Performance evaluation and financial viability analysis of grid associated 10 MW(P) solar photovoltaic power plant at UP India
The main aim of this simulation work is to assess the financial possibility analysis of 10 MW(P) grid-associated solar photovoltaic (PV) power plants in seven cities i.e. Lucknow, Agra, Meerut, Gorakhpur, Kanpur, Allahabad, and Varanasi of Uttar Pradesh (UP) state of India with the RETScreen Softwar...
Autores principales: | , , , , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Nature Publishing Group UK
2022
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9792540/ https://www.ncbi.nlm.nih.gov/pubmed/36572716 http://dx.doi.org/10.1038/s41598-022-26817-4 |
_version_ | 1784859657415688192 |
---|---|
author | Singh, Shailendra Alharthi, Majed Anand, Abhishek Shukla, Amritanshu Sharma, Atul Panchal, Hitesh |
author_facet | Singh, Shailendra Alharthi, Majed Anand, Abhishek Shukla, Amritanshu Sharma, Atul Panchal, Hitesh |
author_sort | Singh, Shailendra |
collection | PubMed |
description | The main aim of this simulation work is to assess the financial possibility analysis of 10 MW(P) grid-associated solar photovoltaic (PV) power plants in seven cities i.e. Lucknow, Agra, Meerut, Gorakhpur, Kanpur, Allahabad, and Varanasi of Uttar Pradesh (UP) state of India with the RETScreen Software. The presented research work demonstrates the method of selection of profitable locations for solar PV power plants according to financial viability indicators. It is found that Allahabad city is the most profitable site with values of 16,686 MWh of electricity exported to the grid (EEG), US$20,896.30/year of electricity export revenue (EER), 9.4 years of simple payback period (SPP), 7.7 years of equity payback period (EPP), 19545.9 tCO(2)/year of GHG emission reduction, US$3492.82/year of the annual life cycle savings (ALCS), 1.5 benefit-cost (B-C) ratio, US$27394.59 of net present value (NPV), 16.5% internal rate of return on equity (IRR-equity), 12.3% modified internal rate of return on equity (MIRR-equity), 5.4% internal rate of return on assets (IRR-assets), and 7% modified internal rate of return on assets (MIRR-assets). The second most profitable site is found in Gorakhpur city and Varanasi city is found the least profitable site. The other two cities, Agra and Kanpur are not found suitable because of the negative values of NPV and ALCS. |
format | Online Article Text |
id | pubmed-9792540 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2022 |
publisher | Nature Publishing Group UK |
record_format | MEDLINE/PubMed |
spelling | pubmed-97925402022-12-28 Performance evaluation and financial viability analysis of grid associated 10 MW(P) solar photovoltaic power plant at UP India Singh, Shailendra Alharthi, Majed Anand, Abhishek Shukla, Amritanshu Sharma, Atul Panchal, Hitesh Sci Rep Article The main aim of this simulation work is to assess the financial possibility analysis of 10 MW(P) grid-associated solar photovoltaic (PV) power plants in seven cities i.e. Lucknow, Agra, Meerut, Gorakhpur, Kanpur, Allahabad, and Varanasi of Uttar Pradesh (UP) state of India with the RETScreen Software. The presented research work demonstrates the method of selection of profitable locations for solar PV power plants according to financial viability indicators. It is found that Allahabad city is the most profitable site with values of 16,686 MWh of electricity exported to the grid (EEG), US$20,896.30/year of electricity export revenue (EER), 9.4 years of simple payback period (SPP), 7.7 years of equity payback period (EPP), 19545.9 tCO(2)/year of GHG emission reduction, US$3492.82/year of the annual life cycle savings (ALCS), 1.5 benefit-cost (B-C) ratio, US$27394.59 of net present value (NPV), 16.5% internal rate of return on equity (IRR-equity), 12.3% modified internal rate of return on equity (MIRR-equity), 5.4% internal rate of return on assets (IRR-assets), and 7% modified internal rate of return on assets (MIRR-assets). The second most profitable site is found in Gorakhpur city and Varanasi city is found the least profitable site. The other two cities, Agra and Kanpur are not found suitable because of the negative values of NPV and ALCS. Nature Publishing Group UK 2022-12-26 /pmc/articles/PMC9792540/ /pubmed/36572716 http://dx.doi.org/10.1038/s41598-022-26817-4 Text en © The Author(s) 2022 https://creativecommons.org/licenses/by/4.0/Open Access This article is licensed under a Creative Commons Attribution 4.0 International License, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons licence, and indicate if changes were made. The images or other third party material in this article are included in the article's Creative Commons licence, unless indicated otherwise in a credit line to the material. If material is not included in the article's Creative Commons licence and your intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain permission directly from the copyright holder. To view a copy of this licence, visit http://creativecommons.org/licenses/by/4.0/ (https://creativecommons.org/licenses/by/4.0/) . |
spellingShingle | Article Singh, Shailendra Alharthi, Majed Anand, Abhishek Shukla, Amritanshu Sharma, Atul Panchal, Hitesh Performance evaluation and financial viability analysis of grid associated 10 MW(P) solar photovoltaic power plant at UP India |
title | Performance evaluation and financial viability analysis of grid associated 10 MW(P) solar photovoltaic power plant at UP India |
title_full | Performance evaluation and financial viability analysis of grid associated 10 MW(P) solar photovoltaic power plant at UP India |
title_fullStr | Performance evaluation and financial viability analysis of grid associated 10 MW(P) solar photovoltaic power plant at UP India |
title_full_unstemmed | Performance evaluation and financial viability analysis of grid associated 10 MW(P) solar photovoltaic power plant at UP India |
title_short | Performance evaluation and financial viability analysis of grid associated 10 MW(P) solar photovoltaic power plant at UP India |
title_sort | performance evaluation and financial viability analysis of grid associated 10 mw(p) solar photovoltaic power plant at up india |
topic | Article |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9792540/ https://www.ncbi.nlm.nih.gov/pubmed/36572716 http://dx.doi.org/10.1038/s41598-022-26817-4 |
work_keys_str_mv | AT singhshailendra performanceevaluationandfinancialviabilityanalysisofgridassociated10mwpsolarphotovoltaicpowerplantatupindia AT alharthimajed performanceevaluationandfinancialviabilityanalysisofgridassociated10mwpsolarphotovoltaicpowerplantatupindia AT anandabhishek performanceevaluationandfinancialviabilityanalysisofgridassociated10mwpsolarphotovoltaicpowerplantatupindia AT shuklaamritanshu performanceevaluationandfinancialviabilityanalysisofgridassociated10mwpsolarphotovoltaicpowerplantatupindia AT sharmaatul performanceevaluationandfinancialviabilityanalysisofgridassociated10mwpsolarphotovoltaicpowerplantatupindia AT panchalhitesh performanceevaluationandfinancialviabilityanalysisofgridassociated10mwpsolarphotovoltaicpowerplantatupindia |