Comparative Analysis of Emergency Planning Zone and Control Room Habitability for Potential Nuclear Reactor Deployment in Ghana
Following the recent surge in harnessing clean energy sources to fast-track carbon neutrality, renewable and nuclear energies have been the best-rated sources of clean energy. Even though renewable energy presents an almost insignificant risk to public health and the environment, they are insufficie...
Autores principales: | , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
MDPI
2022
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9517501/ https://www.ncbi.nlm.nih.gov/pubmed/36141467 http://dx.doi.org/10.3390/ijerph191811184 |
_version_ | 1784798958562836480 |
---|---|
author | Christina, Prah Kim, Juyoul |
author_facet | Christina, Prah Kim, Juyoul |
author_sort | Christina, Prah |
collection | PubMed |
description | Following the recent surge in harnessing clean energy sources to fast-track carbon neutrality, renewable and nuclear energies have been the best-rated sources of clean energy. Even though renewable energy presents an almost insignificant risk to public health and the environment, they are insufficient to support the growing demand for the high energy required for industrialization. Despite the competitive potential of nuclear energy to meet these demands, public concerns about its safety have significantly hindered its mass deployment in developing countries. Therefore, one of the primary considerations in commissioning a nuclear power plant is the establishment of emergency planning zones based on the reactor type and other siting criteria. Based on Ghana’s reactor type assessment (RTA), four reactor designs were considered in this study which are APR1400, HPR1000, VVER1200, and Nuscale Power Module. Using the NRC’s SNAP/RADTRAD and RASCAL codes, this research sought to investigate radionuclide doses released at the Exclusion Area Boundary (EAB), Low Population Zone (LPZ), Control room (CR), and the 16 km recommended public safe zone during Fuel handling Accidents (FHA), Rod Ejection Accident (REA), and Long-Term Station Blackout (LTSBO). The results revealed that reactors’ power contributed to the source term activities and offsite consequences during REA and LTSBO, while FHA was predominantly affected by the number of fuel assemblies and a fraction of damaged fuel. Additionally, the accidents considered in this study followed a similar trend of impact in decreasing order of reactor power and the number of fuel assemblies; APR1400 < VVER1200 < HPR1000 < Nuscale. Nevertheless, all the doses were within regulatory limits. |
format | Online Article Text |
id | pubmed-9517501 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2022 |
publisher | MDPI |
record_format | MEDLINE/PubMed |
spelling | pubmed-95175012022-09-29 Comparative Analysis of Emergency Planning Zone and Control Room Habitability for Potential Nuclear Reactor Deployment in Ghana Christina, Prah Kim, Juyoul Int J Environ Res Public Health Article Following the recent surge in harnessing clean energy sources to fast-track carbon neutrality, renewable and nuclear energies have been the best-rated sources of clean energy. Even though renewable energy presents an almost insignificant risk to public health and the environment, they are insufficient to support the growing demand for the high energy required for industrialization. Despite the competitive potential of nuclear energy to meet these demands, public concerns about its safety have significantly hindered its mass deployment in developing countries. Therefore, one of the primary considerations in commissioning a nuclear power plant is the establishment of emergency planning zones based on the reactor type and other siting criteria. Based on Ghana’s reactor type assessment (RTA), four reactor designs were considered in this study which are APR1400, HPR1000, VVER1200, and Nuscale Power Module. Using the NRC’s SNAP/RADTRAD and RASCAL codes, this research sought to investigate radionuclide doses released at the Exclusion Area Boundary (EAB), Low Population Zone (LPZ), Control room (CR), and the 16 km recommended public safe zone during Fuel handling Accidents (FHA), Rod Ejection Accident (REA), and Long-Term Station Blackout (LTSBO). The results revealed that reactors’ power contributed to the source term activities and offsite consequences during REA and LTSBO, while FHA was predominantly affected by the number of fuel assemblies and a fraction of damaged fuel. Additionally, the accidents considered in this study followed a similar trend of impact in decreasing order of reactor power and the number of fuel assemblies; APR1400 < VVER1200 < HPR1000 < Nuscale. Nevertheless, all the doses were within regulatory limits. MDPI 2022-09-06 /pmc/articles/PMC9517501/ /pubmed/36141467 http://dx.doi.org/10.3390/ijerph191811184 Text en © 2022 by the authors. https://creativecommons.org/licenses/by/4.0/Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). |
spellingShingle | Article Christina, Prah Kim, Juyoul Comparative Analysis of Emergency Planning Zone and Control Room Habitability for Potential Nuclear Reactor Deployment in Ghana |
title | Comparative Analysis of Emergency Planning Zone and Control Room Habitability for Potential Nuclear Reactor Deployment in Ghana |
title_full | Comparative Analysis of Emergency Planning Zone and Control Room Habitability for Potential Nuclear Reactor Deployment in Ghana |
title_fullStr | Comparative Analysis of Emergency Planning Zone and Control Room Habitability for Potential Nuclear Reactor Deployment in Ghana |
title_full_unstemmed | Comparative Analysis of Emergency Planning Zone and Control Room Habitability for Potential Nuclear Reactor Deployment in Ghana |
title_short | Comparative Analysis of Emergency Planning Zone and Control Room Habitability for Potential Nuclear Reactor Deployment in Ghana |
title_sort | comparative analysis of emergency planning zone and control room habitability for potential nuclear reactor deployment in ghana |
topic | Article |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9517501/ https://www.ncbi.nlm.nih.gov/pubmed/36141467 http://dx.doi.org/10.3390/ijerph191811184 |
work_keys_str_mv | AT christinaprah comparativeanalysisofemergencyplanningzoneandcontrolroomhabitabilityforpotentialnuclearreactordeploymentinghana AT kimjuyoul comparativeanalysisofemergencyplanningzoneandcontrolroomhabitabilityforpotentialnuclearreactordeploymentinghana |