Cargando…

Performance evaluation and financial viability analysis of grid associated 10 MW(P) solar photovoltaic power plant at UP India

The main aim of this simulation work is to assess the financial possibility analysis of 10 MW(P) grid-associated solar photovoltaic (PV) power plants in seven cities i.e. Lucknow, Agra, Meerut, Gorakhpur, Kanpur, Allahabad, and Varanasi of Uttar Pradesh (UP) state of India with the RETScreen Softwar...

Descripción completa

Detalles Bibliográficos
Autores principales: Singh, Shailendra, Alharthi, Majed, Anand, Abhishek, Shukla, Amritanshu, Sharma, Atul, Panchal, Hitesh
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Nature Publishing Group UK 2022
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9792540/
https://www.ncbi.nlm.nih.gov/pubmed/36572716
http://dx.doi.org/10.1038/s41598-022-26817-4
_version_ 1784859657415688192
author Singh, Shailendra
Alharthi, Majed
Anand, Abhishek
Shukla, Amritanshu
Sharma, Atul
Panchal, Hitesh
author_facet Singh, Shailendra
Alharthi, Majed
Anand, Abhishek
Shukla, Amritanshu
Sharma, Atul
Panchal, Hitesh
author_sort Singh, Shailendra
collection PubMed
description The main aim of this simulation work is to assess the financial possibility analysis of 10 MW(P) grid-associated solar photovoltaic (PV) power plants in seven cities i.e. Lucknow, Agra, Meerut, Gorakhpur, Kanpur, Allahabad, and Varanasi of Uttar Pradesh (UP) state of India with the RETScreen Software. The presented research work demonstrates the method of selection of profitable locations for solar PV power plants according to financial viability indicators. It is found that Allahabad city is the most profitable site with values of 16,686 MWh of electricity exported to the grid (EEG), US$20,896.30/year of electricity export revenue (EER), 9.4 years of simple payback period (SPP), 7.7 years of equity payback period (EPP), 19545.9 tCO(2)/year of GHG emission reduction, US$3492.82/year of the annual life cycle savings (ALCS), 1.5 benefit-cost (B-C) ratio, US$27394.59 of net present value (NPV), 16.5% internal rate of return on equity (IRR-equity), 12.3% modified internal rate of return on equity (MIRR-equity), 5.4% internal rate of return on assets (IRR-assets), and 7% modified internal rate of return on assets (MIRR-assets). The second most profitable site is found in Gorakhpur city and Varanasi city is found the least profitable site. The other two cities, Agra and Kanpur are not found suitable because of the negative values of NPV and ALCS.
format Online
Article
Text
id pubmed-9792540
institution National Center for Biotechnology Information
language English
publishDate 2022
publisher Nature Publishing Group UK
record_format MEDLINE/PubMed
spelling pubmed-97925402022-12-28 Performance evaluation and financial viability analysis of grid associated 10 MW(P) solar photovoltaic power plant at UP India Singh, Shailendra Alharthi, Majed Anand, Abhishek Shukla, Amritanshu Sharma, Atul Panchal, Hitesh Sci Rep Article The main aim of this simulation work is to assess the financial possibility analysis of 10 MW(P) grid-associated solar photovoltaic (PV) power plants in seven cities i.e. Lucknow, Agra, Meerut, Gorakhpur, Kanpur, Allahabad, and Varanasi of Uttar Pradesh (UP) state of India with the RETScreen Software. The presented research work demonstrates the method of selection of profitable locations for solar PV power plants according to financial viability indicators. It is found that Allahabad city is the most profitable site with values of 16,686 MWh of electricity exported to the grid (EEG), US$20,896.30/year of electricity export revenue (EER), 9.4 years of simple payback period (SPP), 7.7 years of equity payback period (EPP), 19545.9 tCO(2)/year of GHG emission reduction, US$3492.82/year of the annual life cycle savings (ALCS), 1.5 benefit-cost (B-C) ratio, US$27394.59 of net present value (NPV), 16.5% internal rate of return on equity (IRR-equity), 12.3% modified internal rate of return on equity (MIRR-equity), 5.4% internal rate of return on assets (IRR-assets), and 7% modified internal rate of return on assets (MIRR-assets). The second most profitable site is found in Gorakhpur city and Varanasi city is found the least profitable site. The other two cities, Agra and Kanpur are not found suitable because of the negative values of NPV and ALCS. Nature Publishing Group UK 2022-12-26 /pmc/articles/PMC9792540/ /pubmed/36572716 http://dx.doi.org/10.1038/s41598-022-26817-4 Text en © The Author(s) 2022 https://creativecommons.org/licenses/by/4.0/Open Access This article is licensed under a Creative Commons Attribution 4.0 International License, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons licence, and indicate if changes were made. The images or other third party material in this article are included in the article's Creative Commons licence, unless indicated otherwise in a credit line to the material. If material is not included in the article's Creative Commons licence and your intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain permission directly from the copyright holder. To view a copy of this licence, visit http://creativecommons.org/licenses/by/4.0/ (https://creativecommons.org/licenses/by/4.0/) .
spellingShingle Article
Singh, Shailendra
Alharthi, Majed
Anand, Abhishek
Shukla, Amritanshu
Sharma, Atul
Panchal, Hitesh
Performance evaluation and financial viability analysis of grid associated 10 MW(P) solar photovoltaic power plant at UP India
title Performance evaluation and financial viability analysis of grid associated 10 MW(P) solar photovoltaic power plant at UP India
title_full Performance evaluation and financial viability analysis of grid associated 10 MW(P) solar photovoltaic power plant at UP India
title_fullStr Performance evaluation and financial viability analysis of grid associated 10 MW(P) solar photovoltaic power plant at UP India
title_full_unstemmed Performance evaluation and financial viability analysis of grid associated 10 MW(P) solar photovoltaic power plant at UP India
title_short Performance evaluation and financial viability analysis of grid associated 10 MW(P) solar photovoltaic power plant at UP India
title_sort performance evaluation and financial viability analysis of grid associated 10 mw(p) solar photovoltaic power plant at up india
topic Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9792540/
https://www.ncbi.nlm.nih.gov/pubmed/36572716
http://dx.doi.org/10.1038/s41598-022-26817-4
work_keys_str_mv AT singhshailendra performanceevaluationandfinancialviabilityanalysisofgridassociated10mwpsolarphotovoltaicpowerplantatupindia
AT alharthimajed performanceevaluationandfinancialviabilityanalysisofgridassociated10mwpsolarphotovoltaicpowerplantatupindia
AT anandabhishek performanceevaluationandfinancialviabilityanalysisofgridassociated10mwpsolarphotovoltaicpowerplantatupindia
AT shuklaamritanshu performanceevaluationandfinancialviabilityanalysisofgridassociated10mwpsolarphotovoltaicpowerplantatupindia
AT sharmaatul performanceevaluationandfinancialviabilityanalysisofgridassociated10mwpsolarphotovoltaicpowerplantatupindia
AT panchalhitesh performanceevaluationandfinancialviabilityanalysisofgridassociated10mwpsolarphotovoltaicpowerplantatupindia