Cargando…

Robust Operating Room Scheduling Model with Violation Probability Consideration under Uncertain Surgery Duration

This paper proposes an operating room (OR) scheduling model to assign a group of next-day patients to ORs while adhering to OR availability, priorities, and OR overtime constraints. Existing studies usually consider OR scheduling problems by ignoring the influence of uncertainties in surgery duratio...

Descripción completa

Detalles Bibliográficos
Autores principales: Ma, Yanbo, Liu, Kaiyue, Li, Zheng, Chen, Xiang
Formato: Online Artículo Texto
Lenguaje:English
Publicado: MDPI 2022
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9602645/
https://www.ncbi.nlm.nih.gov/pubmed/36294285
http://dx.doi.org/10.3390/ijerph192013685
_version_ 1784817370173276160
author Ma, Yanbo
Liu, Kaiyue
Li, Zheng
Chen, Xiang
author_facet Ma, Yanbo
Liu, Kaiyue
Li, Zheng
Chen, Xiang
author_sort Ma, Yanbo
collection PubMed
description This paper proposes an operating room (OR) scheduling model to assign a group of next-day patients to ORs while adhering to OR availability, priorities, and OR overtime constraints. Existing studies usually consider OR scheduling problems by ignoring the influence of uncertainties in surgery durations on the OR assignment. In this paper, we address this issue by formulating accurate patient waiting times as the cumulative sum of uncertain surgery durations from the robust discrete approach point of view. Specifically, by considering the patients’ uncertain surgery duration, we formulate the robust OR scheduling model to minimize the sum of the fixed OR opening cost, the patient waiting penalty cost, and the OR overtime cost. Then, we adopt the box uncertainty set to specify the uncertain surgery duration, and a robustness coefficient is introduced to control the robustness of the model. This resulting robust model is essentially intractable in its original form because there are uncertain variables in both the objective function and constraint. To make this model solvable, we then transform it into a Mixed Integer Linear Programming (MILP) model by employing the robust discrete optimization theory and the strong dual theory. Moreover, to evaluate the reliability of the robust OR scheduling model under different robustness coefficients, we theoretically analyze the constraint violation probability associated with overtime constraints. Finally, an in-depth numerical analysis is conducted to verify the proposed model’s effectiveness and to evaluate the robustness coefficient’s impact on the model performance. Our analytical results indicate the following: (1) With the robustness coefficient, we obtain the tradeoff relationship between the total management cost and the constraint violation probability, i.e., a smaller robustness coefficient yields remarkably lower total management cost at the expense of a noticeably higher constraint violation probability and vice versa. (2) The obtained total management cost is sensitive to small robustness coefficient values, but it hardly changes as the robustness coefficient increases to a specific value. (3) The obtained total management cost becomes increasingly sensitive to the perturbation factor with the decrease in constraint violation probability.
format Online
Article
Text
id pubmed-9602645
institution National Center for Biotechnology Information
language English
publishDate 2022
publisher MDPI
record_format MEDLINE/PubMed
spelling pubmed-96026452022-10-27 Robust Operating Room Scheduling Model with Violation Probability Consideration under Uncertain Surgery Duration Ma, Yanbo Liu, Kaiyue Li, Zheng Chen, Xiang Int J Environ Res Public Health Article This paper proposes an operating room (OR) scheduling model to assign a group of next-day patients to ORs while adhering to OR availability, priorities, and OR overtime constraints. Existing studies usually consider OR scheduling problems by ignoring the influence of uncertainties in surgery durations on the OR assignment. In this paper, we address this issue by formulating accurate patient waiting times as the cumulative sum of uncertain surgery durations from the robust discrete approach point of view. Specifically, by considering the patients’ uncertain surgery duration, we formulate the robust OR scheduling model to minimize the sum of the fixed OR opening cost, the patient waiting penalty cost, and the OR overtime cost. Then, we adopt the box uncertainty set to specify the uncertain surgery duration, and a robustness coefficient is introduced to control the robustness of the model. This resulting robust model is essentially intractable in its original form because there are uncertain variables in both the objective function and constraint. To make this model solvable, we then transform it into a Mixed Integer Linear Programming (MILP) model by employing the robust discrete optimization theory and the strong dual theory. Moreover, to evaluate the reliability of the robust OR scheduling model under different robustness coefficients, we theoretically analyze the constraint violation probability associated with overtime constraints. Finally, an in-depth numerical analysis is conducted to verify the proposed model’s effectiveness and to evaluate the robustness coefficient’s impact on the model performance. Our analytical results indicate the following: (1) With the robustness coefficient, we obtain the tradeoff relationship between the total management cost and the constraint violation probability, i.e., a smaller robustness coefficient yields remarkably lower total management cost at the expense of a noticeably higher constraint violation probability and vice versa. (2) The obtained total management cost is sensitive to small robustness coefficient values, but it hardly changes as the robustness coefficient increases to a specific value. (3) The obtained total management cost becomes increasingly sensitive to the perturbation factor with the decrease in constraint violation probability. MDPI 2022-10-21 /pmc/articles/PMC9602645/ /pubmed/36294285 http://dx.doi.org/10.3390/ijerph192013685 Text en © 2022 by the authors. https://creativecommons.org/licenses/by/4.0/Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/).
spellingShingle Article
Ma, Yanbo
Liu, Kaiyue
Li, Zheng
Chen, Xiang
Robust Operating Room Scheduling Model with Violation Probability Consideration under Uncertain Surgery Duration
title Robust Operating Room Scheduling Model with Violation Probability Consideration under Uncertain Surgery Duration
title_full Robust Operating Room Scheduling Model with Violation Probability Consideration under Uncertain Surgery Duration
title_fullStr Robust Operating Room Scheduling Model with Violation Probability Consideration under Uncertain Surgery Duration
title_full_unstemmed Robust Operating Room Scheduling Model with Violation Probability Consideration under Uncertain Surgery Duration
title_short Robust Operating Room Scheduling Model with Violation Probability Consideration under Uncertain Surgery Duration
title_sort robust operating room scheduling model with violation probability consideration under uncertain surgery duration
topic Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9602645/
https://www.ncbi.nlm.nih.gov/pubmed/36294285
http://dx.doi.org/10.3390/ijerph192013685
work_keys_str_mv AT mayanbo robustoperatingroomschedulingmodelwithviolationprobabilityconsiderationunderuncertainsurgeryduration
AT liukaiyue robustoperatingroomschedulingmodelwithviolationprobabilityconsiderationunderuncertainsurgeryduration
AT lizheng robustoperatingroomschedulingmodelwithviolationprobabilityconsiderationunderuncertainsurgeryduration
AT chenxiang robustoperatingroomschedulingmodelwithviolationprobabilityconsiderationunderuncertainsurgeryduration