Cargando…
Long-term monitoring and analysis of the longitudinal differential settlement of an expressway bridge–subgrade transition section in a loess area
To solve the problem of "bridgehead bumping" in the transition section between the road and bridge of an expressway in a collapsible loess area, a lime–soil compaction pile composite foundation is used for the first time in the transition section between the road and bridge of an expresswa...
Autores principales: | , , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Nature Publishing Group UK
2022
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9652310/ https://www.ncbi.nlm.nih.gov/pubmed/36369340 http://dx.doi.org/10.1038/s41598-022-23829-y |
_version_ | 1784828441458114560 |
---|---|
author | Du, Yang He, Xiongjun Wu, Chao Wu, Weiwei |
author_facet | Du, Yang He, Xiongjun Wu, Chao Wu, Weiwei |
author_sort | Du, Yang |
collection | PubMed |
description | To solve the problem of "bridgehead bumping" in the transition section between the road and bridge of an expressway in a collapsible loess area, a lime–soil compaction pile composite foundation is used for the first time in the transition section between the road and bridge of an expressway in China; the loess subgrade is improved by adding lime, and the subgrade is arranged in a multilayer geogrid for the joint treatment of various engineering measures. At the same time, a new type of precision differential pressure settlement meter is used to monitor the long-term settlement of a bridge–subgrade transition section with a small settlement magnitude after the joint treatment, and the distribution characteristics and variation laws of the settlement along the longitudinal direction of the line are obtained. The results show that the effect is better and the differential settlement is smaller when using a lime–soil compaction pile composite foundation; lime improves the loess subgrade backfill, and the multilayer geogrid addresses the bridge–subgrade transition in the collapsible loess area. The differential settlement and settlement rate of the subgrade and abutment increase with increased monitoring time, and the differential settlement increases gradually, while the growth rate decreases gradually and finally tends to be stable. The differential settlement of the transition section is predicted and analysed by using a hyperbolic curve, exponential curve and their combination in a prediction model, and the prediction analysis shows that the combined prediction model has the best prediction effect. These research results can provide guidance and reference for the design and construction of subgrade structures similar to the wet transition section between roads and bridges. |
format | Online Article Text |
id | pubmed-9652310 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2022 |
publisher | Nature Publishing Group UK |
record_format | MEDLINE/PubMed |
spelling | pubmed-96523102022-11-15 Long-term monitoring and analysis of the longitudinal differential settlement of an expressway bridge–subgrade transition section in a loess area Du, Yang He, Xiongjun Wu, Chao Wu, Weiwei Sci Rep Article To solve the problem of "bridgehead bumping" in the transition section between the road and bridge of an expressway in a collapsible loess area, a lime–soil compaction pile composite foundation is used for the first time in the transition section between the road and bridge of an expressway in China; the loess subgrade is improved by adding lime, and the subgrade is arranged in a multilayer geogrid for the joint treatment of various engineering measures. At the same time, a new type of precision differential pressure settlement meter is used to monitor the long-term settlement of a bridge–subgrade transition section with a small settlement magnitude after the joint treatment, and the distribution characteristics and variation laws of the settlement along the longitudinal direction of the line are obtained. The results show that the effect is better and the differential settlement is smaller when using a lime–soil compaction pile composite foundation; lime improves the loess subgrade backfill, and the multilayer geogrid addresses the bridge–subgrade transition in the collapsible loess area. The differential settlement and settlement rate of the subgrade and abutment increase with increased monitoring time, and the differential settlement increases gradually, while the growth rate decreases gradually and finally tends to be stable. The differential settlement of the transition section is predicted and analysed by using a hyperbolic curve, exponential curve and their combination in a prediction model, and the prediction analysis shows that the combined prediction model has the best prediction effect. These research results can provide guidance and reference for the design and construction of subgrade structures similar to the wet transition section between roads and bridges. Nature Publishing Group UK 2022-11-11 /pmc/articles/PMC9652310/ /pubmed/36369340 http://dx.doi.org/10.1038/s41598-022-23829-y Text en © The Author(s) 2022 https://creativecommons.org/licenses/by/4.0/Open Access This article is licensed under a Creative Commons Attribution 4.0 International License, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons licence, and indicate if changes were made. The images or other third party material in this article are included in the article's Creative Commons licence, unless indicated otherwise in a credit line to the material. If material is not included in the article's Creative Commons licence and your intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain permission directly from the copyright holder. To view a copy of this licence, visit http://creativecommons.org/licenses/by/4.0/ (https://creativecommons.org/licenses/by/4.0/) . |
spellingShingle | Article Du, Yang He, Xiongjun Wu, Chao Wu, Weiwei Long-term monitoring and analysis of the longitudinal differential settlement of an expressway bridge–subgrade transition section in a loess area |
title | Long-term monitoring and analysis of the longitudinal differential settlement of an expressway bridge–subgrade transition section in a loess area |
title_full | Long-term monitoring and analysis of the longitudinal differential settlement of an expressway bridge–subgrade transition section in a loess area |
title_fullStr | Long-term monitoring and analysis of the longitudinal differential settlement of an expressway bridge–subgrade transition section in a loess area |
title_full_unstemmed | Long-term monitoring and analysis of the longitudinal differential settlement of an expressway bridge–subgrade transition section in a loess area |
title_short | Long-term monitoring and analysis of the longitudinal differential settlement of an expressway bridge–subgrade transition section in a loess area |
title_sort | long-term monitoring and analysis of the longitudinal differential settlement of an expressway bridge–subgrade transition section in a loess area |
topic | Article |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9652310/ https://www.ncbi.nlm.nih.gov/pubmed/36369340 http://dx.doi.org/10.1038/s41598-022-23829-y |
work_keys_str_mv | AT duyang longtermmonitoringandanalysisofthelongitudinaldifferentialsettlementofanexpresswaybridgesubgradetransitionsectioninaloessarea AT hexiongjun longtermmonitoringandanalysisofthelongitudinaldifferentialsettlementofanexpresswaybridgesubgradetransitionsectioninaloessarea AT wuchao longtermmonitoringandanalysisofthelongitudinaldifferentialsettlementofanexpresswaybridgesubgradetransitionsectioninaloessarea AT wuweiwei longtermmonitoringandanalysisofthelongitudinaldifferentialsettlementofanexpresswaybridgesubgradetransitionsectioninaloessarea |