Cargando…

Bottom-hole pressure drawdown management of fractured horizontal wells in shale gas reservoirs using a semi-analytical model

Due to strong stress sensitivity resulted from unconventional tight formationsit is of practical interest to formulate a reasonable pressure drawdown plan to improve gas extraction recovery. The impact of water-shale interactions on the reservoir permeability was previously ignored in the managed pr...

Descripción completa

Detalles Bibliográficos
Autores principales: Xu, Yingying, Liu, Xiangui, Hu, Zhiming, Duan, Xianggang, Chang, Jin
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Nature Publishing Group UK 2022
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9797488/
https://www.ncbi.nlm.nih.gov/pubmed/36577771
http://dx.doi.org/10.1038/s41598-022-26978-2
Descripción
Sumario:Due to strong stress sensitivity resulted from unconventional tight formationsit is of practical interest to formulate a reasonable pressure drawdown plan to improve gas extraction recovery. The impact of water-shale interactions on the reservoir permeability was previously ignored in the managed pressure drawdown optimization. The controlled-pressure production dynamic analysis was mostly conducted using numerical simulation, lack of rigorous theoretical support. Hence in this paper, a theoretical production prediction model was proposed and verified with HIS RTA 2015by incorporating multiple pressure drawdown mechanisms and various non-linear gas flow process. The on-site production effects dominated by two different pressure drop methods was further compared, indicating that compared to depressurization production, the production reversion can occur in the controlled pressure production process and the EUR of single well can be increased by about 30% under the control of managed pressure drawdown approach. Finally, the pressure drawdown optimization strategy was carried out on the field test from the both production effect and economic benefits, which demonstrated that the best economic solution can generally be obtained in the early stage of production. The research results can be closely linked to the on-site production practice of shale gas wells, providing insights into designing optimized production strategy scheme.