Cargando…
Integrating moving average control procedures into the risk-based quality control plan in small-volume medical laboratories
INTRODUCTION: The modern approach to quality control (QC) in medical laboratories implies the development of a risk-based control plan. This paper aims to develop a risk-based QC plan for a laboratory with a small daily testing volume and to integrate the already optimized moving average (MA) contro...
Autores principales: | , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Croatian Society of Medical Biochemistry and Laboratory Medicine
2022
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9195605/ https://www.ncbi.nlm.nih.gov/pubmed/35799981 http://dx.doi.org/10.11613/BM.2022.020711 |
Sumario: | INTRODUCTION: The modern approach to quality control (QC) in medical laboratories implies the development of a risk-based control plan. This paper aims to develop a risk-based QC plan for a laboratory with a small daily testing volume and to integrate the already optimized moving average (MA) control procedures into this plan. MATERIALS AND METHODS: A multistage bracketed QC plan for ten clinical chemistry analytes was made using a Westgard QC frequency calculator. Previously, MA procedures were optimized by the bias detection simulation method. RESULTS: Aspartate aminotransferase, HDL-cholesterol and potassium had patient-risk sigma metrics greater than 6, albumin and cholesterol greater than 5, creatinine, chlorides, calcium and total proteins between 4 and 5, and sodium less than 4. Based on the calculated run sizes and characteristics of optimized MA procedures, for 6 tests, it was possible to replace the monitoring QC procedure with an MA procedure. For the remaining 4 tests, it was necessary to keep the monitoring QC procedure and introduce MA control for added security. CONCLUSION: This study showed that even in a laboratory with a small volume of daily testing, it is possible to make a risk-based QC plan and integrate MA control procedures into that plan. |
---|