Cargando…
Constructability practices in construction industry in Muscat: case study
This study aims to review the concept of constructability and evaluate the level of implementation of constructability practices in the construction industry in Muscat Governorate. One hundred and ninety questionnaires were distributed, and 85 complete responses were received, including 10 from owne...
Autores principales: | , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Springer International Publishing
2022
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9264292/ http://dx.doi.org/10.1007/s42107-022-00475-3 |
_version_ | 1784742944947830784 |
---|---|
author | Al Hamadani, Said Al Alawi, Mubarak Al Nuaimi, Ali |
author_facet | Al Hamadani, Said Al Alawi, Mubarak Al Nuaimi, Ali |
author_sort | Al Hamadani, Said |
collection | PubMed |
description | This study aims to review the concept of constructability and evaluate the level of implementation of constructability practices in the construction industry in Muscat Governorate. One hundred and ninety questionnaires were distributed, and 85 complete responses were received, including 10 from owners (12%), 64 from consultants (75%) and 11 from the contractors (13%). The results showed that owners, consultants, and contractors recognize, support, and practice constructability efforts. 45% of the respondents said that constructability efforts typically begin in preconstruction planning, which shows a positive awareness that constructability efforts must start at the earliest stage of a project’s life cycle. In addition, 60% of the respondents indicated that they performed constructability by following a constructability procedure during the design stage. All the respondents agreed that constructability implementation obstacles continued to exist in construction projects in Muscat and the cost and time associated with the implementation of constructability review practices are the most dominant obstacles. Although constructability has been recognized in Muscat’s construction industry, the level of constructability awareness and improvement in cost and time estimation and quality requirements are developing. |
format | Online Article Text |
id | pubmed-9264292 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2022 |
publisher | Springer International Publishing |
record_format | MEDLINE/PubMed |
spelling | pubmed-92642922022-07-08 Constructability practices in construction industry in Muscat: case study Al Hamadani, Said Al Alawi, Mubarak Al Nuaimi, Ali Asian J Civ Eng Original Paper This study aims to review the concept of constructability and evaluate the level of implementation of constructability practices in the construction industry in Muscat Governorate. One hundred and ninety questionnaires were distributed, and 85 complete responses were received, including 10 from owners (12%), 64 from consultants (75%) and 11 from the contractors (13%). The results showed that owners, consultants, and contractors recognize, support, and practice constructability efforts. 45% of the respondents said that constructability efforts typically begin in preconstruction planning, which shows a positive awareness that constructability efforts must start at the earliest stage of a project’s life cycle. In addition, 60% of the respondents indicated that they performed constructability by following a constructability procedure during the design stage. All the respondents agreed that constructability implementation obstacles continued to exist in construction projects in Muscat and the cost and time associated with the implementation of constructability review practices are the most dominant obstacles. Although constructability has been recognized in Muscat’s construction industry, the level of constructability awareness and improvement in cost and time estimation and quality requirements are developing. Springer International Publishing 2022-07-08 2022 /pmc/articles/PMC9264292/ http://dx.doi.org/10.1007/s42107-022-00475-3 Text en © The Author(s), under exclusive licence to Springer Nature Switzerland AG 2022 This article is made available via the PMC Open Access Subset for unrestricted research re-use and secondary analysis in any form or by any means with acknowledgement of the original source. These permissions are granted for the duration of the World Health Organization (WHO) declaration of COVID-19 as a global pandemic. |
spellingShingle | Original Paper Al Hamadani, Said Al Alawi, Mubarak Al Nuaimi, Ali Constructability practices in construction industry in Muscat: case study |
title | Constructability practices in construction industry in Muscat: case study |
title_full | Constructability practices in construction industry in Muscat: case study |
title_fullStr | Constructability practices in construction industry in Muscat: case study |
title_full_unstemmed | Constructability practices in construction industry in Muscat: case study |
title_short | Constructability practices in construction industry in Muscat: case study |
title_sort | constructability practices in construction industry in muscat: case study |
topic | Original Paper |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9264292/ http://dx.doi.org/10.1007/s42107-022-00475-3 |
work_keys_str_mv | AT alhamadanisaid constructabilitypracticesinconstructionindustryinmuscatcasestudy AT alalawimubarak constructabilitypracticesinconstructionindustryinmuscatcasestudy AT alnuaimiali constructabilitypracticesinconstructionindustryinmuscatcasestudy |