Proposal for the Integration of the Assessment and Management of Electrical Risk from Overhead Power Lines in BIM for Road Projects

Electrical risk has a particular impact within the construction sector. This leads to the development of regulations to mitigate it, but correct application of regulations is impossible with a traditional 2D analysis. The construction sector is using technologies from the industrial sector (Construc...

Descripción completa

Detalles Bibliográficos
Autores principales: Collado-Mariscal, Darío, Cortés-Pérez, Juan Pedro, Cortés-Pérez, Alfonso, Cuevas-Murillo, Antonia
Formato: Online Artículo Texto
Lenguaje:English
Publicado: MDPI 2022
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9602516/
https://www.ncbi.nlm.nih.gov/pubmed/36293644
http://dx.doi.org/10.3390/ijerph192013064
_version_ 1784817337502793728
author Collado-Mariscal, Darío
Cortés-Pérez, Juan Pedro
Cortés-Pérez, Alfonso
Cuevas-Murillo, Antonia
author_facet Collado-Mariscal, Darío
Cortés-Pérez, Juan Pedro
Cortés-Pérez, Alfonso
Cuevas-Murillo, Antonia
author_sort Collado-Mariscal, Darío
collection PubMed
description Electrical risk has a particular impact within the construction sector. This leads to the development of regulations to mitigate it, but correct application of regulations is impossible with a traditional 2D analysis. The construction sector is using technologies from the industrial sector (Construction 4.0), with BIM as the main enabling technology. Thus, the objective of this article is the evaluation of the risk produced by Overhead Power Lines (OPL) through BIM integration. The OPL, its risk zones, the affected road, and the envelope resulting from the geometry of the necessary machines to build it were digitized, converging in a single model to perform a 4D risk analysis. The risks of the execution of the embankment and road surface of a road section passing through an OPL were analyzed by means of the collision of the envelope with its risk zones, resulting in an integration of their evaluation, to which was added the introduction of preventive measures and their re-evaluation. The parametric 3D modelling allowed a better definition of the risk zones and the BIM management minimized errors, providing traceability of decisions from the design phase, complying with health and safety regulations and applying the principle of Prevention through Design (PtD).
format Online
Article
Text
id pubmed-9602516
institution National Center for Biotechnology Information
language English
publishDate 2022
publisher MDPI
record_format MEDLINE/PubMed
spelling pubmed-96025162022-10-27 Proposal for the Integration of the Assessment and Management of Electrical Risk from Overhead Power Lines in BIM for Road Projects Collado-Mariscal, Darío Cortés-Pérez, Juan Pedro Cortés-Pérez, Alfonso Cuevas-Murillo, Antonia Int J Environ Res Public Health Article Electrical risk has a particular impact within the construction sector. This leads to the development of regulations to mitigate it, but correct application of regulations is impossible with a traditional 2D analysis. The construction sector is using technologies from the industrial sector (Construction 4.0), with BIM as the main enabling technology. Thus, the objective of this article is the evaluation of the risk produced by Overhead Power Lines (OPL) through BIM integration. The OPL, its risk zones, the affected road, and the envelope resulting from the geometry of the necessary machines to build it were digitized, converging in a single model to perform a 4D risk analysis. The risks of the execution of the embankment and road surface of a road section passing through an OPL were analyzed by means of the collision of the envelope with its risk zones, resulting in an integration of their evaluation, to which was added the introduction of preventive measures and their re-evaluation. The parametric 3D modelling allowed a better definition of the risk zones and the BIM management minimized errors, providing traceability of decisions from the design phase, complying with health and safety regulations and applying the principle of Prevention through Design (PtD). MDPI 2022-10-11 /pmc/articles/PMC9602516/ /pubmed/36293644 http://dx.doi.org/10.3390/ijerph192013064 Text en © 2022 by the authors. https://creativecommons.org/licenses/by/4.0/Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/).
spellingShingle Article
Collado-Mariscal, Darío
Cortés-Pérez, Juan Pedro
Cortés-Pérez, Alfonso
Cuevas-Murillo, Antonia
Proposal for the Integration of the Assessment and Management of Electrical Risk from Overhead Power Lines in BIM for Road Projects
title Proposal for the Integration of the Assessment and Management of Electrical Risk from Overhead Power Lines in BIM for Road Projects
title_full Proposal for the Integration of the Assessment and Management of Electrical Risk from Overhead Power Lines in BIM for Road Projects
title_fullStr Proposal for the Integration of the Assessment and Management of Electrical Risk from Overhead Power Lines in BIM for Road Projects
title_full_unstemmed Proposal for the Integration of the Assessment and Management of Electrical Risk from Overhead Power Lines in BIM for Road Projects
title_short Proposal for the Integration of the Assessment and Management of Electrical Risk from Overhead Power Lines in BIM for Road Projects
title_sort proposal for the integration of the assessment and management of electrical risk from overhead power lines in bim for road projects
topic Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9602516/
https://www.ncbi.nlm.nih.gov/pubmed/36293644
http://dx.doi.org/10.3390/ijerph192013064
work_keys_str_mv AT colladomariscaldario proposalfortheintegrationoftheassessmentandmanagementofelectricalriskfromoverheadpowerlinesinbimforroadprojects
AT cortesperezjuanpedro proposalfortheintegrationoftheassessmentandmanagementofelectricalriskfromoverheadpowerlinesinbimforroadprojects
AT cortesperezalfonso proposalfortheintegrationoftheassessmentandmanagementofelectricalriskfromoverheadpowerlinesinbimforroadprojects
AT cuevasmurilloantonia proposalfortheintegrationoftheassessmentandmanagementofelectricalriskfromoverheadpowerlinesinbimforroadprojects