Cargando…
Scheduling of Batch Operation for a Wastewater Treatment Plant under Time-of-Use Electricity Pricing
[Image: see text] High operating cost caused by electric energy consumption is a common problem challenging many municipal wastewater treatment plants (WWTPs). Due to the characteristics of intermittent inflow and aeration, WWTPs using sequencing batch reactor technology and its variants can be mana...
Autores principales: | , , , , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
American Chemical Society
2022
|
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9387175/ https://www.ncbi.nlm.nih.gov/pubmed/35990441 http://dx.doi.org/10.1021/acsomega.2c03302 |
_version_ | 1784769965846429696 |
---|---|
author | Wang, Zhaoqing Gu, Dungang Lu, Jiaqi Zhang, Nan Liu, Yang Li, Guanghui |
author_facet | Wang, Zhaoqing Gu, Dungang Lu, Jiaqi Zhang, Nan Liu, Yang Li, Guanghui |
author_sort | Wang, Zhaoqing |
collection | PubMed |
description | [Image: see text] High operating cost caused by electric energy consumption is a common problem challenging many municipal wastewater treatment plants (WWTPs). Due to the characteristics of intermittent inflow and aeration, WWTPs using sequencing batch reactor technology and its variants can be managed to relieve operating cost through taking advantage of time-of-use electricity pricing. However, little attention has been paid to the scheduling of treatment processes in the context of WWTPs. In this paper, a novel mixed-integer linear programming model is established for scheduling the batch operation of a WWTP under time-of-use electricity pricing, which considers constraints arising from task allocation, processing sequence, and processing duration. The modeling method is developed from the event-based continuous-time approach. The start time and end time of each treatment task are optimized to shift electricity consumption from peak hours to off-peak hours to the greatest extent, thus minimizing electricity cost. A case study demonstrates that the proposed model can quickly generate precise operational plans for the investigated WWTP. By implementing the optimum schedules, the WWTP can save on its electricity bill without changing the treatment capacity or the treatment process. The widening of peak and off-peak electricity pricing gap is favorable for the proposed model to display a more significant effect in reducing electricity cost. |
format | Online Article Text |
id | pubmed-9387175 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2022 |
publisher | American Chemical Society |
record_format | MEDLINE/PubMed |
spelling | pubmed-93871752022-08-19 Scheduling of Batch Operation for a Wastewater Treatment Plant under Time-of-Use Electricity Pricing Wang, Zhaoqing Gu, Dungang Lu, Jiaqi Zhang, Nan Liu, Yang Li, Guanghui ACS Omega [Image: see text] High operating cost caused by electric energy consumption is a common problem challenging many municipal wastewater treatment plants (WWTPs). Due to the characteristics of intermittent inflow and aeration, WWTPs using sequencing batch reactor technology and its variants can be managed to relieve operating cost through taking advantage of time-of-use electricity pricing. However, little attention has been paid to the scheduling of treatment processes in the context of WWTPs. In this paper, a novel mixed-integer linear programming model is established for scheduling the batch operation of a WWTP under time-of-use electricity pricing, which considers constraints arising from task allocation, processing sequence, and processing duration. The modeling method is developed from the event-based continuous-time approach. The start time and end time of each treatment task are optimized to shift electricity consumption from peak hours to off-peak hours to the greatest extent, thus minimizing electricity cost. A case study demonstrates that the proposed model can quickly generate precise operational plans for the investigated WWTP. By implementing the optimum schedules, the WWTP can save on its electricity bill without changing the treatment capacity or the treatment process. The widening of peak and off-peak electricity pricing gap is favorable for the proposed model to display a more significant effect in reducing electricity cost. American Chemical Society 2022-08-08 /pmc/articles/PMC9387175/ /pubmed/35990441 http://dx.doi.org/10.1021/acsomega.2c03302 Text en © 2022 The Authors. Published by American Chemical Society https://creativecommons.org/licenses/by-nc-nd/4.0/Permits non-commercial access and re-use, provided that author attribution and integrity are maintained; but does not permit creation of adaptations or other derivative works (https://creativecommons.org/licenses/by-nc-nd/4.0/). |
spellingShingle | Wang, Zhaoqing Gu, Dungang Lu, Jiaqi Zhang, Nan Liu, Yang Li, Guanghui Scheduling of Batch Operation for a Wastewater Treatment Plant under Time-of-Use Electricity Pricing |
title | Scheduling of Batch Operation for a Wastewater Treatment Plant under
Time-of-Use Electricity Pricing |
title_full | Scheduling of Batch Operation for a Wastewater Treatment Plant under
Time-of-Use Electricity Pricing |
title_fullStr | Scheduling of Batch Operation for a Wastewater Treatment Plant under
Time-of-Use Electricity Pricing |
title_full_unstemmed | Scheduling of Batch Operation for a Wastewater Treatment Plant under
Time-of-Use Electricity Pricing |
title_short | Scheduling of Batch Operation for a Wastewater Treatment Plant under
Time-of-Use Electricity Pricing |
title_sort | scheduling of batch operation for a wastewater treatment plant under
time-of-use electricity pricing |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9387175/ https://www.ncbi.nlm.nih.gov/pubmed/35990441 http://dx.doi.org/10.1021/acsomega.2c03302 |
work_keys_str_mv | AT wangzhaoqing schedulingofbatchoperationforawastewatertreatmentplantundertimeofuseelectricitypricing AT gudungang schedulingofbatchoperationforawastewatertreatmentplantundertimeofuseelectricitypricing AT lujiaqi schedulingofbatchoperationforawastewatertreatmentplantundertimeofuseelectricitypricing AT zhangnan schedulingofbatchoperationforawastewatertreatmentplantundertimeofuseelectricitypricing AT liuyang schedulingofbatchoperationforawastewatertreatmentplantundertimeofuseelectricitypricing AT liguanghui schedulingofbatchoperationforawastewatertreatmentplantundertimeofuseelectricitypricing |