Cargando…
Research on the Audit Prediction Model of “Special Bonds + PPP” Project based on Machine Learning
This paper aims at the whole-process tracking audit problem of “special bonds + PPP” mode (hereinafter referred to as “special bonds + PPP”) in public infrastructure construction projects and establishes an audit evaluation prediction model based on the theory and method of machine learning. Firstly...
Autor principal: | Fang, Qianru |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Hindawi
2022
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9388285/ https://www.ncbi.nlm.nih.gov/pubmed/35990144 http://dx.doi.org/10.1155/2022/4174473 |
Ejemplares similares
-
Investors’ exit timing of PPP projects based on escalation of
commitment
por: Wang, Yinglin, et al.
Publicado: (2021) -
Intelligent Performance Evaluation of Urban Subway PPP Project Based on Deep Neural Network Model
por: Fan, Weizhi, et al.
Publicado: (2022) -
Retracted: Intelligent Performance Evaluation of Urban Subway PPP Project Based on Deep Neural Network Model
por: Neuroscience, Computational Intelligence and
Publicado: (2023) -
Metal–Metal Bonding Process Research Based on Xgboost Machine Learning Algorithm
por: Feng, Jingpeng, et al.
Publicado: (2023) -
Impact of the collaboration mechanism of PPP projects based on consumer participation: A system dynamics model of tripartite evolutionary game
por: Liu, Wei, et al.
Publicado: (2021)