Cargando…

Safety Risk Estimation of Construction Project Based on Energy Transfer Model and System Dynamics: A Case Study of Collapse Accident in China

Analyzing and understanding the occurrence and evolution mechanisms of construction accidents are important for construction safety management. This study proposed a hybrid approach of integrating the energy transfer model (ETM) and system dynamics (SD) theory to delineate the entire evolution stage...

Descripción completa

Detalles Bibliográficos
Autores principales: Zhang, Yongcheng, Xing, Xuejiao, Antwi-Afari, Maxwell Fordjour, Wu, Mingqing
Formato: Online Artículo Texto
Lenguaje:English
Publicado: MDPI 2022
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9656919/
https://www.ncbi.nlm.nih.gov/pubmed/36361263
http://dx.doi.org/10.3390/ijerph192114386
_version_ 1784829559714086912
author Zhang, Yongcheng
Xing, Xuejiao
Antwi-Afari, Maxwell Fordjour
Wu, Mingqing
author_facet Zhang, Yongcheng
Xing, Xuejiao
Antwi-Afari, Maxwell Fordjour
Wu, Mingqing
author_sort Zhang, Yongcheng
collection PubMed
description Analyzing and understanding the occurrence and evolution mechanisms of construction accidents are important for construction safety management. This study proposed a hybrid approach of integrating the energy transfer model (ETM) and system dynamics (SD) theory to delineate the entire evolution stage of the construction accident. Specifically, the Fengcheng Power Plant construction platform collapse accident (FPCA) was taken as a practical case study. First, the ETM is applied to demonstrate the evolving nature of the accident. Then, the network of the accident-causing factors is constructed using the SD theory to analyze the dynamic change characteristics. The results indicate that the accident was caused by risk factors with complex interactions at the management level. An energy constraint failure occurred when the transfer of dangerous energy transpired at the physical entity level, inducing the event. The proposed approach can provide a useful reference for safety risk estimation and management in future major construction projects.
format Online
Article
Text
id pubmed-9656919
institution National Center for Biotechnology Information
language English
publishDate 2022
publisher MDPI
record_format MEDLINE/PubMed
spelling pubmed-96569192022-11-15 Safety Risk Estimation of Construction Project Based on Energy Transfer Model and System Dynamics: A Case Study of Collapse Accident in China Zhang, Yongcheng Xing, Xuejiao Antwi-Afari, Maxwell Fordjour Wu, Mingqing Int J Environ Res Public Health Article Analyzing and understanding the occurrence and evolution mechanisms of construction accidents are important for construction safety management. This study proposed a hybrid approach of integrating the energy transfer model (ETM) and system dynamics (SD) theory to delineate the entire evolution stage of the construction accident. Specifically, the Fengcheng Power Plant construction platform collapse accident (FPCA) was taken as a practical case study. First, the ETM is applied to demonstrate the evolving nature of the accident. Then, the network of the accident-causing factors is constructed using the SD theory to analyze the dynamic change characteristics. The results indicate that the accident was caused by risk factors with complex interactions at the management level. An energy constraint failure occurred when the transfer of dangerous energy transpired at the physical entity level, inducing the event. The proposed approach can provide a useful reference for safety risk estimation and management in future major construction projects. MDPI 2022-11-03 /pmc/articles/PMC9656919/ /pubmed/36361263 http://dx.doi.org/10.3390/ijerph192114386 Text en © 2022 by the authors. https://creativecommons.org/licenses/by/4.0/Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/).
spellingShingle Article
Zhang, Yongcheng
Xing, Xuejiao
Antwi-Afari, Maxwell Fordjour
Wu, Mingqing
Safety Risk Estimation of Construction Project Based on Energy Transfer Model and System Dynamics: A Case Study of Collapse Accident in China
title Safety Risk Estimation of Construction Project Based on Energy Transfer Model and System Dynamics: A Case Study of Collapse Accident in China
title_full Safety Risk Estimation of Construction Project Based on Energy Transfer Model and System Dynamics: A Case Study of Collapse Accident in China
title_fullStr Safety Risk Estimation of Construction Project Based on Energy Transfer Model and System Dynamics: A Case Study of Collapse Accident in China
title_full_unstemmed Safety Risk Estimation of Construction Project Based on Energy Transfer Model and System Dynamics: A Case Study of Collapse Accident in China
title_short Safety Risk Estimation of Construction Project Based on Energy Transfer Model and System Dynamics: A Case Study of Collapse Accident in China
title_sort safety risk estimation of construction project based on energy transfer model and system dynamics: a case study of collapse accident in china
topic Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9656919/
https://www.ncbi.nlm.nih.gov/pubmed/36361263
http://dx.doi.org/10.3390/ijerph192114386
work_keys_str_mv AT zhangyongcheng safetyriskestimationofconstructionprojectbasedonenergytransfermodelandsystemdynamicsacasestudyofcollapseaccidentinchina
AT xingxuejiao safetyriskestimationofconstructionprojectbasedonenergytransfermodelandsystemdynamicsacasestudyofcollapseaccidentinchina
AT antwiafarimaxwellfordjour safetyriskestimationofconstructionprojectbasedonenergytransfermodelandsystemdynamicsacasestudyofcollapseaccidentinchina
AT wumingqing safetyriskestimationofconstructionprojectbasedonenergytransfermodelandsystemdynamicsacasestudyofcollapseaccidentinchina