Cargando…
Negotiating Priorities on the Shopfloor: A Design Case Study of Maintainers’ Practices
The coordination of maintenance work in manufacturing poses a crucial productivity factor in small and medium-sized companies (SMEs) but often seems to be rather neglected in practice as well as in much of the literature on maintenance. We shed light upon maintenance coordination work by presenting...
Autores principales: | , , , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Springer Netherlands
2022
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9568935/ https://www.ncbi.nlm.nih.gov/pubmed/36267227 http://dx.doi.org/10.1007/s10606-022-09444-5 |
_version_ | 1784809753573064704 |
---|---|
author | Kotthaus, Christoph Vitt, Nico Krüger, Max Pipek, Volkmar Wulf, Volker |
author_facet | Kotthaus, Christoph Vitt, Nico Krüger, Max Pipek, Volkmar Wulf, Volker |
author_sort | Kotthaus, Christoph |
collection | PubMed |
description | The coordination of maintenance work in manufacturing poses a crucial productivity factor in small and medium-sized companies (SMEs) but often seems to be rather neglected in practice as well as in much of the literature on maintenance. We shed light upon maintenance coordination work by presenting a design case study conducted in an SME over approximately two years. We took a participatory design-oriented approach, involving all roles on the shopfloor affected by maintenance work. In three major iterations during the pre-study, a release-ready prototype was developed and implemented by the users over the course of one year. The evaluation of the tool showed how a new and mostly unintended practice of information flow, error reporting, and prioritization emerged such that, for instance, foremen becoming a central node of communication, formal prioritization shifting away from higher management, and actual prioritization being done by maintainers. This paper contributes to the body of CSCW work on maintenance practice in SMEs by presenting detailed empirical findings on the coordination work of maintainers, as well as the evaluation of socio-technical interventions into maintenance practices. |
format | Online Article Text |
id | pubmed-9568935 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2022 |
publisher | Springer Netherlands |
record_format | MEDLINE/PubMed |
spelling | pubmed-95689352022-10-16 Negotiating Priorities on the Shopfloor: A Design Case Study of Maintainers’ Practices Kotthaus, Christoph Vitt, Nico Krüger, Max Pipek, Volkmar Wulf, Volker Comput Support Coop Work Research Article The coordination of maintenance work in manufacturing poses a crucial productivity factor in small and medium-sized companies (SMEs) but often seems to be rather neglected in practice as well as in much of the literature on maintenance. We shed light upon maintenance coordination work by presenting a design case study conducted in an SME over approximately two years. We took a participatory design-oriented approach, involving all roles on the shopfloor affected by maintenance work. In three major iterations during the pre-study, a release-ready prototype was developed and implemented by the users over the course of one year. The evaluation of the tool showed how a new and mostly unintended practice of information flow, error reporting, and prioritization emerged such that, for instance, foremen becoming a central node of communication, formal prioritization shifting away from higher management, and actual prioritization being done by maintainers. This paper contributes to the body of CSCW work on maintenance practice in SMEs by presenting detailed empirical findings on the coordination work of maintainers, as well as the evaluation of socio-technical interventions into maintenance practices. Springer Netherlands 2022-10-15 2023 /pmc/articles/PMC9568935/ /pubmed/36267227 http://dx.doi.org/10.1007/s10606-022-09444-5 Text en © The Author(s) 2022 https://creativecommons.org/licenses/by/4.0/Open AccessThis article is licensed under a Creative Commons Attribution 4.0 International License, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons licence, and indicate if changes were made. The images or other third party material in this article are included in the article's Creative Commons licence, unless indicated otherwise in a credit line to the material. If material is not included in the article's Creative Commons licence and your intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain permission directly from the copyright holder. To view a copy of this licence, visit http://creativecommons.org/licenses/by/4.0/ (https://creativecommons.org/licenses/by/4.0/) . |
spellingShingle | Research Article Kotthaus, Christoph Vitt, Nico Krüger, Max Pipek, Volkmar Wulf, Volker Negotiating Priorities on the Shopfloor: A Design Case Study of Maintainers’ Practices |
title | Negotiating Priorities on the Shopfloor: A Design Case Study of Maintainers’ Practices |
title_full | Negotiating Priorities on the Shopfloor: A Design Case Study of Maintainers’ Practices |
title_fullStr | Negotiating Priorities on the Shopfloor: A Design Case Study of Maintainers’ Practices |
title_full_unstemmed | Negotiating Priorities on the Shopfloor: A Design Case Study of Maintainers’ Practices |
title_short | Negotiating Priorities on the Shopfloor: A Design Case Study of Maintainers’ Practices |
title_sort | negotiating priorities on the shopfloor: a design case study of maintainers’ practices |
topic | Research Article |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9568935/ https://www.ncbi.nlm.nih.gov/pubmed/36267227 http://dx.doi.org/10.1007/s10606-022-09444-5 |
work_keys_str_mv | AT kotthauschristoph negotiatingprioritiesontheshopflooradesigncasestudyofmaintainerspractices AT vittnico negotiatingprioritiesontheshopflooradesigncasestudyofmaintainerspractices AT krugermax negotiatingprioritiesontheshopflooradesigncasestudyofmaintainerspractices AT pipekvolkmar negotiatingprioritiesontheshopflooradesigncasestudyofmaintainerspractices AT wulfvolker negotiatingprioritiesontheshopflooradesigncasestudyofmaintainerspractices |