Cargando…

Applying the Toyota production system to decrease the time required to transport patients undergoing surgery from the general ward to the operating room and reviewing the essence of lean thinking

BACKGROUND: Sending a patient to the operating room is the first step in surgery. Delayed patient transport causes the patient to go hungry for a longer time, aggravating the patient’s physical discomfort and psychological stress. The issue of delays in transporting inpatients to the operating room...

Descripción completa

Detalles Bibliográficos
Autores principales: Lin, Chien-Chung, Chueh, Jui-Wen, Chen, Hung-Ming, Chiu, Yao-Hui, Chu, Dachen
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Frontiers Media S.A. 2022
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9769121/
https://www.ncbi.nlm.nih.gov/pubmed/36569138
http://dx.doi.org/10.3389/fmed.2022.1054583
_version_ 1784854319398387712
author Lin, Chien-Chung
Chueh, Jui-Wen
Chen, Hung-Ming
Chiu, Yao-Hui
Chu, Dachen
author_facet Lin, Chien-Chung
Chueh, Jui-Wen
Chen, Hung-Ming
Chiu, Yao-Hui
Chu, Dachen
author_sort Lin, Chien-Chung
collection PubMed
description BACKGROUND: Sending a patient to the operating room is the first step in surgery. Delayed patient transport causes the patient to go hungry for a longer time, aggravating the patient’s physical discomfort and psychological stress. The issue of delays in transporting inpatients to the operating room has rarely been discussed in the literature. The Toyota production system is a famous and excellent scientific method of reducing waste and increasing efficiency. Our goal is to use the Toyota method to decrease the time required to transport the inpatient to the operating room and to review the concepts underlying lean thinking. METHODS: We employed an A3 8-step problem-solving process. A current value stream map featuring numerical data (concerning 46 patients) measured in the workplace was developed. The total time spent on transport was 53 min, but we expected patients to be transported within 30 min. We hoped to reduce the time wasted by half, i.e., by 23*50% = 12 min. These 12 min were saved by reducing the time spent on “waiting for an attendant at the ward” by 9 min and the time spent on “elevator transport” by 3 min. According to the value stream map featuring the time measurements, the root causes of delayed transportation can be divided into process-related, attendant-related, and elevator-related factors. We formulated 5 countermeasures. The ECRS (Eliminate, Combine, Rearrange, Simplify) technique was used to rearrange, combine, and simplify the existing process. Hospital executives established norms for attendant prioritization of work and rules for elevator use. RESULTS: According to the original indicators, all goals were attained. “Total time spent” decreased by 62.3%. The time required for attendants to report to the nursing station decreased by 56.5%. The time spent on elevator transport decreased by 44.4%. We developed a process for future use based on information-assisted patient and staff identification. Finally, we standardized successful processes. CONCLUSION: The seemingly trivial factors that delay patient transport are associated with seven types of waste. The A3 8-step problem-solving process is useful in this context. In proposing this improvement process, we believe that we are following the spirit of the Toyota production system.
format Online
Article
Text
id pubmed-9769121
institution National Center for Biotechnology Information
language English
publishDate 2022
publisher Frontiers Media S.A.
record_format MEDLINE/PubMed
spelling pubmed-97691212022-12-22 Applying the Toyota production system to decrease the time required to transport patients undergoing surgery from the general ward to the operating room and reviewing the essence of lean thinking Lin, Chien-Chung Chueh, Jui-Wen Chen, Hung-Ming Chiu, Yao-Hui Chu, Dachen Front Med (Lausanne) Medicine BACKGROUND: Sending a patient to the operating room is the first step in surgery. Delayed patient transport causes the patient to go hungry for a longer time, aggravating the patient’s physical discomfort and psychological stress. The issue of delays in transporting inpatients to the operating room has rarely been discussed in the literature. The Toyota production system is a famous and excellent scientific method of reducing waste and increasing efficiency. Our goal is to use the Toyota method to decrease the time required to transport the inpatient to the operating room and to review the concepts underlying lean thinking. METHODS: We employed an A3 8-step problem-solving process. A current value stream map featuring numerical data (concerning 46 patients) measured in the workplace was developed. The total time spent on transport was 53 min, but we expected patients to be transported within 30 min. We hoped to reduce the time wasted by half, i.e., by 23*50% = 12 min. These 12 min were saved by reducing the time spent on “waiting for an attendant at the ward” by 9 min and the time spent on “elevator transport” by 3 min. According to the value stream map featuring the time measurements, the root causes of delayed transportation can be divided into process-related, attendant-related, and elevator-related factors. We formulated 5 countermeasures. The ECRS (Eliminate, Combine, Rearrange, Simplify) technique was used to rearrange, combine, and simplify the existing process. Hospital executives established norms for attendant prioritization of work and rules for elevator use. RESULTS: According to the original indicators, all goals were attained. “Total time spent” decreased by 62.3%. The time required for attendants to report to the nursing station decreased by 56.5%. The time spent on elevator transport decreased by 44.4%. We developed a process for future use based on information-assisted patient and staff identification. Finally, we standardized successful processes. CONCLUSION: The seemingly trivial factors that delay patient transport are associated with seven types of waste. The A3 8-step problem-solving process is useful in this context. In proposing this improvement process, we believe that we are following the spirit of the Toyota production system. Frontiers Media S.A. 2022-12-07 /pmc/articles/PMC9769121/ /pubmed/36569138 http://dx.doi.org/10.3389/fmed.2022.1054583 Text en Copyright © 2022 Lin, Chueh, Chen, Chiu and Chu. https://creativecommons.org/licenses/by/4.0/This is an open-access article distributed under the terms of the Creative Commons Attribution License (CC BY). The use, distribution or reproduction in other forums is permitted, provided the original author(s) and the copyright owner(s) are credited and that the original publication in this journal is cited, in accordance with accepted academic practice. No use, distribution or reproduction is permitted which does not comply with these terms.
spellingShingle Medicine
Lin, Chien-Chung
Chueh, Jui-Wen
Chen, Hung-Ming
Chiu, Yao-Hui
Chu, Dachen
Applying the Toyota production system to decrease the time required to transport patients undergoing surgery from the general ward to the operating room and reviewing the essence of lean thinking
title Applying the Toyota production system to decrease the time required to transport patients undergoing surgery from the general ward to the operating room and reviewing the essence of lean thinking
title_full Applying the Toyota production system to decrease the time required to transport patients undergoing surgery from the general ward to the operating room and reviewing the essence of lean thinking
title_fullStr Applying the Toyota production system to decrease the time required to transport patients undergoing surgery from the general ward to the operating room and reviewing the essence of lean thinking
title_full_unstemmed Applying the Toyota production system to decrease the time required to transport patients undergoing surgery from the general ward to the operating room and reviewing the essence of lean thinking
title_short Applying the Toyota production system to decrease the time required to transport patients undergoing surgery from the general ward to the operating room and reviewing the essence of lean thinking
title_sort applying the toyota production system to decrease the time required to transport patients undergoing surgery from the general ward to the operating room and reviewing the essence of lean thinking
topic Medicine
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9769121/
https://www.ncbi.nlm.nih.gov/pubmed/36569138
http://dx.doi.org/10.3389/fmed.2022.1054583
work_keys_str_mv AT linchienchung applyingthetoyotaproductionsystemtodecreasethetimerequiredtotransportpatientsundergoingsurgeryfromthegeneralwardtotheoperatingroomandreviewingtheessenceofleanthinking
AT chuehjuiwen applyingthetoyotaproductionsystemtodecreasethetimerequiredtotransportpatientsundergoingsurgeryfromthegeneralwardtotheoperatingroomandreviewingtheessenceofleanthinking
AT chenhungming applyingthetoyotaproductionsystemtodecreasethetimerequiredtotransportpatientsundergoingsurgeryfromthegeneralwardtotheoperatingroomandreviewingtheessenceofleanthinking
AT chiuyaohui applyingthetoyotaproductionsystemtodecreasethetimerequiredtotransportpatientsundergoingsurgeryfromthegeneralwardtotheoperatingroomandreviewingtheessenceofleanthinking
AT chudachen applyingthetoyotaproductionsystemtodecreasethetimerequiredtotransportpatientsundergoingsurgeryfromthegeneralwardtotheoperatingroomandreviewingtheessenceofleanthinking