Cargando…
A Two-Workshop Collaborative, Integrated Scheduling Algorithm considering the Prescheduling of the Root-Subtree Processes
Aiming at the existing two-workshop integrated scheduling algorithm with the same equipment resources, a unified vertical or horizontal scheduling rule is used to sort all processes and ignore the vertical and horizontal characteristics of the associated process position in the process tree, which a...
Autores principales: | , , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Hindawi
2022
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9357779/ https://www.ncbi.nlm.nih.gov/pubmed/35958759 http://dx.doi.org/10.1155/2022/9065638 |
_version_ | 1784763785432530944 |
---|---|
author | Xie, Zhiqiang Teng, Haikun Ming, Jingwei Yue, Xiaoguang |
author_facet | Xie, Zhiqiang Teng, Haikun Ming, Jingwei Yue, Xiaoguang |
author_sort | Xie, Zhiqiang |
collection | PubMed |
description | Aiming at the existing two-workshop integrated scheduling algorithm with the same equipment resources, a unified vertical or horizontal scheduling rule is used to sort all processes and ignore the vertical and horizontal characteristics of the associated process position in the process tree, which affects the scheduling results. A two-workshop collaborative, integrated scheduling algorithm considering the prescheduling of the Root-Subtree processes is proposed. The algorithm proposes a process conflict adjustment strategy for the horizontal equipment constraints. The same equipment Root-Subtree processes are sorted and loaded into the corresponding equipment queue through the vertical and horizontal prescheduling method in a single-workshop environment, and it combines with the schedulable process set to dequeue the first process of the queue. To enhance the flexibility of process scheduling, it proposes a process conflict adjustment strategy for the vertical process tree constraints in the two workshops to determine the processing workshop of the processes and the actual start time, which narrows the search comparison for schedulable processes. The example tests show that the algorithm not only excavates and utilizes the effectiveness of the vertical and horizontal characteristics of the process tree, but also considers the process migration time. Therefore, the effect is better and more practical. |
format | Online Article Text |
id | pubmed-9357779 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2022 |
publisher | Hindawi |
record_format | MEDLINE/PubMed |
spelling | pubmed-93577792022-08-10 A Two-Workshop Collaborative, Integrated Scheduling Algorithm considering the Prescheduling of the Root-Subtree Processes Xie, Zhiqiang Teng, Haikun Ming, Jingwei Yue, Xiaoguang Comput Intell Neurosci Research Article Aiming at the existing two-workshop integrated scheduling algorithm with the same equipment resources, a unified vertical or horizontal scheduling rule is used to sort all processes and ignore the vertical and horizontal characteristics of the associated process position in the process tree, which affects the scheduling results. A two-workshop collaborative, integrated scheduling algorithm considering the prescheduling of the Root-Subtree processes is proposed. The algorithm proposes a process conflict adjustment strategy for the horizontal equipment constraints. The same equipment Root-Subtree processes are sorted and loaded into the corresponding equipment queue through the vertical and horizontal prescheduling method in a single-workshop environment, and it combines with the schedulable process set to dequeue the first process of the queue. To enhance the flexibility of process scheduling, it proposes a process conflict adjustment strategy for the vertical process tree constraints in the two workshops to determine the processing workshop of the processes and the actual start time, which narrows the search comparison for schedulable processes. The example tests show that the algorithm not only excavates and utilizes the effectiveness of the vertical and horizontal characteristics of the process tree, but also considers the process migration time. Therefore, the effect is better and more practical. Hindawi 2022-07-31 /pmc/articles/PMC9357779/ /pubmed/35958759 http://dx.doi.org/10.1155/2022/9065638 Text en Copyright © 2022 Zhiqiang Xie et al. https://creativecommons.org/licenses/by/4.0/This is an open access article distributed under the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited. |
spellingShingle | Research Article Xie, Zhiqiang Teng, Haikun Ming, Jingwei Yue, Xiaoguang A Two-Workshop Collaborative, Integrated Scheduling Algorithm considering the Prescheduling of the Root-Subtree Processes |
title | A Two-Workshop Collaborative, Integrated Scheduling Algorithm considering the Prescheduling of the Root-Subtree Processes |
title_full | A Two-Workshop Collaborative, Integrated Scheduling Algorithm considering the Prescheduling of the Root-Subtree Processes |
title_fullStr | A Two-Workshop Collaborative, Integrated Scheduling Algorithm considering the Prescheduling of the Root-Subtree Processes |
title_full_unstemmed | A Two-Workshop Collaborative, Integrated Scheduling Algorithm considering the Prescheduling of the Root-Subtree Processes |
title_short | A Two-Workshop Collaborative, Integrated Scheduling Algorithm considering the Prescheduling of the Root-Subtree Processes |
title_sort | two-workshop collaborative, integrated scheduling algorithm considering the prescheduling of the root-subtree processes |
topic | Research Article |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9357779/ https://www.ncbi.nlm.nih.gov/pubmed/35958759 http://dx.doi.org/10.1155/2022/9065638 |
work_keys_str_mv | AT xiezhiqiang atwoworkshopcollaborativeintegratedschedulingalgorithmconsideringthepreschedulingoftherootsubtreeprocesses AT tenghaikun atwoworkshopcollaborativeintegratedschedulingalgorithmconsideringthepreschedulingoftherootsubtreeprocesses AT mingjingwei atwoworkshopcollaborativeintegratedschedulingalgorithmconsideringthepreschedulingoftherootsubtreeprocesses AT yuexiaoguang atwoworkshopcollaborativeintegratedschedulingalgorithmconsideringthepreschedulingoftherootsubtreeprocesses AT xiezhiqiang twoworkshopcollaborativeintegratedschedulingalgorithmconsideringthepreschedulingoftherootsubtreeprocesses AT tenghaikun twoworkshopcollaborativeintegratedschedulingalgorithmconsideringthepreschedulingoftherootsubtreeprocesses AT mingjingwei twoworkshopcollaborativeintegratedschedulingalgorithmconsideringthepreschedulingoftherootsubtreeprocesses AT yuexiaoguang twoworkshopcollaborativeintegratedschedulingalgorithmconsideringthepreschedulingoftherootsubtreeprocesses |