Cargando…

Model-Predictive Control for the Three-Tank System Utilizing an Industrial Automation System

[Image: see text] A three-tank process has difficulty in controller design because of nonlinear flow and interactions between tanks. This paper addresses the design methodology of the model-predictive controller (MPC) for the three-tank system. The control performance of the proposed MPC controller...

Descripción completa

Detalles Bibliográficos
Autor principal: Kortela, Jukka
Formato: Online Artículo Texto
Lenguaje:English
Publicado: American Chemical Society 2022
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9178774/
https://www.ncbi.nlm.nih.gov/pubmed/35694502
http://dx.doi.org/10.1021/acsomega.2c01275
Descripción
Sumario:[Image: see text] A three-tank process has difficulty in controller design because of nonlinear flow and interactions between tanks. This paper addresses the design methodology of the model-predictive controller (MPC) for the three-tank system. The control performance of the proposed MPC controller is compared with the proportional plus integral (PI) controller by both simulations and experiments on the real three-tank pilot with the industrial ABB 800xA automation system. The MPC controller shows a faster response for the two tanks: In the simulation, the settling times are about 120 s for both tanks of the MPC controller. On the other hand, the settling times for the PI controller are about 200 s for the first tank and 150 s for the second tank. The experiments confirm these results.