Cargando…

A Two-Workshop Collaborative, Integrated Scheduling Algorithm considering the Prescheduling of the Root-Subtree Processes

Aiming at the existing two-workshop integrated scheduling algorithm with the same equipment resources, a unified vertical or horizontal scheduling rule is used to sort all processes and ignore the vertical and horizontal characteristics of the associated process position in the process tree, which a...

Descripción completa

Detalles Bibliográficos
Autores principales: Xie, Zhiqiang, Teng, Haikun, Ming, Jingwei, Yue, Xiaoguang
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Hindawi 2022
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9357779/
https://www.ncbi.nlm.nih.gov/pubmed/35958759
http://dx.doi.org/10.1155/2022/9065638