Cargando…
Proposal for the Integration of the Assessment and Management of Electrical Risk from Overhead Power Lines in BIM for Road Projects
Electrical risk has a particular impact within the construction sector. This leads to the development of regulations to mitigate it, but correct application of regulations is impossible with a traditional 2D analysis. The construction sector is using technologies from the industrial sector (Construc...
Autores principales: | , , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
MDPI
2022
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9602516/ https://www.ncbi.nlm.nih.gov/pubmed/36293644 http://dx.doi.org/10.3390/ijerph192013064 |
_version_ | 1784817337502793728 |
---|---|
author | Collado-Mariscal, Darío Cortés-Pérez, Juan Pedro Cortés-Pérez, Alfonso Cuevas-Murillo, Antonia |
author_facet | Collado-Mariscal, Darío Cortés-Pérez, Juan Pedro Cortés-Pérez, Alfonso Cuevas-Murillo, Antonia |
author_sort | Collado-Mariscal, Darío |
collection | PubMed |
description | Electrical risk has a particular impact within the construction sector. This leads to the development of regulations to mitigate it, but correct application of regulations is impossible with a traditional 2D analysis. The construction sector is using technologies from the industrial sector (Construction 4.0), with BIM as the main enabling technology. Thus, the objective of this article is the evaluation of the risk produced by Overhead Power Lines (OPL) through BIM integration. The OPL, its risk zones, the affected road, and the envelope resulting from the geometry of the necessary machines to build it were digitized, converging in a single model to perform a 4D risk analysis. The risks of the execution of the embankment and road surface of a road section passing through an OPL were analyzed by means of the collision of the envelope with its risk zones, resulting in an integration of their evaluation, to which was added the introduction of preventive measures and their re-evaluation. The parametric 3D modelling allowed a better definition of the risk zones and the BIM management minimized errors, providing traceability of decisions from the design phase, complying with health and safety regulations and applying the principle of Prevention through Design (PtD). |
format | Online Article Text |
id | pubmed-9602516 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2022 |
publisher | MDPI |
record_format | MEDLINE/PubMed |
spelling | pubmed-96025162022-10-27 Proposal for the Integration of the Assessment and Management of Electrical Risk from Overhead Power Lines in BIM for Road Projects Collado-Mariscal, Darío Cortés-Pérez, Juan Pedro Cortés-Pérez, Alfonso Cuevas-Murillo, Antonia Int J Environ Res Public Health Article Electrical risk has a particular impact within the construction sector. This leads to the development of regulations to mitigate it, but correct application of regulations is impossible with a traditional 2D analysis. The construction sector is using technologies from the industrial sector (Construction 4.0), with BIM as the main enabling technology. Thus, the objective of this article is the evaluation of the risk produced by Overhead Power Lines (OPL) through BIM integration. The OPL, its risk zones, the affected road, and the envelope resulting from the geometry of the necessary machines to build it were digitized, converging in a single model to perform a 4D risk analysis. The risks of the execution of the embankment and road surface of a road section passing through an OPL were analyzed by means of the collision of the envelope with its risk zones, resulting in an integration of their evaluation, to which was added the introduction of preventive measures and their re-evaluation. The parametric 3D modelling allowed a better definition of the risk zones and the BIM management minimized errors, providing traceability of decisions from the design phase, complying with health and safety regulations and applying the principle of Prevention through Design (PtD). MDPI 2022-10-11 /pmc/articles/PMC9602516/ /pubmed/36293644 http://dx.doi.org/10.3390/ijerph192013064 Text en © 2022 by the authors. https://creativecommons.org/licenses/by/4.0/Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/). |
spellingShingle | Article Collado-Mariscal, Darío Cortés-Pérez, Juan Pedro Cortés-Pérez, Alfonso Cuevas-Murillo, Antonia Proposal for the Integration of the Assessment and Management of Electrical Risk from Overhead Power Lines in BIM for Road Projects |
title | Proposal for the Integration of the Assessment and Management of Electrical Risk from Overhead Power Lines in BIM for Road Projects |
title_full | Proposal for the Integration of the Assessment and Management of Electrical Risk from Overhead Power Lines in BIM for Road Projects |
title_fullStr | Proposal for the Integration of the Assessment and Management of Electrical Risk from Overhead Power Lines in BIM for Road Projects |
title_full_unstemmed | Proposal for the Integration of the Assessment and Management of Electrical Risk from Overhead Power Lines in BIM for Road Projects |
title_short | Proposal for the Integration of the Assessment and Management of Electrical Risk from Overhead Power Lines in BIM for Road Projects |
title_sort | proposal for the integration of the assessment and management of electrical risk from overhead power lines in bim for road projects |
topic | Article |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9602516/ https://www.ncbi.nlm.nih.gov/pubmed/36293644 http://dx.doi.org/10.3390/ijerph192013064 |
work_keys_str_mv | AT colladomariscaldario proposalfortheintegrationoftheassessmentandmanagementofelectricalriskfromoverheadpowerlinesinbimforroadprojects AT cortesperezjuanpedro proposalfortheintegrationoftheassessmentandmanagementofelectricalriskfromoverheadpowerlinesinbimforroadprojects AT cortesperezalfonso proposalfortheintegrationoftheassessmentandmanagementofelectricalriskfromoverheadpowerlinesinbimforroadprojects AT cuevasmurilloantonia proposalfortheintegrationoftheassessmentandmanagementofelectricalriskfromoverheadpowerlinesinbimforroadprojects |