Cargando…
A solution for the rational dispatching of concrete transport vehicles
The amount of concrete needed in the construction of projects is enormous. The concrete dispatching in construction is, however, chaotic and causes grievous waste due to the tight construction schedule, heavy tasks, and improper transport vehicle dispatching by the constructor. This paper proposes a...
Autores principales: | , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Nature Publishing Group UK
2022
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9537241/ https://www.ncbi.nlm.nih.gov/pubmed/36202889 http://dx.doi.org/10.1038/s41598-022-21011-y |
_version_ | 1784803155429556224 |
---|---|
author | Guo, Zhi-guang Liu, Yong-fu Ao, Chang-jiang |
author_facet | Guo, Zhi-guang Liu, Yong-fu Ao, Chang-jiang |
author_sort | Guo, Zhi-guang |
collection | PubMed |
description | The amount of concrete needed in the construction of projects is enormous. The concrete dispatching in construction is, however, chaotic and causes grievous waste due to the tight construction schedule, heavy tasks, and improper transport vehicle dispatching by the constructor. This paper proposes a more realistic objective function in the vehicle dispatching algorithm and offers a solution to the rational dispatching of concrete transport vehicles. The analysis of the calculation example validates the feasibility of the built model, which provides more appropriate dispatching and more balanced distribution, meets the needs of the worksite and mixing station to the greatest extent and improves the level of project refinement and process management. Therefore, the model is worth promoting in future practice. |
format | Online Article Text |
id | pubmed-9537241 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2022 |
publisher | Nature Publishing Group UK |
record_format | MEDLINE/PubMed |
spelling | pubmed-95372412022-10-08 A solution for the rational dispatching of concrete transport vehicles Guo, Zhi-guang Liu, Yong-fu Ao, Chang-jiang Sci Rep Article The amount of concrete needed in the construction of projects is enormous. The concrete dispatching in construction is, however, chaotic and causes grievous waste due to the tight construction schedule, heavy tasks, and improper transport vehicle dispatching by the constructor. This paper proposes a more realistic objective function in the vehicle dispatching algorithm and offers a solution to the rational dispatching of concrete transport vehicles. The analysis of the calculation example validates the feasibility of the built model, which provides more appropriate dispatching and more balanced distribution, meets the needs of the worksite and mixing station to the greatest extent and improves the level of project refinement and process management. Therefore, the model is worth promoting in future practice. Nature Publishing Group UK 2022-10-06 /pmc/articles/PMC9537241/ /pubmed/36202889 http://dx.doi.org/10.1038/s41598-022-21011-y Text en © The Author(s) 2022 https://creativecommons.org/licenses/by/4.0/Open Access This article is licensed under a Creative Commons Attribution 4.0 International License, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons licence, and indicate if changes were made. The images or other third party material in this article are included in the article's Creative Commons licence, unless indicated otherwise in a credit line to the material. If material is not included in the article's Creative Commons licence and your intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain permission directly from the copyright holder. To view a copy of this licence, visit http://creativecommons.org/licenses/by/4.0/ (https://creativecommons.org/licenses/by/4.0/) . |
spellingShingle | Article Guo, Zhi-guang Liu, Yong-fu Ao, Chang-jiang A solution for the rational dispatching of concrete transport vehicles |
title | A solution for the rational dispatching of concrete transport vehicles |
title_full | A solution for the rational dispatching of concrete transport vehicles |
title_fullStr | A solution for the rational dispatching of concrete transport vehicles |
title_full_unstemmed | A solution for the rational dispatching of concrete transport vehicles |
title_short | A solution for the rational dispatching of concrete transport vehicles |
title_sort | solution for the rational dispatching of concrete transport vehicles |
topic | Article |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9537241/ https://www.ncbi.nlm.nih.gov/pubmed/36202889 http://dx.doi.org/10.1038/s41598-022-21011-y |
work_keys_str_mv | AT guozhiguang asolutionfortherationaldispatchingofconcretetransportvehicles AT liuyongfu asolutionfortherationaldispatchingofconcretetransportvehicles AT aochangjiang asolutionfortherationaldispatchingofconcretetransportvehicles AT guozhiguang solutionfortherationaldispatchingofconcretetransportvehicles AT liuyongfu solutionfortherationaldispatchingofconcretetransportvehicles AT aochangjiang solutionfortherationaldispatchingofconcretetransportvehicles |