Cargando…
A Two-Workshop Collaborative, Integrated Scheduling Algorithm considering the Prescheduling of the Root-Subtree Processes
Aiming at the existing two-workshop integrated scheduling algorithm with the same equipment resources, a unified vertical or horizontal scheduling rule is used to sort all processes and ignore the vertical and horizontal characteristics of the associated process position in the process tree, which a...
Autores principales: | , , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Hindawi
2022
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9357779/ https://www.ncbi.nlm.nih.gov/pubmed/35958759 http://dx.doi.org/10.1155/2022/9065638 |