frantisek
Moravcik, Martin
author_facet Kralovanec, Jakub
Bahleda, Frantisek
Moravcik, Martin
author_sort Kralovanec, Jakub
collection PubMed
description Ageing infrastructure leads to the need for a proper assessment and final decisions considering its state. In the case of prestressed concrete structures, knowledge of the residual state of prestressing is the crucial factor. Therefore, reliable diagnostic techniques for determining the residual value of the prestressing force are needed. This information is subsequently used in the process of the quantification of the load-carrying capacity and remaining service life of prestressed concrete structures. The presented paper introduces an evaluation of a monolithic 62-year-old prestressed concrete bridge, which was built in 1959. The assessment was carried out as a result of concerns after exposure of the anchorage area of the bridge, which was executed during the construction of the new system of anti-flood barriers in the town of Banska Bystrica in central Slovakia. Therefore, the diagnostic survey and subsequent determination of the residual prestressing force included the application of the saw-cut method, the structural response method, and the Barkhausen noise technique. Finally, the experimental program supported by numerical analysis provided information about the actual state of prestressing in the bridge. Results of performed analysis suggested that the state of prestressing of the bridge in question does not significantly differ from the expected level of prestressing after 62 years of service. Subsequently, obtained conclusions enabled the determination of the load-carrying capacity for future use in the form of a pedestrian bridge.
format Online
Article
Text
id pubmed-9146291
institution National Center for Biotechnology Information
language English
publishDate 2022
publisher MDPI
record_format MEDLINE/PubMed
spelling pubmed-91462912022-05-29 State of Prestressing Analysis of 62-Year-Old Bridge Kralovanec, Jakub Bahleda, Frantisek Moravcik, Martin Materials (Basel) Article Ageing infrastructure leads to the need for a proper assessment and final decisions considering its state. In the case of prestressed concrete structures, knowledge of the residual state of prestressing is the crucial factor. Therefore, reliable diagnostic techniques for determining the residual value of the prestressing force are needed. This information is subsequently used in the process of the quantification of the load-carrying capacity and remaining service life of prestressed concrete structures. The presented paper introduces an evaluation of a monolithic 62-year-old prestressed concrete bridge, which was built in 1959. The assessment was carried out as a result of concerns after exposure of the anchorage area of the bridge, which was executed during the construction of the new system of anti-flood barriers in the town of Banska Bystrica in central Slovakia. Therefore, the diagnostic survey and subsequent determination of the residual prestressing force included the application of the saw-cut method, the structural response method, and the Barkhausen noise technique. Finally, the experimental program supported by numerical analysis provided information about the actual state of prestressing in the bridge. Results of performed analysis suggested that the state of prestressing of the bridge in question does not significantly differ from the expected level of prestressing after 62 years of service. Subsequently, obtained conclusions enabled the determination of the load-carrying capacity for future use in the form of a pedestrian bridge. MDPI 2022-05-17 /pmc/articles/PMC9146291/ /pubmed/35629609 http://dx.doi.org/10.3390/ma15103583 Text en © 2022 by the authors. https://creativecommons.org/licenses/by/4.0/Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/).
spellingShingle Article
Kralovanec, Jakub
Bahleda, Frantisek
Moravcik, Martin
State of Prestressing Analysis of 62-Year-Old Bridge
title State of Prestressing Analysis of 62-Year-Old Bridge
title_full State of Prestressing Analysis of 62-Year-Old Bridge
title_fullStr State of Prestressing Analysis of 62-Year-Old Bridge
title_full_unstemmed State of Prestressing Analysis of 62-Year-Old Bridge
title_short State of Prestressing Analysis of 62-Year-Old Bridge
title_sort state of prestressing analysis of 62-year-old bridge
topic Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9146291/
https://www.ncbi.nlm.nih.gov/pubmed/35629609
http://dx.doi.org/10.3390/ma15103583
work_keys_str_mv AT kralovanecjakub stateofprestressinganalysisof62yearoldbridge
AT bahledafrantisek stateofprestressinganalysisof62yearoldbridge
AT moravcikmartin stateofprestressinganalysisof62yearoldbridge