Proposal for the Integration of the Assessment and Management of Electrical Risk from Overhead Power Lines in BIM for Road Projects
Electrical risk has a particular impact within the construction sector. This leads to the development of regulations to mitigate it, but correct application of regulations is impossible with a traditional 2D analysis. The construction sector is using technologies from the industrial sector (Construc...
Autores principales: | Collado-Mariscal, Darío, Cortés-Pérez, Juan Pedro, Cortés-Pérez, Alfonso, Cuevas-Murillo, Antonia |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
MDPI
2022
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9602516/ https://www.ncbi.nlm.nih.gov/pubmed/36293644 http://dx.doi.org/10.3390/ijerph192013064 |
Ejemplares similares
-
Overhead power lines: planning, design, construction
por: Kiessling, Friedrich, et al.
Publicado: (2003) -
Overhead lines
por: Papailiou, Konstantin
Publicado: (2017) -
Atmospheric Sensors and Energy Harvesters on Overhead Power Lines
por: White, Richard M., et al.
Publicado: (2018) -
Proposal for the award of a contract for the replacement of electrical overhead travelling cranes at CERN
Publicado: (2011) -
Proposal for the award of a contract for the refurbishment of electrical overhead travelling cranes at CERN
Publicado: (2011)