Cargando…
A gravimetric assessment of the Gotthard Base Tunnel geological model: insights from a novel gravity terrain-adaptation correction and rock physics data
The Gotthard Base Tunnel (GBT) is a 57 km long railway tunnel, constructed in the Central Alps in Switzerland and extending mainly North–South across numerous geological units. We acquired 80 new gravity data points at the surface along the GBT profile and used 77 gravity measurements in the tunnel...
Autores principales: | Scarponi, M., Hetényi, G., Baron, L., Marti, U. |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Springer International Publishing
2022
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9652475/ https://www.ncbi.nlm.nih.gov/pubmed/36397963 http://dx.doi.org/10.1186/s00015-022-00422-z |
Ejemplares similares
-
Gotthard tunnel project
por: AMBERG, Felix
Publicado: (2014) -
The Gotthard-II readout ASIC and detector system
por: Zhang, Jiaguo
Publicado: (2021) -
Data on prediction of geological characteristics during shield tunnelling in mixed soil and rock ground
por: Yan, Tao
Publicado: (2022) -
Structural geology of rocks and regions /
por: Davis, George H. (George Herbert), 1942-
Publicado: (1996) -
Evaluation of input geological parameters and tunnel strain for strain-softening rock mass based on GSI
por: Cui, Lan, et al.
Publicado: (2022)