Cargando…

The damage and reconstruction of the Kumamoto earthquake: an analysis on the impact of changes in expenditures with multi-regional input–output table for Kumamoto Prefecture

The Kumamoto earthquake which occurred in April 2016 measured twice the maximum seismic intensity of 7, causing serious damage to the Kumamoto Prefecture. This study mainly focuses on the demand side of expenditures, estimating the monthly expenditures for 1 year before and after the earthquake. The...

Descripción completa

Detalles Bibliográficos
Autores principales: Takeda, Kenta, Inaba, Kazuo
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Springer Berlin Heidelberg 2022
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9579579/
https://www.ncbi.nlm.nih.gov/pubmed/36276171
http://dx.doi.org/10.1186/s40008-022-00276-6
_version_ 1784812211738247168
author Takeda, Kenta
Inaba, Kazuo
author_facet Takeda, Kenta
Inaba, Kazuo
author_sort Takeda, Kenta
collection PubMed
description The Kumamoto earthquake which occurred in April 2016 measured twice the maximum seismic intensity of 7, causing serious damage to the Kumamoto Prefecture. This study mainly focuses on the demand side of expenditures, estimating the monthly expenditures for 1 year before and after the earthquake. Then, using the multi-regional input–output table for Kumamoto Prefecture, we analyzes the ripple effects by region of the changes in monthly expenditures due to the earthquake. Expenditures in the prefecture in fiscal year 2016 by month decreased by a cumulative total of 592 billion yen because of the earthquake, which generated a value-added loss of 348 billion yen. On the other hand, expenditures increased by a cumulative total of 648 billion yen caused by reconstruction demand, inducing 375 billion yen in value-added gains. Thus, net increase of the value-added of 27 billion yen occupied 10.9% of net increase of the gross prefectural domestic product between fiscal years 2015–2016. The fluctuation of expenditures, induced production, and induced value-added caused by the earthquake is huge. Although the damage to the prefectural economy was severe, reconstruction demand exceeded it, resulting in a quick recovery. However, at the same time, there was a confirmed delay in restoration in industries that were almost unrelated to reconstruction and in regions with a heavy concentration of damage.
format Online
Article
Text
id pubmed-9579579
institution National Center for Biotechnology Information
language English
publishDate 2022
publisher Springer Berlin Heidelberg
record_format MEDLINE/PubMed
spelling pubmed-95795792022-10-19 The damage and reconstruction of the Kumamoto earthquake: an analysis on the impact of changes in expenditures with multi-regional input–output table for Kumamoto Prefecture Takeda, Kenta Inaba, Kazuo J Econ Struct Research The Kumamoto earthquake which occurred in April 2016 measured twice the maximum seismic intensity of 7, causing serious damage to the Kumamoto Prefecture. This study mainly focuses on the demand side of expenditures, estimating the monthly expenditures for 1 year before and after the earthquake. Then, using the multi-regional input–output table for Kumamoto Prefecture, we analyzes the ripple effects by region of the changes in monthly expenditures due to the earthquake. Expenditures in the prefecture in fiscal year 2016 by month decreased by a cumulative total of 592 billion yen because of the earthquake, which generated a value-added loss of 348 billion yen. On the other hand, expenditures increased by a cumulative total of 648 billion yen caused by reconstruction demand, inducing 375 billion yen in value-added gains. Thus, net increase of the value-added of 27 billion yen occupied 10.9% of net increase of the gross prefectural domestic product between fiscal years 2015–2016. The fluctuation of expenditures, induced production, and induced value-added caused by the earthquake is huge. Although the damage to the prefectural economy was severe, reconstruction demand exceeded it, resulting in a quick recovery. However, at the same time, there was a confirmed delay in restoration in industries that were almost unrelated to reconstruction and in regions with a heavy concentration of damage. Springer Berlin Heidelberg 2022-10-18 2022 /pmc/articles/PMC9579579/ /pubmed/36276171 http://dx.doi.org/10.1186/s40008-022-00276-6 Text en © The Author(s) 2022 https://creativecommons.org/licenses/by/4.0/Open AccessThis article is licensed under a Creative Commons Attribution 4.0 International License, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons licence, and indicate if changes were made. The images or other third party material in this article are included in the article's Creative Commons licence, unless indicated otherwise in a credit line to the material. If material is not included in the article's Creative Commons licence and your intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain permission directly from the copyright holder. To view a copy of this licence, visit http://creativecommons.org/licenses/by/4.0/ (https://creativecommons.org/licenses/by/4.0/) .
spellingShingle Research
Takeda, Kenta
Inaba, Kazuo
The damage and reconstruction of the Kumamoto earthquake: an analysis on the impact of changes in expenditures with multi-regional input–output table for Kumamoto Prefecture
title The damage and reconstruction of the Kumamoto earthquake: an analysis on the impact of changes in expenditures with multi-regional input–output table for Kumamoto Prefecture
title_full The damage and reconstruction of the Kumamoto earthquake: an analysis on the impact of changes in expenditures with multi-regional input–output table for Kumamoto Prefecture
title_fullStr The damage and reconstruction of the Kumamoto earthquake: an analysis on the impact of changes in expenditures with multi-regional input–output table for Kumamoto Prefecture
title_full_unstemmed The damage and reconstruction of the Kumamoto earthquake: an analysis on the impact of changes in expenditures with multi-regional input–output table for Kumamoto Prefecture
title_short The damage and reconstruction of the Kumamoto earthquake: an analysis on the impact of changes in expenditures with multi-regional input–output table for Kumamoto Prefecture
title_sort damage and reconstruction of the kumamoto earthquake: an analysis on the impact of changes in expenditures with multi-regional input–output table for kumamoto prefecture
topic Research
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9579579/
https://www.ncbi.nlm.nih.gov/pubmed/36276171
http://dx.doi.org/10.1186/s40008-022-00276-6
work_keys_str_mv AT takedakenta thedamageandreconstructionofthekumamotoearthquakeananalysisontheimpactofchangesinexpenditureswithmultiregionalinputoutputtableforkumamotoprefecture
AT inabakazuo thedamageandreconstructionofthekumamotoearthquakeananalysisontheimpactofchangesinexpenditureswithmultiregionalinputoutputtableforkumamotoprefecture
AT takedakenta damageandreconstructionofthekumamotoearthquakeananalysisontheimpactofchangesinexpenditureswithmultiregionalinputoutputtableforkumamotoprefecture
AT inabakazuo damageandreconstructionofthekumamotoearthquakeananalysisontheimpactofchangesinexpenditureswithmultiregionalinputoutputtableforkumamotoprefecture