Cargando…
A Two-Workshop Collaborative, Integrated Scheduling Algorithm considering the Prescheduling of the Root-Subtree Processes
Aiming at the existing two-workshop integrated scheduling algorithm with the same equipment resources, a unified vertical or horizontal scheduling rule is used to sort all processes and ignore the vertical and horizontal characteristics of the associated process position in the process tree, which a...
Autores principales: | Xie, Zhiqiang, Teng, Haikun, Ming, Jingwei, Yue, Xiaoguang |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Hindawi
2022
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9357779/ https://www.ncbi.nlm.nih.gov/pubmed/35958759 http://dx.doi.org/10.1155/2022/9065638 |
Ejemplares similares
-
Prescheduled Interleaving of Processing Reduces Interference in Motor-Cognitive Dual Tasks
por: Langhanns, Christine, et al.
Publicado: (2020) -
An optimal algorithm for computing all subtree repeats in trees
por: Flouri, T., et al.
Publicado: (2014) -
Supertrees Based on the Subtree Prune-and-Regraft Distance
por: Whidden, Christopher, et al.
Publicado: (2014) -
A Pulmonary Artery-Vein Separation Algorithm Based on the Relationship between Subtrees Information
por: Yu, Kun, et al.
Publicado: (2021) -
Unrooted unordered homeomorphic subtree alignment of RNA trees
por: Milo, Nimrod, et al.
Publicado: (2013)